Viewing latest data (updated 18/04/2024 10:00)

Outfall

Structure

The structure at the point where surface water drains discharge into a watercourse or the sea.

Outfalls may have a flap valve or gate fitted to prevent reversal of flow during flood flows. If the flap is simple non-return valve that opens and closes under the force of the flow, then this is an element of the outfall.

If there is a control gate such as a penstock which can be adjusted or controlled, this should be classified as a separate control gate asset.

Where smaller watercourses discharge into larger watercourses through culverted sections, these should be recorded as culverts with or without a control gate asset as applicable.

Outfall (diagram).
Outfall (diagram).
An example of an Outfall.
An example of an Outfall.
A second example of an Outfall.
A second example of an Outfall.

Outfalls are displayed in the Environment Agency's AIMS OM system as a point in the centre of the structure.

Environment Agency symbology for Outfall.
Environment Agency symbology for Outfall.

Links to Environment Agency Smart Objects (login required - request access here)
Concrete Outfall

Elements

An Element Type is a component part of an Asset Type. Each Asset Type (except Asset Complex assets) will comprise of a prescribed set of Element Types.  Some Element Types are essential and must be present to define an asset of that Asset Type.  Other Element Types are optional, to be included when needed to define a particular Asset Type instance. An individual asset may have more than one instance of each Element Type.

This table lists the Element Types applicable to this Asset Type.

Element TypeDescriptionElement CodeEssentialUniclass 2015Updates
ActuatorA component of a machine that is responsible for moving and controlling a mechanism on receiving a control signal.ACTNoPr_75_50_0211-04-2023
View history
Request changes
ApronThe scour protection structure laid immediately upstream and/or downstream of a structure.APNNoSL_32_50_7611-04-2023
View history
Request changes
Balance WeightA weight used to counterbalance a gate.BWTNoPr_30_59_12_0711-04-2023
View history
Request changes
Check ValveA valve to ensure water is only able to flow in one direction, and therefore prevent water flowing in the opposite direction. A check valve is not hinged or pivoted.CHVNoPr_65_54_95_0526-02-2024
View history
Request changes
DampersDevices which reduce movement or vibration by dissipating energy.DMPNoPr_20_85_7611-04-2023
View history
Request changes
DavitAn appliance used for lifting, usually fitted into a pre-installed ground socket prior to use and then removed for storage.DAVNoPr_40_70_75_2111-04-2023
View history
Request changes
Downstream HeadwallA retaining wall at the outlet of a culvert. Includes wingwalls (either as one continuous element or as additional headwall elements if they are a separate construction).DSHNoSs_20_50_30_3711-04-2023
View history
Request changes
Fixed Fall Arrest SystemA system installed for the safety of operatives when working from heights to ensure they are not able to fall.FFANoSs_80_30_25_8011-04-2023
View history
Request changes
Flap ValveA non-return valve which is hinged or pivoted, and closes under a head of water to prevent backflow.FVENoPr_65_54_94_2926-02-2024
View history
Request changes
FloatsSomething that is buoyant in water and is attached to other items to stop them from sinking.FLTNoPr_40_70_55_3026-02-2024
View history
Request changes
FrameA rigid structure that surrounds or supports something.FRMNoSs_20_1011-04-2023
View history
Request changes
GantryA bridge-like framework or platform suspended over or adjacent to assets. A gantry can support equipment or allow people to access or walk over the top of assets.GANNoSs_37_17_3511-04-2023
View history
Request changes
Jib CraneA type of crane which has a horizontal arm fixed to an upright mast. A moveable hoist is attached to the horizontal arm.JIBNoTE_30_10_10_4411-04-2023
View history
Request changes
LadderA ladder that is fixed in place or designed for a particular location to enable access to and egress from part of an asset or group of assets. Includes step irons.LADNoPr_25_30_85_0211-04-2023
View history
Request changes
MotorA machine that uses electricity to produce movement, to make a machine work.MOTNoPr_75_51_2611-04-2023
View history
Request changes
Overhead CraneA hoist that travels along a suspended beam, and the suspended beam can travel along parallel rails. Also known as a bridge crane or gantry crane.OHCNoSs_80_30_15_5917-07-2023
View history
Request changes
Pet FlapA small flapped opening through an outfall or control gate designed to allow the migration of fish, eels or lamprey through the outfall structure.PETNoPr_45_28_30_6511-04-2023
View history
Request changes
PipePart of a structure that allows water to flow into or out of an asset.PIPYesPr_65_52_6311-04-2023
View history
Request changes
SpringsAn elastic device, typically a metal coil/helix, that can be compressed or stretched but returns to its former shape when released. Used primarily to exert constant tension or absorb movement.SPRNoPr_80_77_94_8411-04-2023
View history
Request changes
Stoplogs and LasherboardsRemovable boards or blocks which are slotted into a frame to act as a barrier to water flow.SLGNoPr_60_45_30_8411-04-2023
View history
Request changes
Structural SteelworkThe steelwork within a building or part of an asset that is load bearing and provides overall structural support that needs inspections/maintenance over and above any of the other element types.STLNoSs_20_10_7526-02-2024
View history
Request changes
Treads and RisersThe alternating horizontal (treads) and vertical (risers) elements that make up a set of steps. The Treads and Risers element should be used where steps provide access to a structure, instrument, building, etc.TRRNoPr_25_30_9021-08-2023
View history
Request changes
Upstream HeadwallA retaining wall at the inlet of a culvert or outfall. Includes wingwalls (either as one continuous element or as additional headwall elements if they are a separate construction).UHLNoSs_20_50_30_3711-04-2023
View history
Request changes
WinchA mechanical hauling or lifting device consisting of a rope or chain wound round a rotating drum, turned typically by a crank or by motor.WCHNoPr_65_80_47_9811-04-2023
View history
Request changes
Request new Element

Attributes

An attribute is a particular piece of data that describes a property of an object. Each Asset Type is described by a different set of attributes, although there are some attributes that are common to many Asset Types.

The table below lists the attributes that are applicable to this Asset Type, along with the data profile requirements for each attribute and details of when and how each should be used and delivered.

AttributeFormat DetailsDeliveryPurposeMandatorygeoCOBie MappingUpdates
Alerts In Use?
Are alerts in use at the site of this asset?
Picklist
Yes No
EA7P09 OperationsNoFeature.Attribute.Name.AlertsInUse27-04-2021
View history
Request changes
Alt. Asset Ref
The alternative asset reference used to cross reference to other data systems
Text
Max Length: 150
EA2P09 OperationsNoFeature.Attribute.Name.AltAssetRef27-04-2021
View history
Request changes
Alternative Purpose 1
An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P01 RegistrationNoFeature.Attribute.Name.AlternativePurpose127-04-2021

Picklist edited 14-06-2021


View history
Request changes
Alternative Purpose 2
An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P01 RegistrationNoFeature.Attribute.Name.AlternativePurpose227-04-2021

Picklist edited 14-06-2021


View history
Request changes
Annual Maintenance Costs (Current FY)
How much the asset costs this year to maintain to target condition
Number
Max: 1,000,000,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P10 MaintenanceNoFeature.Attribute.Name.AnnualMaintenanceCostsCurrentFY27-04-2021
View history
Request changes
Annual Maintenance Costs (Previous FY)
How much the asset cost last year to maintain to target condition
Number
Max: 1,000,000,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P10 MaintenanceNoFeature.Attribute.Name.AnnualMaintenanceCostsPreviousFY27-04-2021
View history
Request changes
Asbestos on Site
Is asbestos present on site?
Picklist
Asbestos on site, confirmed by survey. No asbestos on site, confirmed by survey or constructed post-2000. Presence of asbestos on site unknown.
EA3P03 Risk managementNoFeature.Attribute.Name.AsbestosOnSite12-05-2023
View history
Request changes
Asset Availability
The Asset Availability is the normalised product of the individual Asset Element availabilities within the Asset. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.AssetAvailability27-04-2021
View history
Request changes
Asset Below MEICA Condition Target
An indication that an asset has an Asset Availability below its MEICA condition target. Only applicable when MEICA Elements Present = True
BooleanEA7P15 InspectionYesFeature.Attribute.Name.AssetBelowMEICAConditionTarget27-04-2021
View history
Request changes
Asset Category
The Category of the asset
Picklist
Structure
EA2P01 RegistrationYesFeature.Attribute.Name.AssetCategory27-04-2021
View history
Request changes
Asset Complex 1
The ID (GUID) of the Asset Complex that this asset belongs to
Text
Max Length: 32
EA6P09 OperationsNoFeature.Attribute.Name.AssetComplex227-04-2021
View history
Request changes
Asset Complex 2
The ID (GUID) of the Secondary Asset Complex that the asset belongs to
Text
Max Length: 32
EA6P09 OperationsNoFeature.Attribute.Name.AssetComplex127-04-2021
View history
Request changes
Asset Complex Ref 1
The Asset Reference of the first Asset Complex which contains this asset
Text
Asset code xx + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetComplexRef127-04-2021
View history
Request changes
Asset Complex Ref 2
The Asset Reference of an additional Asset Complex which contains this asset
Text
Asset code xx + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetComplexRef227-04-2021
View history
Request changes
Asset End Date
The end date of the asset. This is only to be populated when asset is withdrawn or fully decommissioned
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetEndDate27-04-2021
View history
Request changes
Asset Factored Availability Override
An indication of the use of a manually entered value for Site Factored Availability, instead of the value calculated by default. Only applicable when MEICA Elements Present = True
BooleanEA7P09 OperationsYesFeature.Attribute.Name.AssetFactoredAvailabilityOverride27-04-2021
View history
Request changes
Asset Height
The total height of the structure, taken from ground level to its highest tangible point.
Number
Max: 200.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P01 RegistrationNoFeature.Attribute.Name.AssetHeight17-10-2023
View history
Request changes
Asset Height DQF
Data Quality Flag for the Asset Height attribute. Mandatory if an Asset Height value is present.
Picklist
DQF 1 : +/- 0.01m to 0.05m vertical accuracy (Typically on-site survey, including recent (post 2016) high resolution lidar with additional on-site ground validation) DQF 2a : +/- >0.05m to 0.10m vertical accuracy (Typically recent standard lidar survey - post 2016) DQF 2b : +/- >0.05m to 0.15m vertical accuracy (Typically lidar surveyed between 2004 and 2016, or photogrammetry) DQF 3 : +/- 0.15m to 0.75m vertical accuracy (Typically older (pre-2004) lidar or Photogrammetry) DQF 4 : +/- 0.75m or more vertical accuracy DQF 0 : unknown quality
EA3P01 RegistrationNoFeature.Attribute.Name.AssetHeightDQF26-02-2024
View history
Request changes
Asset Height DQF Date
The date the Asset Height DQF attribute was input. Mandatory if an Asset Height value is present.
DateEA3P01 RegistrationNoFeature.Attribute.Name.AssetHeightDQFDate26-02-2024
View history
Request changes
Asset ID
The Asset ID from the AIMS OM system, if known. For new assets that are not yet in AIMS OM, use "n/a".
Text
Max Length: 50
EA2P01 RegistrationYesFeature.Attribute.Name.AssetID14-06-2021
View history
Request changes
Asset Length
The length of the asset
Number
Max: 10,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P01 RegistrationNoFeature.Attribute.Name.AssetLength17-10-2023
View history
Request changes
Asset Length DQF
Data Quality Flag for the Asset Length attribute. Mandatory if an Asset Length value is present.
Picklist
DQF 1 : +/- 0.01m to 0.05m horizontal accuracy (Typically on-site survey) DQF 2 : +/- >0.05m to 0.25m horizontal accuracy (Typically Lidar Point Cloud or Photogrammetry) DQF 3 : +/- 0.25m to 0.50m horizontal accuracy (Typically Lidar raster DEMs or Photogrammetry) DQF 4 : +/- 0.50m to 1.0m horizontal accuracy (Typically captured from OS Mapping (e.g. MasterMap 2023)) DQF 5 : >1m horizontal accuracy (Typically Google Maps etc) DQF 0 : unknown quality
EA3P01 RegistrationNoFeature.Attribute.Name.AssetLengthDQF26-02-2024
View history
Request changes
Asset Length DQF Date
The date the Asset Length DQF attribute was input. Mandatory if an Asset Length value is present.
DateEA3P01 RegistrationNoFeature.Attribute.Name.AssetLengthDQFDate26-02-2024
View history
Request changes
Asset Name
The name of the asset if it has one
Text
Max Length: 150
EA2P01 RegistrationNoFeature.Attribute.Name.AssetName27-04-2021
View history
Request changes
Asset Ref
Unique asset reference code in scheme context assigned by scheme designer, e.g. SU0123
Text
Asset code SU + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetRef27-04-2021
View history
Request changes
Asset Risk Value
The Risk Value is calculated as the Risk Variance multiplied by the Estimated Avoided Damages Value. Only applicable when MEICA Elements Present = True
Number
Max: 99,999,999,999.00
Min: -99,999,999,999.00
Number of decimal places: 2
Units: pounds
EA7P15 InspectionNoFeature.Attribute.Name.AssetRiskValue27-04-2021
View history
Request changes
Asset Risk Variance
The Risk Variance is calculated using the following formula: ((Factored Availability / FRMS 'MEICA Condition Target') - 1) * Used House Equivalent. Only applicable when MEICA Elements Present = True
Number
Max: 999,999.00
Min: -999,999.00
Number of decimal places: 2
EA7P15 InspectionNoFeature.Attribute.Name.AssetRiskVariance27-04-2021
View history
Request changes
Asset Start Date
The date the asset becomes operational
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDate27-04-2021
View history
Request changes
Asset Start Date DQF
Data Quality Flag for the Asset Start Date attribute. Mandatory if an Asset Start Date value is present.
Picklist
DQF 1 : Start Date known based on documented evidence (use 1st of month if day uncertain and June if month uncertain) DQF 2 : Start Date estimated based on local knowledge (use 1st of month if day uncertain and June if month uncertain) DQF 3 : Start Date estimated by decade (use 1st Jan and middle year of decade e.g. 01/01/1965) DQF 4: Start Date from legacy system DQF 5: Start date checked but unknown (leave date blank) DQF 0 : unknown quality (given to all existing AIMS OM Start Date)
EA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDateDQF26-02-2024

Picklist edited 18-04-2024


View history
Request changes
Asset Start Date DQF Date
The date the Asset Start Date DQF attribute was input. Mandatory if an Asset Start Date value is present.
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDateDQFDate26-02-2024
View history
Request changes
Asset Status
The status of the asset
Picklist
Active Discontinued New asset record for review No longer in use, but still on site Proposed asset Under construction
EA5P01 RegistrationYesFeature.Attribute.Name.AssetStatus27-04-2021

Picklist edited 18-04-2024


View history
Request changes
Asset Status Date
The date the status of the asset was assessed
DateEA5P01 RegistrationYesFeature.Attribute.Name.AssetStatusDate27-04-2021
View history
Request changes
Asset Type
The type of asset
Picklist
Outfall
EA2P01 RegistrationYesFeature.Attribute.Name.AssetType27-04-2021
View history
Request changes
Asset Width
The total width/span of the structure
Number
Max: 10,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P01 RegistrationNoFeature.Attribute.Name.AssetWidth26-02-2024
View history
Request changes
Asset Width DQF
Data Quality Flag for the Asset Width attribute. Mandatory if an Asset Width value is present.
Picklist
DQF 1 : +/- 0.01m to 0.05m horizontal accuracy (Typically on-site survey) DQF 2 : +/- >0.05m to 0.25m horizontal accuracy (Typically Lidar Point Cloud or Photogrammetry) DQF 3 : +/- 0.25m to 0.50m horizontal accuracy (Typically Lidar raster DEMs or Photogrammetry) DQF 4 : +/- 0.50m to 1.0m horizontal accuracy (Typically captured from OS Mapping (e.g. MasterMap 2023)) DQF 5 : >1m horizontal accuracy (Typically Google Maps etc) DQF 0 : unknown quality
EA3P01 RegistrationNoFeature.Attribute.Name.AssetWidthDQF26-02-2024
View history
Request changes
Asset Width DQF Date
The date the Asset Width DQF attribute was input. Mandatory if an Asset Width value is present.
DateEA3P01 RegistrationNoFeature.Attribute.Name.AssetWidthDQFDate26-02-2024
View history
Request changes
Below Required Condition
Is the Asset below required condition?
BooleanEA7P15 InspectionYesFeature.Attribute.Name.BelowRequiredCondition27-04-2021
View history
Request changes
Bounding Box
A geospatial orthogonal bounding box cube containing the extent of the asset. This is to be expressed as a JSON lineString: [[lower left point easting,lower left point northing,lowest point elevation],[upper right point easting,upper right point northing,highest point elevation]] of the cube with geoCOBie Unit of 'bbox:EPSG7405:ETRS89:OSTN15:OSGM15'
Geometry
Units: bbox:EPSG7405:ETRS89:OSTN15:OSGM15
EA2P01 RegistrationNoFeature.Attribute.Name.BoundingBox05-09-2022
View history
Request changes
BRC Date
The date that the Asset was inspected to be below required condition. Only available if Below Required Condition = Yes
DateEA7P09 OperationsNoFeature.Attribute.Name.BRCDate04-05-2021
View history
Request changes
Calculated Asset Availability
The Calculated Asset Availability is the value of asset availability which is used in further calculations, e.g. to compare against target. It is either the default value of Asset Availability or the Overridden Equivalent if this is used. Only applicable when MEICA Elements Present = True
Number
Max: 1.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.CalculatedAssetAvailability27-04-2021
View history
Request changes
Calculated Condition
The overall calculated condition of the asset based on the actual condition of the elements and the element weightings
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionYesFeature.Attribute.Name.CalculatedCondition27-04-2021
View history
Request changes
Candidate for Discontinuation
Is the Asset a candidate for Discontinuation?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.CandidateforDiscontinuation27-04-2021
View history
Request changes
Change Reason
The reason the asset's status has been changed. Mandatory when Reason for Asset Discontinued = Other.
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.ChangeReason26-02-2024
View history
Request changes
Comments
Other comments about the asset
Text
Max Length: 2000
EA2P09 OperationsNoFeature.Attribute.Name.Comments27-04-2021
View history
Request changes
Completion Date
The date that the inspection or assessment was completed
DateEA7P15 InspectionNoFeature.Attribute.Name.CompletionDate27-04-2021
View history
Request changes
Compliant with Eel Regulations?
Is the asset compliant with Eel Regulations?
Picklist
Yes No
EA7P09 OperationsNoFeature.Attribute.Name.CompliantWithEelRegulations26-02-2024
View history
Request changes
Condition Measure
The Condition Measure is the highest value in the ConditionThreshold table that is less than or equal to the Asset Availability. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.ConditionMeasure27-04-2021
View history
Request changes
Condition Target
A condition target against which to compare the Condition Measure. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.ConditionTarget27-04-2021
View history
Request changes
Confined Spaces
Is the site on the Confined Spaces Register?
BooleanEA3P09 OperationsYesFeature.Attribute.Name.ConfinedSpaces27-04-2021
View history
Request changes
Control LineString
A spatial lineString that locates the asset and further classified by the associated LineStringType attribute confirming its relative location to the asset. A lineString is a series of design or measured spatial triple points (easting, northing, elevation) each connected by a single non-crossing line, with single points at each end, that locate an asset. A lineString is expressed as a JSON array of type geoJSON lineString, e.g. [[x1,y1,z1],[x2,y2,z2],...] It is further classified by the associated LineStringType attribute confirming its relative location to the asset. Interim points should be spaced at a maximum of 2m for lines < 10m in length, or 10m otherwise. LineStrings may be open as in the case of linear asset types or closed (polygon) in the case of land or site assets. For linear assets, see the note in the description above about the maximum length. The default CRS is a 3D CRS to EPSG 7405 with confirmed type, European reference frame and UK OS transformation with geoCOBie Unit of 'LineString:EPSG7405:ETRS89:OSTN15:OSGM15'
Geometry
Units: LineString:EPSG7405:ETRS89:OSTN15:OSGM15
EA2P02 ComplianceNoFeature.Attribute.Name.ControlLineString05-09-2022
View history
Request changes
County
The county within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.County27-04-2021
View history
Request changes
Culvert Internal Inspection Expiry date
The expiry date of the last culvert internal inspection
DateEA7P09 OperationsNoFeature.Attribute.Name.CulvertInternalInspectionExpirydate27-04-2021
View history
Request changes
Current Condition
The current condition of the asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P09 OperationsNoFeature.Attribute.Name.CurrentCondition27-04-2021
View history
Request changes
Current SOP
The Standard of Protection (1:n) that the asset currently provides, if known
Number
Max: 9,999
Min: 0
Number of decimal places: 0
Units: 1:n years
EA7P09 OperationsYesFeature.Attribute.Name.CurrentSOP27-04-2021
View history
Request changes
Current SOP Date
The date the Current Standard of Protection was appraised
DateEA7P09 OperationsYesFeature.Attribute.Name.CurrentSOPDate27-04-2021
View history
Request changes
Current SOP DQF
The data quality flag for the Current Standard of Protection
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P09 OperationsYesFeature.Attribute.Name.CurrentSOPDQF27-04-2021
View history
Request changes
Current SOP DQF Date
The date the Data Quality Flag for the Current Standard of Protection was assessed
DateEA7P09 OperationsYesFeature.Attribute.Name.CurrentSOPDQFDate27-04-2021
View history
Request changes
Date Started
The date that the inspection or assessment started
DateEA7P15 InspectionNoFeature.Attribute.Name.DateStarted27-04-2021
View history
Request changes
Default AP Team
The default Asset Performance team for inspections. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W)
AutoP15 InspectionNoFeature.Attribute.Name.DefaultAPTeam16-01-2024
View history
Request changes
Default AP Team Email Address
The email address of the default Asset Performance team. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 500
AutoP15 InspectionNoFeature.Attribute.Name.DefaultAPTeamEmailAddress16-01-2024
View history
Request changes
Default Field Team
The default Field team carrying our work on this Asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W)
AutoP15 InspectionNoFeature.Attribute.Name.DefaultFieldTeam16-01-2024
View history
Request changes
Default Field Team Email Address
The email address of the default Field team. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 500
AutoP15 InspectionNoFeature.Attribute.Name.DefaultFieldTeamEmailAddress16-01-2024
View history
Request changes
Default Geo Type
The default geographic feature type of the asset in AIMS OM
Picklist
Point
EA2P09 OperationsYesFeature.Attribute.Name.DefaultGeoType02-12-2022
View history
Request changes
Delivery Date
The date that the asset was delivered
DateEA4P09 OperationsNoFeature.Attribute.Name.DeliveryDate27-04-2021
View history
Request changes
Description
A brief description of the asset and/or its construction type
Text
Max Length: 400
EA2P09 OperationsNoFeature.Attribute.Name.Description27-04-2021
View history
Request changes
Description / Instruction
The description or instructions for the culvert inspection
Text
Max Length: 99999
EA7P09 OperationsNoFeature.Attribute.Name.DescriptionInstruction27-04-2021
View history
Request changes
Design SOP
The Standard of Protection (1:n) that the asset was designed to provide
Number
Max: 9,999
Min: 0
Number of decimal places: 0
Units: 1:n years
EA7P15 InspectionYesFeature.Attribute.Name.DesignSOP27-04-2021
View history
Request changes
Design SOP Date
The date the Design Standard of Protection was appraised
DateEA7P15 InspectionYesFeature.Attribute.Name.DesignSOPDate27-04-2021
View history
Request changes
Design SOP DQF
The data quality flag for the Design Standard of Protection
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P15 InspectionYesFeature.Attribute.Name.DesignSOPDQF27-04-2021
View history
Request changes
Design SOP DQF Date
The date the Data Quality Flag for the Design Standard of Protection was assessed
DateEA7P15 InspectionYesFeature.Attribute.Name.DesignSOPDQFDate27-04-2021
View history
Request changes
EA Water Management Area
The Area the Asset is located in
Picklist
Cumbria and Lancashire Devon Cornwall and the Isles of Scilly East Anglia East Midlands Greater Manchester Merseyside and Cheshire Hertfordshire and North London Kent South London and East Sussex Lincolnshire and Northamptonshire North East Solent and South Downs Thames Wessex West Midlands Yorkshire
EA7P09 OperationsYesFeature.Attribute.Name.EAWaterManagementArea27-04-2021
View history
Request changes
Easting
The easting of the asset's geographic location (British National Grid)
Number
Max: 700,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA7P15 InspectionYesFeature.Attribute.Name.Easting27-04-2021
View history
Request changes
End of Life Liabilities
How much an asset will eventually cost to decommission (e.g. how much it will cost to demolish or make safe, how much we would need to pay to get out of a signed maintenance agreement, etc)
Number
Max: 9,999,999,999.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P09 OperationsNoFeature.Attribute.Name.EndofLifeLiabilities27-04-2021
View history
Request changes
Exclude from External Publication
Should the asset be excluded from being shared publicly? E.g. if the values recorded are sensitive information, personal information or contact details.
BooleanEA7P06 SecurityYesFeature.Attribute.Name.ExcludefromExternalPublication17-07-2023
View history
Request changes
Factored Availability
The Factored Availability is defined as the Asset Availability multiplied by the Asset Element Class value of each active Asset Element on the asset raised to the power of the number of active assets on the asset. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.FactoredAvailability27-04-2021
View history
Request changes
FCRM Strategically Important Asset (SIA)
Is the Asset an FCRM Strategically Important Asset?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.FCRMStrategicallyImportantAssetSIA27-04-2021
View history
Request changes
FCRM Strategically Important Asset (SIA) Band
The banding of the SIA. Mandatory where FCRM Strategically Important Asset (SIA) = True
Picklist
A B C
EA7P09 OperationsNoFeature.Attribute.Name.FCRMStrategicallyImportantAssetSIABand27-04-2021
View history
Request changes
Final Asset Condition
The final recorded condition of the asset after inspection and any manual override.
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.FinalAssetCondition27-04-2021
View history
Request changes
Fish Obstruction ID
Obstruction ID reference from River Obstacles Dataset
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.FishObstructionID26-02-2024
View history
Request changes
Frequency for Next Inspection
Internal culvert inspection frequency
Number
Max: 1,200
Min: 0
Number of decimal places: 0
Units: months
EA7P09 OperationsNoFeature.Attribute.Name.FrequencyforNextInspection27-04-2021
View history
Request changes
FRMS
The name and code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.FRMS16-01-2024
View history
Request changes
FRMS Code
The code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 10
AutoP09 OperationsNoFeature.Attribute.Name.FRMSCode16-01-2024
View history
Request changes
FRMS Consequence
A measure of the vulnerability of the FRMS to failures of assets, considering the time lag between failure and flooding occuring, and critical infrastructure that may be affected as well as houses. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
HIGHC01 HIGHC02 HIGHC03 HIGHC04 HIGHC08 MEDC06 MEDC07 MEDC12 LOWC05 LOWC09 LOWC10 LOWC11
AutoP09 OperationsNoFeature.Attribute.Name.FRMSConsequence16-01-2024
View history
Request changes
FRMS Name
The name of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 37
AutoP09 OperationsNoFeature.Attribute.Name.FRMSName16-01-2024
View history
Request changes
FWM Act Designated
Is the asset designated under the Floods and Water Management Act 2020?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.FWMActDesignated27-04-2021
View history
Request changes
House Equivalent
A measure of the number of residential properties at increased risk of flooding if the asset is below target condition, which is calculated by default as 10% of the '100 year houses at risk' value from the FRMS. Only applicable when MEICA Elements Present = True
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.HouseEquivalent27-04-2021
View history
Request changes
Include in Floodmap
The Floodmap inclusion assessment.
Picklist
Considered and Accepted Considered and Rejected Not Yet Considered
EA7P09 OperationsNoFeature.Attribute.Name.IncludeInFloodmap27-04-2021
View history
Request changes
Insp Freq EIC Inspection
The required frequency of inspection to be conducted by the Engineering Inspection Coordinator. Only applicable when MEICA Elements Present = True
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: months
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqEICInspection26-02-2024
View history
Request changes
Insp Freq PUWER
The required frequency of Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: months
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqPUWER17-10-2023
View history
Request changes
Insp Freq Visual
The required frequency of visual inspection.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: months
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqVisual17-10-2023
View history
Request changes
Inspection Comments
Any specific comments related to the inspection or assessment that are worth noting
Text
Max Length: 600
EA7P15 InspectionYesFeature.Attribute.Name.InspectionComments27-04-2021
View history
Request changes
Inspection ID
The identification number for the individual instance of inspection.
Text
Max Length: 50
EA7P15 InspectionYesFeature.Attribute.Name.InspectionID27-04-2021
View history
Request changes
Inspection Method
What method is used to inspect the culvert?
Picklist
CCTV Person Entry
EA7P15 InspectionNoFeature.Attribute.Name.InspectionMethod27-04-2021
View history
Request changes
Inspection Type
The type of inspection to be conducted.
Picklist
Ad Hoc Culvert Internal Inspection Ad Hoc EIC Inspection Ad Hoc PSRA Land Water Ad Hoc PSRA Tree Ad Hoc Visual Asset Inspection Culvert Internal Inspection EIC Inspection MEICA site safety and operation inspection MRM Inspection PSRA Assessment PSRA Land Water PSRA Tree PSRA Tree Assessment PUWER Inspection Section 10 Reservoir Inspection Section 12 Reservoir Inspection Site Inspection - 6 month Transition Inspection Visual Asset Inspection
EA7P15 InspectionNoFeature.Attribute.Name.InspectionType27-04-2021
View history
Request changes
Inspection Unit (EIC)
The inspection unit of inspection to be conducted by the Engineering Inspection Coordinator. Populated via a picklist in AIMS OM. Only applicable when MEICA Elements Present = True
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitEIC26-02-2024
View history
Request changes
Inspection Unit (PUWER)
The inspecton unit reference number for Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitPUWER27-04-2021
View history
Request changes
Inspection Unit (Visual)
The inspecton unit reference for visual inspection. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitVisual27-04-2021
View history
Request changes
Inspector
The name of the Asset Inspector who is conductng the inspection. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P15 InspectionNoFeature.Attribute.Name.InspectionID27-04-2021
View history
Request changes
Interested Party
The details for any parties that have a particular interest in the asset.
Set of linked fields for each interested party:
Party Type (Individial, Organisation), Party, Preferred Contact Method (Email, In Person, Mail, Phone, Text), Address, Post Code, Phone Number 1, Phone Number 2, Fax Number, E-Mail, Consent Obtained, Landowner?
LinkEA7P02 ComplianceNoFeature.Attribute.Name.InterestedParty27-04-2021
View history
Request changes
Internal Drainage Board (IDB)
The Internal Drainage Board within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 100
AutoP02 ComplianceNoFeature.Attribute.Name.InternalDrainageBoardIDB27-04-2021
View history
Request changes
Key / Access Card Details
Details of the key or access card that is required to gain entry. Applicable where Key / Access Card Required = Yes
Text
Max Length: 100
EA7P02 ComplianceNoFeature.Attribute.Name.KeyAccessCardDetails27-04-2021
View history
Request changes
Key / Access Card Required?
Is a key or access card required to gain entry?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.KeyAccessCardRequired27-04-2021
View history
Request changes
KPI881 - Inspections - FCRM 2.3
Is the asset included in the KPI881 (Inspections) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI881Inspections27-04-2021
View history
Request changes
KPI885 - Public Safety Sites
Is the asset included in the KPI885 (Public safety sites) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI885PublicSafetySites27-04-2021
View history
Request changes
KPI962 - Maintaining above required condition - FCRM 1.3
Is the asset included in the KPI962 (Maintaining above required condition) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI962Maintainingaboverequiredcondition27-04-2021
View history
Request changes
KPI965 - Conveyance - FCRM 2.8
Is the asset included in the KPI965 (Conveyance) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI965Conveyance27-04-2021
View history
Request changes
KPI965 - Households at risk - FCRM 2.5
Is the asset included in the KPI965 (Households at risk) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI965Householdsatrisk27-04-2021
View history
Request changes
KPI970 - Performance vs Engineering deadline - FCRM 2.6
Is the asset included in the KPI970 (Performance vs engineering deadline) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI970PerformancevsEngineeringdeadline27-04-2021
View history
Request changes
Landowner Contact Required
Is contact with the landowner needed in order to gain entry?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.LandownerContactRequired27-04-2021
View history
Request changes
Last Culvert Internal Inspection
The AIMS OM reference (GUID) of the last recorded internal inspection of the culvert
Text
Max Length: 32
EA7P09 OperationsNoFeature.Attribute.Name.LastCulvertInternalInspection27-04-2021
View history
Request changes
Last Culvert Internal Inspection Comments
Comments on the last culvert internal inspection
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.LastCulvertInternalInspectionComments27-04-2021
View history
Request changes
Last Routine Inspection
The AIMS OM reference (GUID) of the last recorded routine inspection.
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.LastRoutineInspection27-04-2021
View history
Request changes
Last Visual Inspection
The AIMS OM reference (GUID) of the last recorded visual inspection.
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.LastVisualInspection27-04-2021
View history
Request changes
Last Visual Inspection Comments
Comments on the last visual inspection
Text
Max Length: 500
EA7P15 InspectionNoFeature.Attribute.Name.LastVisualInspectionComments27-04-2021
View history
Request changes
Latitude
The latitude of the asset's geographic location
Number
Max: 56.000000
Min: 49.000000
Number of decimal places: 6
Units: degrees
AutoP09 OperationsYesFeature.Attribute.Name.Latitude27-04-2021
View history
Request changes
Legacy CMMS ID
The element's ID from the legacy CMMS system. Applicable where asset has MEICA maintained elements.
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.LegacyCMMSID27-04-2021
View history
Request changes
Legacy MEICA Site / Asset Name
The element's legacy MEICA site or asset name. Applicable where asset has MEICA maintained elements.
Text
Max Length: 100
AutoP09 OperationsNoFeature.Attribute.Name.LegacyMEICASiteAssetName27-04-2021
View history
Request changes
Likelihood of Failure
What is the likelihood of failure of the asset?
Picklist
Failure imminent - 50% chance within 12 months Likely - 20% chance within 24 months Possible - 5% chance within 24 months Unlikely - 0.5% chance within 60 months
EA7P09 OperationsNoFeature.Attribute.Name.LikelihoodOfFailure27-04-2021
View history
Request changes
LineString Type
The type of the Control LineString
Picklist
Axial Crest Invert
EA2P08 ImpactsNoFeature.Attribute.Name.LineStringType27-04-2021
View history
Request changes
Local Authority
The local authority within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.LocalAuthority27-04-2021
View history
Request changes
Location
The location of the asset, for example: nearest town and/or distance downstream of named bridge
Text
Max Length: 400
EA2P09 OperationsNoFeature.Attribute.Name.Location27-04-2021
View history
Request changes
Longitude
The longitude of the asset's geographic location
Number
Max: 2.000000
Min: -7.000000
Number of decimal places: 6
Units: degrees
AutoP09 OperationsYesFeature.Attribute.Name.Longitude27-04-2021
View history
Request changes
Maintainer
The organisation or private individual recognised to be the maintainer of the asset. The maintainer is the organisation or person who manages, and provides for, the maintenance of the asset but they may instruct others to carry out works on their behalf. This information is not mandatory if the asset is not maintained. This is a mandatory field where Not Maintained = No
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsNoFeature.Attribute.Name.Maintainer05-09-2022
View history
Request changes
Maintainer Date Change
The date the Maintainer was changed.
DateEA6P09 OperationsYesFeature.Attribute.Name.MaintainerDateChange18-12-2023
View history
Request changes
Maintainer Function
Department within Maintaining Organisation
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA7P09 OperationsNoFeature.Attribute.Name.MaintainerFunction27-04-2021
View history
Request changes
Maintainer Reason for Change
The reason the Maintainer was changed.
Picklist
Abandonment Handover Incorrectly Recorded New Asset Record
EA6P09 OperationsYesFeature.Attribute.Name.MaintainerReasonForChange18-12-2023
View history
Request changes
Manufacturer
The manufacturer of the asset
Text
Max Length: 50
EA4P09 OperationsNoFeature.Attribute.Name.Manufacturer27-04-2021
View history
Request changes
Max Frequency for Next Inspection
The maximum frequency for the next culvert internal inspection
Number
Max: 99,999
Min: 0
Number of decimal places: 0
Units: months
EA7P09 OperationsNoFeature.Attribute.Name.MaxFrequencyforNextInspection27-04-2021
View history
Request changes
MEICA Condition Target
A target value for the Factored Availability of an asset, based upon the FRMS Consequence. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.MEICAConditionTarget27-04-2021
View history
Request changes
MEICA Element Failed
Applicable where MEICA Elements Present = True. Have any of the MEICA elements failed?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.MEICAElementFailed27-04-2021
View history
Request changes
MEICA Elements Present
Are MEICA elements present on the asset? Attribute automatically populated based on whether the asset has any elements which are set as MEICA Maintained Elements.
BooleanAutoP09 OperationsYesFeature.Attribute.Name.MEICAElementsPresent05-09-2022
View history
Request changes
MEICA Supra-Area
The MEICA Supra-Area covering the asset
Picklist
Anglian KSL & HNL Midlands North East North West South West SSD & WT
EA7P09 OperationsNoFeature.Attribute.Name.MEICASupraArea27-04-2021
View history
Request changes
MEICA Team Email Address
The email address of the MEICA team covering the asset
Text
Max Length: 80
EA7P09 OperationsNoFeature.Attribute.Name.MEICATeamEmailAddress27-04-2021
View history
Request changes
MP Constituency
The parliamentary constituency within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.MPConstituency27-04-2021
View history
Request changes
Next Inspection Date
The date of the next internal culvert inspection (CCTV or man entry)
DateEA7P09 OperationsNoFeature.Attribute.Name.NextInspectionDate27-04-2021
View history
Request changes
NGR
National Grid Reference. Will be populated by a spatial lookup
Text
Max Length: 12
AutoP09 OperationsNoFeature.Attribute.Name.NGR27-04-2021
View history
Request changes
Northing
The northing of the asset's geographic location (British National Grid)
Number
Max: 700,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA7P09 OperationsYesFeature.Attribute.Name.Northing27-04-2021
View history
Request changes
Number of Fish Passes at Asset
The number of Fish Passes at the asset
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NumberofFishPassesatAsset18-04-2024
View history
Request changes
Operational Area
The asset's Operational Area. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
NE - CMBLNC - FCRM OPS North NE - CMBLNC - FCRM OPS South NE - DBNTLS - FCRM OPS North NE - DBNTLS - FCRM OPS South NE - LCNNTH - FCRM OPS Lincs NE - LCNNTH - FCRM OPS W&N NE - NHUDUT - FCRM OPS NE - YORKS - FCRM OPS N&EY NE - YORKS - FCRM OPS W&SY SE - CAMBED - FCRM OPS SE - ESNFSF - FCRM OPS Essex SE - ESNFSF - FCRM OPS N&S SE - HTSNLN - FCRM OPS East SE - HTSNLN - FCRM OPS West SE - KNTSLN - FCRM OPS East Kent SE - KNTSLN - FCRM OPS SLN & WK SE - KNTSLN - FCRM TTD SE - SLTSDN - FCRM OPS East SE - SLTSDN - FCRM OPS West SE - WTHMS - FCRM OPS Lower SE - WTHMS - FCRM OPS Upper W - DVNCWL - FCRM OPS Devon & Cornwall - FCRM Ops W - GMMYCH - FCRM OPS W - SHHRWG - FCRM OPS W - STWKWM - FCRM OPS W - WESSEX - FCRM OPS E W - WESSEX - FCRM OPS W
AutoP09 OperationsNoFeature.Attribute.Name.OperationalArea16-01-2024
View history
Request changes
Operator
The organisation or private individual recognised to be the operator of the asset
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsYesFeature.Attribute.Name.Operator27-04-2021

Picklist edited 05-09-2022


View history
Request changes
Operator Date Change
The date the Operator was changed.
DateEA6P09 OperationsYesFeature.Attribute.Name.OperatorDateChange18-12-2023
View history
Request changes
Operator Function
Department of Operator
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA7P09 OperationsNoFeature.Attribute.Name.OperatorFunction27-04-2021
View history
Request changes
Operator Reason for Change
The reason the Operator was changed.
Picklist
Abandonment Handover Incorrectly Recorded New Asset Record
EA6P09 OperationsYesFeature.Attribute.Name.OperatorReasonForChange18-12-2023
View history
Request changes
Outfall Invert Level
The invert level of the outfall
Number
Max: 300.000
Min: -300.000
Number of decimal places: 3
Units: mAOD
EA3P09 OperationsNoFeature.Attribute.Name.OutfallInvertLevel27-04-2021
View history
Request changes
Outfall Type
The type of Outfall
Picklist
Flapped Unflapped
EA3P09 OperationsYesFeature.Attribute.Name.OutfallType27-04-2021
View history
Request changes
Overridden Equivalent
A manually entered value for House Equivalent. Only applicable when MEICA Elements Present = True and Override = True
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.OverriddenEquivalent27-04-2021
View history
Request changes
Overridden Equivalent Asset Availability
A manually entered value for Asset Factored Availability, to be used instead of the default calculation. Only applicable when MEICA Elements Present = True and Asset Availability Override = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.OverriddenEquivalentAssetAvailability27-04-2021
View history
Request changes
Override
An indication of the use of a manually entered value for House Equivalent, instead of the value calculated by default from the FRMS. Only applicable when MEICA Elements Present = True
BooleanEA7P09 OperationsYesFeature.Attribute.Name.Override27-04-2021
View history
Request changes
Override Condition
New condition of the asset after the override. Only applies when Override Calculated Condition = True
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.OverrideCondition27-04-2021
View history
Request changes
Owner
The organisation or private individual known to be the owner of the asset
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsYesFeature.Attribute.Name.Owner27-04-2021

Picklist edited 05-09-2022


View history
Request changes
Owner Date Change
The date the Owner was changed.
DateEA6P09 OperationsYesFeature.Attribute.Name.OwnerDateChange18-12-2023
View history
Request changes
Owner Function
The Department within the Organisation with Owner responsibility
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.OwnerFunction27-04-2021
View history
Request changes
Owner Reason for Change
The reason the Owner was changed.
Picklist
Incorrectly Recorded New Asset Record Sale
EA6P09 OperationsYesFeature.Attribute.Name.OwnerReasonForChange18-12-2023
View history
Request changes
Parish Council
The parish council within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 200
AutoP09 OperationsNoFeature.Attribute.Name.ParishCouncil27-04-2021
View history
Request changes
Permit to Work Required
Is a permit to work required to work on the asset?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.PermitToWorkRequired27-04-2021
View history
Request changes
Photo
A photograph or image related to the asset.
PhotoEA4P09 OperationsNoFeature.Attribute.Name.Photo17-07-2023
View history
Request changes
Pipe Length
The approximate length of the outfall pipe
Number
Max: 999.99
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P09 OperationsNoFeature.Attribute.Name.PipeLength27-04-2021
View history
Request changes
Post Code
The postcode within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 15
AutoP09 OperationsNoFeature.Attribute.Name.PostCode27-04-2021
View history
Request changes
Previous Condition
The previous condition of the Asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.PreviousCondition27-04-2021
View history
Request changes
Primary Purpose
The main purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P09 OperationsYesFeature.Attribute.Name.PrimaryPurpose27-04-2021

Picklist edited 14-06-2021


View history
Request changes
Protection Type
The type of protection the asset gives. Mandatory when any Purpose = Flood Risk Management
Picklist
Coastal Fluvial Fluvial/Tidal Surface Water Tidal
EA3P09 OperationsNoFeature.Attribute.Name.ProtectionType27-04-2021
View history
Request changes
PSRA System ID
The ID (GUID) of the PSRA System Asset that the Asset is related to
Text
Max Length: 32
EA6P03 Risk managementNoFeature.Attribute.Name.PSRASystemID27-04-2021
View history
Request changes
PUWER?
Do any of the elements of this asset require PUWER inspections? Only applicable when MEICA Elements Present = True
BooleanEA7P03 Risk managementYesFeature.Attribute.Name.PUWER27-04-2021
View history
Request changes
RAAC Details
Details of Reinforced Autoclaved Aerated Concrete (RAAC) at the asset.
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.RAACDetails18-04-2024
View history
Request changes
RAAC Survey Date
The date a survey was undertaken to check for the presence of Reinforced Autoclaved Aerated Concrete (RAAC) at the asset. Mandatory when a survey has been undertaken.
DateEA7P09 OperationsNoFeature.Attribute.Name.RAACSurveyDate18-04-2024
View history
Request changes
Raw Condition
The Granular Weighted Asset Condition
Number
Max: 99,999.00
Min: 0.00
Number of decimal places: 2
EA7P15 InspectionNoFeature.Attribute.Name.RawCondition27-04-2021
View history
Request changes
Reason for Asset Discontinued
The reason the asset has been marked as Discontinued. Only applicable when Asset Status = Discontinued.
Picklist
Asset replaced Demolition Other Withholding repair following failure
EA7P09 OperationsNoFeature.Attribute.Name.ReasonForAssetDiscontinued26-02-2024
View history
Request changes
Reason for Selection
Applicable where Candidate for Discontinuation = True. The reason why the asset has been selected for Discontinuation
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.ReasonforSelection27-04-2021
View history
Request changes
Regional Flood & Coastal Committee (RFCC)
The Regional Flood & Coastal Committee within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.RegionalFloodCoastalCommitteeRFCC27-04-2021
View history
Request changes
Reinforced Autoclaved Aerated Concrete (RAAC)?
Is Reinforced Autoclaved Aerated Concrete (RAAC) known to be present in the asset?
Picklist
RAAC presence unconfirmed, further investigation required Low risk of RAAC, desktop screening RAAC presence confirmed by survey, High risk to personnel and high risk of non operation of assets RAAC presence confirmed by survey, High risk to personnel and low risk of non operation of assets RAAC presence confirmed by survey, Low risk to personnel and high risk of non operation of assets RAAC presence confirmed by survey, Low risk to personnel and low risk of non operation of assets No RAAC presence confirmed by survey No RAAC presence confirmed by visual inspection or constructed post 1995
EA7P09 OperationsNoFeature.Attribute.Name.ReinforcedAutoclavedAeratedConcreteRAAC18-04-2024
View history
Request changes
Related Event Reference
The reference of the event related to the inspection. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.RelatedEventReference27-04-2021
View history
Request changes
Replacement Cost
How much would the Asset cost to completely replace?
Number
Max: 9,999,999,999.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA6P08 ImpactsNoFeature.Attribute.Name.ReplacementCost27-04-2021
View history
Request changes
Replacement Cost Assessment Date
The date the replacement cost of the asset was assessed
DateEA6P08 ImpactsNoFeature.Attribute.Name.ReplacementCostDate27-04-2021
View history
Request changes
Requirements
Are there any further requirements of the asset? Can select multiple options
Picklist
Abstraction FCRM Critical Hydropower Operational Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.Requirements27-04-2021
View history
Request changes
Requirements Notes
Notes about the further requirements
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.RequirementsNotes27-04-2021
View history
Request changes
Residual Life
The estimated residual life of the asset
Number
Max: 100
Min: 0
Number of decimal places: 0
Units: years
EA6P09 OperationsNoFeature.Attribute.Name.ResidualLife27-04-2021
View history
Request changes
Residual Life Date
The date the residual life was assessed
DateEA6P09 OperationsNoFeature.Attribute.Name.ResidualLifeDate27-04-2021
View history
Request changes
Responsibility Split - Organisation
An organisation that has shared responsibility for the asset. Multiple options can be made
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitOrganisation27-04-2021

Picklist edited 05-09-2022


View history
Request changes
Responsibility Split - Organisation Function
The department within the organisation with shared responsibility
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitOrganisationFunction27-04-2021
View history
Request changes
Responsibility Split - Percentage Split
The percentage of the organisation's responsibility for the asset. All values must total 100%
Number
Max: 99
Min: 0
Number of decimal places: 0
Units: %
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitPercentageSplit27-04-2021
View history
Request changes
Responsible Officer
Who is the Responsible Officer of the Asset? This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibleOfficer27-04-2021
View history
Request changes
Schedule Date
The scheduled date of the inspection or assessment.
DateEA6P15 InspectionYesFeature.Attribute.Name.ScheduleDate27-04-2021
View history
Request changes
Serial Number
The serial number of the asset
Text
Max Length: 50
EA4P09 OperationsNoFeature.Attribute.Name.SerialNumber27-04-2021
View history
Request changes
SIA Contingency Document Link
The link to the SIA contingency document. Applicable only where FCRM Strategically Important Asset (SIA) = True and SIA Contingency Plans in Place = True
LinkEA7P08 ImpactsNoFeature.Attribute.Name.SIAContingencyDocumentLink27-04-2021
View history
Request changes
SIA Contingency Plans in Place
Are SIA contingency plans in place? Applicable only where FCRM Strategically Important Asset (SIA) = True
BooleanEA7P08 ImpactsYesFeature.Attribute.Name.SIAContingencyPlansinDocument27-04-2021
View history
Request changes
SIA Reason for Submission
The reason for the SIA submission. Mandatory where FCRM Strategically Important Asset (SIA) = True
Text
Max Length: 2000
EA7P08 ImpactsNoFeature.Attribute.Name.SIAReasonforSubmission27-04-2021
View history
Request changes
Site Liaison Officer
Who is the Site Liaison Officer of the Asset? This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.SiteLiaisonOfficer27-04-2021
View history
Request changes
Site Priority
The priority of the Asset. Only applicable when MEICA Elements Present = True
Picklist
High Medium Low
EA6P09 OperationsNoFeature.Attribute.Name.SitePriority27-04-2021
View history
Request changes
Spatial Quality
The data quality flag for the spatial position of the asset
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P09 OperationsNoFeature.Attribute.Name.SpatialQuality27-04-2021
View history
Request changes
Supplier
The supplier of the asset
Text
Max Length: 50
EA4P09 OperationsNoFeature.Attribute.Name.Supplier27-04-2021
View history
Request changes
Target Condition
The target condition of the Asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P09 OperationsNoFeature.Attribute.Name.TargetCondition27-04-2021
View history
Request changes
Unknown or Not Maintained
Is the asset not maintained?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.UnknownorNotMaintained27-04-2021
View history
Request changes
Warranty
What is the span of the warranty of the asset?
Number
Max: 3,000
Min: 0
Number of decimal places: 0
Units: months
EA4P09 OperationsNoFeature.Attribute.Name.Warranty27-04-2021
View history
Request changes
Warranty Expiry Date
When will the warranty of the asset expire?
DateEA4P09 OperationsNoFeature.Attribute.Name.WarrantyExpiryDate27-04-2021
View history
Request changes
Water Course Details Set By User
Were the Watercourse details set by the user?
BooleanEA6P15 InspectionYesFeature.Attribute.Name.WaterCourseDetailsSetByUser27-04-2021
View history
Request changes
Water Course GML ID
The GML ID of the Watercourse where the Asset is located
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.WaterCourseGMLID27-04-2021
View history
Request changes
Water Course Valid From
The date that the watercourse was recorded, established, constructed or classified as main river
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.WaterCourseValidFrom27-04-2021
View history
Request changes
Watercourse Alt Name
An alternative name of the Watercourse where the Asset is located
Text
Max Length: 200
EA2P09 OperationsNoFeature.Attribute.Name.WatercourseAltName27-04-2021
View history
Request changes
Watercourse Name
The name of the Watercourse where the Asset is located
Text
Max Length: 200
EA2P09 OperationsNoFeature.Attribute.Name.WatercourseName27-04-2021
View history
Request changes
WFD Waterbody ID
The ID of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.WFDWaterbodyID27-04-2021
View history
Request changes
WFD Waterbody Name
The name of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.WFDWaterbodyName27-04-2021
View history
Request changes
What would be at risk due to Culvert Failure
The level of risk should the culvert become blocked
Picklist
Minor Infrastructure / SSSI Property / Critical Infrastructure Rural / Unpopulated Land
EA7P09 OperationsNoFeature.Attribute.Name.WhatwouldbeatriskduetoCulvertFailure27-04-2021
View history
Request changes
Work Type
The type of work that is required.
Picklist
Ad Hoc Inspection Capital Defence Capital Recondition Capital Maintenance Post Incident Inspection Post Remedial Work Inspection Scheduled Inspection Scheduled Maintenance - Frequent Scheduled Maintenance - Intermittent Unscheduled Maintenance - Reactive
EA7P15 InspectionNoFeature.Attribute.Name.WorkType27-04-2021
View history
Request changes
Year Last Refurbished
The year the asset was last refurbished
Number
Max: 2,999
Min: 1,900
Number of decimal places: 0
EA6P09 OperationsNoFeature.Attribute.Name.YearLastRefurbished27-04-2021
View history
Request changes
Year of Manufacture
The year that the asset was manufactured
Number
Max: 2,099
Min: 1,800
Number of decimal places: 0
EA4P09 OperationsNoFeature.Attribute.Name.YearOfManufacture27-04-2021
View history
Request changes
Request new Attribute
Back to top