Viewing latest data (updated 26/02/2024 11:01)

Stilling Well

Structure

A chamber that is connected to a water body by one or more inlets. The water level in the stilling well will rise and fall with the level in the water body, but will not be subject to the turbulence that may be present in the water body, allowing for more accurate level measurement.

Stilling Well (diagram).
Stilling Well (diagram).
An example of a Stilling Well.
An example of a Stilling Well.

Stilling Wells are displayed in the Environment Agency's AIMS OM system as a point in the centre of the structure.

Environment Agency symbology for Stilling Well.
Environment Agency symbology for Stilling Well.

Elements

An Element Type is a component part of an Asset Type. Each Asset Type (except Asset Complex assets) will comprise of a prescribed set of Element Types.  Some Element Types are essential and must be present to define an asset of that Asset Type.  Other Element Types are optional, to be included when needed to define a particular Asset Type instance. An individual asset may have more than one instance of each Element Type.

This table lists the Element Types applicable to this Asset Type.

Element TypeDescriptionElement CodeEssentialUniclass 2015Updates
Cable and Pipe ManagementRouting and protection of a range of different cables and pipes belonging to an asset. Examples could be above or below ground ducting, trunking, conduit. This is not the cable or pipes themselves.CMGNoEn_90_90_8011-04-2023
View history
Request changes
ChamberPart of a structure that holds water.CHRNoPr_40_70_96_3011-04-2023
View history
Request changes
Cover or HatchMeans to allow or prevent access to a structure. Doors to buildings are covered separately.CDRNoPr_30_59_3611-04-2023
View history
Request changes
Drainage SystemA system of pipes, drains and fixtures which collect, store, treat or remove foul water and surface water from a building, facility or outdoor space.DSYNoEn_50_3011-04-2023
View history
Request changes
Excavated GroundThe ground that is excavated during the construction of the asset. Note that this Element is not recorded in AIMS OM.EXGNoSL_90_30_2511-04-2023
View history
Request changes
Expansion JointA separation between different sections of a structure (usually concrete) to allow for relative movement between the sections without damaging the structure. The gap may be filled with an elastic material like silicone to provide a watertight structure.EXJNoPr_35_90_2711-04-2023
View history
Request changes
FasteningsDevices that secure items together such as brackets, hinges or locking mechanisms.FASNoPr_20_2911-04-2023
View history
Request changes
FixingsDevices to attach a measure or other device to a post or structure.FIXNoPr_20_2911-04-2023
View history
Request changes
FloorThe bottom horizontal surface of each storey inside a building.FLRNoEF_30_2011-04-2023
View history
Request changes
FoundationThe lowest load-bearing part of a building, typically below ground level.FDNNoEF_20_05_3011-04-2023
View history
Request changes
FrameA rigid structure that surrounds or supports something.FRMNoSs_20_1011-04-2023
View history
Request changes
InletThe point or means where water enters an asset.INLNoSs_55_70_38_4011-04-2023
View history
Request changes
Internal FeaturesOther integral internal features of buildings not covered by other elements of buildings, e.g. internal doors, integrated storage, sanitaryware.IFSNoPr_4011-04-2023
View history
Request changes
LadderA ladder that is fixed in place or designed for a particular location to enable access to and egress from part of an asset or group of assets. Includes step irons.LADNoPr_25_30_85_0211-04-2023
View history
Request changes
Lifting Chains and SprocketsChains and associated sprockets used for moving mechanical assets within a defined range of motion.LCSNoPr_65_80_47_4711-04-2023
View history
Request changes
Lifting Ropes and DrumsSteel wire ropes and associated rope drums used for moving mechanical assets within a defined range of motion.LRDNoPr_65_80_47_4811-04-2023
View history
Request changes
Measurement ScaleA marked scale to allow for visual reading of a measured value.MSRNoPr_80_51_70_5111-04-2023
View history
Request changes
OutletThe point or means where water exits an asset.OLTNoSL_50_25_5911-04-2023
View history
Request changes
Padlock or LockA mechanism for securing an opening.PADNoPr_30_36_08_6211-04-2023
View history
Request changes
PipePart of a structure that allows water to flow into or out of an asset.PIPNoPr_65_52_6311-04-2023
View history
Request changes
Pipe ValveA device which controls the flow of liquid through a pipe.PVLNoPr_65_5411-04-2023
View history
Request changes
Pump Out PointA place or facility to pump out excess water or effluent from boats.POPNoSL_50_30_6811-04-2023
View history
Request changes
SealsFlexible yet durable pieces of material (usually rubber or neoprene) which fill a gap between two components, creating a watertight seal.SELNoPr_30_31_7611-04-2023
View history
Request changes
Struts and BracingAdditional members which cross between the main members of a frame to provide additional support or strength to a structure.SBGNoPr_20_85_8611-04-2023
View history
Request changes
SubstructureThe parts of a structure or building that transfer the load of the structure to the ground, but excluding the foundations. For example a basement excavation and basement walls.SSTNoSs_20_0511-04-2023
View history
Request changes
Treads and RisersThe alternating horizontal (treads) and vertical (risers) elements that make up a set of steps. The Treads and Risers element should be used where steps provide access to a structure, instrument, building, etc.TRRNoPr_25_30_9021-08-2023
View history
Request changes
Request new Element

Attributes

An attribute is a particular piece of data that describes a property of an object. Each Asset Type is described by a different set of attributes, although there are some attributes that are common to many Asset Types.

The table below lists the attributes that are applicable to this Asset Type, along with the data profile requirements for each attribute and details of when and how each should be used and delivered.

AttributeFormat DetailsDeliveryPurposeMandatorygeoCOBie MappingUpdates
Alt. Asset Ref
The alternative asset reference used to cross reference to other data systems
Text
Max Length: 150
EA2P09 OperationsNoFeature.Attribute.Name.AltAssetRef27-04-2021
View history
Request changes
Alternative Purpose 1
An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P01 RegistrationNoFeature.Attribute.Name.AlternativePurpose127-04-2021

Picklist edited 14-06-2021


View history
Request changes
Alternative Purpose 2
An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P01 RegistrationNoFeature.Attribute.Name.AlternativePurpose227-04-2021

Picklist edited 14-06-2021


View history
Request changes
Annual Maintenance Costs (Current FY)
How much the asset costs this year to maintain to target condition
Number
Max: 1,000,000,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P10 MaintenanceNoFeature.Attribute.Name.AnnualMaintenanceCostsCurrentFY27-04-2021
View history
Request changes
Annual Maintenance Costs (Previous FY)
How much the asset cost last year to maintain to target condition
Number
Max: 1,000,000,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P10 MaintenanceNoFeature.Attribute.Name.AnnualMaintenanceCostsPreviousFY27-04-2021
View history
Request changes
Asbestos on Site
Is asbestos present on site?
Picklist
Asbestos on site, confirmed by survey. No asbestos on site, confirmed by survey or constructed post-2000. Presence of asbestos on site unknown.
EA3P03 Risk managementNoFeature.Attribute.Name.AsbestosOnSite12-05-2023
View history
Request changes
Asset Availability
The Asset Availability is the normalised product of the individual Asset Element availabilities within the Asset. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.AssetAvailability27-04-2021
View history
Request changes
Asset Below MEICA Condition Target
An indication that an asset has an Asset Availability below its MEICA condition target. Only applicable when MEICA Elements Present = True
BooleanEA7P15 InspectionYesFeature.Attribute.Name.AssetBelowMEICAConditionTarget27-04-2021
View history
Request changes
Asset Category
The Category of the asset
Picklist
Structure
EA2P01 RegistrationYesFeature.Attribute.Name.AssetCategory27-04-2021
View history
Request changes
Asset Complex 1
The ID (GUID) of the Asset Complex that this asset belongs to
Text
Max Length: 32
EA6P09 OperationsNoFeature.Attribute.Name.AssetComplex227-04-2021
View history
Request changes
Asset Complex 2
The ID (GUID) of the Secondary Asset Complex that the asset belongs to
Text
Max Length: 32
EA6P09 OperationsNoFeature.Attribute.Name.AssetComplex127-04-2021
View history
Request changes
Asset Complex Ref 1
The Asset Reference of the first Asset Complex which contains this asset
Text
Asset code xx + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetComplexRef127-04-2021
View history
Request changes
Asset Complex Ref 2
The Asset Reference of an additional Asset Complex which contains this asset
Text
Asset code xx + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetComplexRef227-04-2021
View history
Request changes
Asset End Date
The end date of the asset. This is only to be populated when asset is withdrawn or fully decommissioned
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetEndDate27-04-2021
View history
Request changes
Asset Factored Availability Override
An indication of the use of a manually entered value for Site Factored Availability, instead of the value calculated by default. Only applicable when MEICA Elements Present = True
BooleanEA7P09 OperationsYesFeature.Attribute.Name.AssetFactoredAvailabilityOverride27-04-2021
View history
Request changes
Asset Height
The total height of the structure, taken from ground level to its highest tangible point.
Number
Max: 200.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P01 RegistrationNoFeature.Attribute.Name.AssetHeight17-10-2023
View history
Request changes
Asset Height DQF
Data Quality Flag for the Asset Height attribute. Mandatory if an Asset Height value is present.
Picklist
DQF 1 : +/- 0.01m to 0.05m vertical accuracy (Typically on-site survey, including recent (post 2016) high resolution lidar with additional on-site ground validation) DQF 2a : +/- >0.05m to 0.10m vertical accuracy (Typically recent standard lidar survey - post 2016) DQF 2b : +/- >0.05m to 0.15m vertical accuracy (Typically lidar surveyed between 2004 and 2016, or photogrammetry) DQF 3 : +/- 0.15m to 0.75m vertical accuracy (Typically older (pre-2004) lidar or Photogrammetry) DQF 4 : +/- 0.75m or more vertical accuracy DQF 0 : unknown quality
EA3P01 RegistrationNoFeature.Attribute.Name.AssetHeightDQF26-02-2024
View history
Request changes
Asset Height DQF Date
The date the Asset Height DQF attribute was input. Mandatory if an Asset Height value is present.
DateEA3P01 RegistrationNoFeature.Attribute.Name.AssetHeightDQFDate26-02-2024
View history
Request changes
Asset ID
The Asset ID from the AIMS OM system, if known. For new assets that are not yet in AIMS OM, use "n/a".
Text
Max Length: 50
EA2P01 RegistrationYesFeature.Attribute.Name.AssetID14-06-2021
View history
Request changes
Asset Length
The length of the asset
Number
Max: 10,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P01 RegistrationNoFeature.Attribute.Name.AssetLength17-10-2023
View history
Request changes
Asset Length DQF
Data Quality Flag for the Asset Length attribute. Mandatory if an Asset Length value is present.
Picklist
DQF 1 : +/- 0.01m to 0.05m horizontal accuracy (Typically on-site survey) DQF 2 : +/- >0.05m to 0.25m horizontal accuracy (Typically Lidar Point Cloud or Photogrammetry) DQF 3 : +/- 0.25m to 0.50m horizontal accuracy (Typically Lidar raster DEMs or Photogrammetry) DQF 4 : +/- 0.50m to 1.0m horizontal accuracy (Typically captured from OS Mapping (e.g. MasterMap 2023)) DQF 5 : >1m horizontal accuracy (Typically Google Maps etc) DQF 0 : unknown quality
EA3P01 RegistrationNoFeature.Attribute.Name.AssetLengthDQF26-02-2024
View history
Request changes
Asset Length DQF Date
The date the Asset Length DQF attribute was input. Mandatory if an Asset Length value is present.
DateEA3P01 RegistrationNoFeature.Attribute.Name.AssetLengthDQFDate26-02-2024
View history
Request changes
Asset Name
The name of the asset if it has one
Text
Max Length: 150
EA2P01 RegistrationNoFeature.Attribute.Name.AssetName27-04-2021
View history
Request changes
Asset Ref
Unique asset reference code in scheme context assigned by scheme designer, e.g. SI0123
Text
Asset code SI + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetRef27-04-2021
View history
Request changes
Asset Risk Value
The Risk Value is calculated as the Risk Variance multiplied by the Estimated Avoided Damages Value. Only applicable when MEICA Elements Present = True
Number
Max: 99,999,999,999.00
Min: -99,999,999,999.00
Number of decimal places: 2
Units: pounds
EA7P15 InspectionNoFeature.Attribute.Name.AssetRiskValue27-04-2021
View history
Request changes
Asset Risk Variance
The Risk Variance is calculated using the following formula: ((Factored Availability / FRMS 'MEICA Condition Target') - 1) * Used House Equivalent. Only applicable when MEICA Elements Present = True
Number
Max: 999,999.00
Min: -999,999.00
Number of decimal places: 2
EA7P15 InspectionNoFeature.Attribute.Name.AssetRiskVariance27-04-2021
View history
Request changes
Asset Start Date
The date the asset becomes operational
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDate27-04-2021
View history
Request changes
Asset Start Date DQF
Data Quality Flag for the Asset Start Date attribute. Mandatory if an Asset Start Date value is present.
Picklist
DQF 1 : Start Date known based on documented evidence DQF 2 : Start Date estimated based on local knowledge (use 1st of month if day uncertain and June if month uncertain) DQF 3 : Start Date estimated by decade (use 1st Jan and middle year of decade e.g. 01/01/1965) DQF 0 : unknown quality (given to all existing AIMS OM Start Date)
EA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDateDQF26-02-2024
View history
Request changes
Asset Start Date DQF Date
The date the Asset Start Date DQF attribute was input. Mandatory if an Asset Start Date value is present.
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDateDQFDate26-02-2024
View history
Request changes
Asset Status
The status of the asset
Picklist
Active Discontinued New asset record for review Proposed asset Under construction
EA5P01 RegistrationYesFeature.Attribute.Name.AssetStatus27-04-2021
View history
Request changes
Asset Status Date
The date the status of the asset was assessed
DateEA5P01 RegistrationYesFeature.Attribute.Name.AssetStatusDate27-04-2021
View history
Request changes
Asset Type
The type of asset
Picklist
Stilling Well
EA2P01 RegistrationYesFeature.Attribute.Name.AssetType27-04-2021
View history
Request changes
Below Required Condition
Is the Asset below required condition?
BooleanEA7P15 InspectionYesFeature.Attribute.Name.BelowRequiredCondition27-04-2021
View history
Request changes
Bounding Box
A geospatial orthogonal bounding box cube containing the extent of the asset. This is to be expressed as a JSON lineString: [[lower left point easting,lower left point northing,lowest point elevation],[upper right point easting,upper right point northing,highest point elevation]] of the cube with geoCOBie Unit of 'bbox:EPSG7405:ETRS89:OSTN15:OSGM15'
Geometry
Units: bbox:EPSG7405:ETRS89:OSTN15:OSGM15
EA2P01 RegistrationNoFeature.Attribute.Name.BoundingBox05-09-2022
View history
Request changes
BRC Date
The date that the Asset was inspected to be below required condition. Only available if Below Required Condition = Yes
DateEA7P09 OperationsNoFeature.Attribute.Name.BRCDate04-05-2021
View history
Request changes
Calculated Asset Availability
The Calculated Asset Availability is the value of asset availability which is used in further calculations, e.g. to compare against target. It is either the default value of Asset Availability or the Overridden Equivalent if this is used. Only applicable when MEICA Elements Present = True
Number
Max: 1.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.CalculatedAssetAvailability27-04-2021
View history
Request changes
Calculated Condition
The overall calculated condition of the asset based on the actual condition of the elements and the element weightings
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionYesFeature.Attribute.Name.CalculatedCondition27-04-2021
View history
Request changes
Candidate for Discontinuation
Is the Asset a candidate for Discontinuation?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.CandidateforDiscontinuation27-04-2021
View history
Request changes
Change Reason
The reason the asset's status has been changed. Mandatory when Reason for Asset Discontinued = Other.
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.ChangeReason26-02-2024
View history
Request changes
Comments
Other comments about the asset
Text
Max Length: 2000
EA2P09 OperationsNoFeature.Attribute.Name.Comments27-04-2021
View history
Request changes
Completion Date
The date that the inspection or assessment was completed
DateEA7P15 InspectionNoFeature.Attribute.Name.CompletionDate27-04-2021
View history
Request changes
Condition Measure
The Condition Measure is the highest value in the ConditionThreshold table that is less than or equal to the Asset Availability. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.ConditionMeasure27-04-2021
View history
Request changes
Condition Target
A condition target against which to compare the Condition Measure. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.ConditionTarget27-04-2021
View history
Request changes
Confined Spaces
Is the site on the Confined Spaces Register?
BooleanEA3P09 OperationsYesFeature.Attribute.Name.ConfinedSpaces27-04-2021
View history
Request changes
Control LineString
A spatial lineString that locates the asset and further classified by the associated LineStringType attribute confirming its relative location to the asset. A lineString is a series of design or measured spatial triple points (easting, northing, elevation) each connected by a single non-crossing line, with single points at each end, that locate an asset. A lineString is expressed as a JSON array of type geoJSON lineString, e.g. [[x1,y1,z1],[x2,y2,z2],...] It is further classified by the associated LineStringType attribute confirming its relative location to the asset. Interim points should be spaced at a maximum of 2m for lines < 10m in length, or 10m otherwise. LineStrings may be open as in the case of linear asset types or closed (polygon) in the case of land or site assets. For linear assets, see the note in the description above about the maximum length. The default CRS is a 3D CRS to EPSG 7405 with confirmed type, European reference frame and UK OS transformation with geoCOBie Unit of 'LineString:EPSG7405:ETRS89:OSTN15:OSGM15'
Geometry
Units: LineString:EPSG7405:ETRS89:OSTN15:OSGM15
EA2P02 ComplianceNoFeature.Attribute.Name.ControlLineString05-09-2022
View history
Request changes
County
The county within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.County27-04-2021
View history
Request changes
Current Condition
The current condition of the asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P09 OperationsNoFeature.Attribute.Name.CurrentCondition27-04-2021
View history
Request changes
Date Started
The date that the inspection or assessment started
DateEA7P15 InspectionNoFeature.Attribute.Name.DateStarted27-04-2021
View history
Request changes
Default AP Team
The default Asset Performance team for inspections. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W)
AutoP15 InspectionNoFeature.Attribute.Name.DefaultAPTeam16-01-2024
View history
Request changes
Default AP Team Email Address
The email address of the default Asset Performance team. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 500
AutoP15 InspectionNoFeature.Attribute.Name.DefaultAPTeamEmailAddress16-01-2024
View history
Request changes
Default Field Team
The default Field team carrying our work on this Asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W)
AutoP15 InspectionNoFeature.Attribute.Name.DefaultFieldTeam16-01-2024
View history
Request changes
Default Field Team Email Address
The email address of the default Field team. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 500
AutoP15 InspectionNoFeature.Attribute.Name.DefaultFieldTeamEmailAddress16-01-2024
View history
Request changes
Default Geo Type
The default geographic feature type of the asset in AIMS OM
Picklist
Point
EA2P09 OperationsYesFeature.Attribute.Name.DefaultGeoType02-12-2022
View history
Request changes
Delivery Date
The date that the asset was delivered
DateEA4P09 OperationsNoFeature.Attribute.Name.DeliveryDate27-04-2021
View history
Request changes
Description
A brief description of the asset and/or its construction type
Text
Max Length: 400
EA2P09 OperationsNoFeature.Attribute.Name.Description27-04-2021
View history
Request changes
EA Water Management Area
The Area the Asset is located in
Picklist
Cumbria and Lancashire Devon Cornwall and the Isles of Scilly East Anglia East Midlands Greater Manchester Merseyside and Cheshire Hertfordshire and North London Kent South London and East Sussex Lincolnshire and Northamptonshire North East Solent and South Downs Thames Wessex West Midlands Yorkshire
EA7P09 OperationsYesFeature.Attribute.Name.EAWaterManagementArea27-04-2021
View history
Request changes
Easting
The easting of the asset's geographic location (British National Grid)
Number
Max: 700,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA7P15 InspectionYesFeature.Attribute.Name.Easting27-04-2021
View history
Request changes
End of Life Liabilities
How much an asset will eventually cost to decommission (e.g. how much it will cost to demolish or make safe, how much we would need to pay to get out of a signed maintenance agreement, etc)
Number
Max: 9,999,999,999.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P09 OperationsNoFeature.Attribute.Name.EndofLifeLiabilities27-04-2021
View history
Request changes
Exclude from External Publication
Should the asset be excluded from being shared publicly? E.g. if the values recorded are sensitive information, personal information or contact details.
BooleanEA7P06 SecurityYesFeature.Attribute.Name.ExcludefromExternalPublication17-07-2023
View history
Request changes
Factored Availability
The Factored Availability is defined as the Asset Availability multiplied by the Asset Element Class value of each active Asset Element on the asset raised to the power of the number of active assets on the asset. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.FactoredAvailability27-04-2021
View history
Request changes
FCRM Strategically Important Asset (SIA)
Is the Asset an FCRM Strategically Important Asset?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.FCRMStrategicallyImportantAssetSIA27-04-2021
View history
Request changes
FCRM Strategically Important Asset (SIA) Band
The banding of the SIA. Mandatory where FCRM Strategically Important Asset (SIA) = True
Picklist
A B C
EA7P09 OperationsNoFeature.Attribute.Name.FCRMStrategicallyImportantAssetSIABand27-04-2021
View history
Request changes
Final Asset Condition
The final recorded condition of the asset after inspection and any manual override.
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.FinalAssetCondition27-04-2021
View history
Request changes
FRMS
The name and code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.FRMS16-01-2024
View history
Request changes
FRMS Code
The code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 10
AutoP09 OperationsNoFeature.Attribute.Name.FRMSCode16-01-2024
View history
Request changes
FRMS Consequence
A measure of the vulnerability of the FRMS to failures of assets, considering the time lag between failure and flooding occuring, and critical infrastructure that may be affected as well as houses. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
HIGHC01 HIGHC02 HIGHC03 HIGHC04 HIGHC08 MEDC06 MEDC07 MEDC12 LOWC05 LOWC09 LOWC10 LOWC11
AutoP09 OperationsNoFeature.Attribute.Name.FRMSConsequence16-01-2024
View history
Request changes
FRMS Name
The name of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 37
AutoP09 OperationsNoFeature.Attribute.Name.FRMSName16-01-2024
View history
Request changes
FWM Act Designated
Is the asset designated under the Floods and Water Management Act 2020?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.FWMActDesignated27-04-2021
View history
Request changes
House Equivalent
A measure of the number of residential properties at increased risk of flooding if the asset is below target condition, which is calculated by default as 10% of the '100 year houses at risk' value from the FRMS. Only applicable when MEICA Elements Present = True
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.HouseEquivalent27-04-2021
View history
Request changes
Insp Freq EIC Inspection
The required frequency of inspection to be conducted by the Engineering Inspection Coordinator. Only applicable when MEICA Elements Present = True
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: months
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqEICInspection26-02-2024
View history
Request changes
Insp Freq PUWER
The required frequency of Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: months
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqPUWER17-10-2023
View history
Request changes
Insp Freq Visual
The required frequency of visual inspection.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: months
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqVisual17-10-2023
View history
Request changes
Inspection Comments
Any specific comments related to the inspection or assessment that are worth noting
Text
Max Length: 600
EA7P15 InspectionYesFeature.Attribute.Name.InspectionComments27-04-2021
View history
Request changes
Inspection ID
The identification number for the individual instance of inspection.
Text
Max Length: 50
EA7P15 InspectionYesFeature.Attribute.Name.InspectionID27-04-2021
View history
Request changes
Inspection Type
The type of inspection to be conducted.
Picklist
Ad Hoc Culvert Internal Inspection Ad Hoc EIC Inspection Ad Hoc PSRA Land Water Ad Hoc PSRA Tree Ad Hoc Visual Asset Inspection Culvert Internal Inspection EIC Inspection MEICA site safety and operation inspection MRM Inspection PSRA Assessment PSRA Land Water PSRA Tree PSRA Tree Assessment PUWER Inspection Section 10 Reservoir Inspection Section 12 Reservoir Inspection Site Inspection - 6 month Transition Inspection Visual Asset Inspection
EA7P15 InspectionNoFeature.Attribute.Name.InspectionType27-04-2021
View history
Request changes
Inspection Unit (EIC)
The inspection unit of inspection to be conducted by the Engineering Inspection Coordinator. Populated via a picklist in AIMS OM. Only applicable when MEICA Elements Present = True
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitEIC26-02-2024
View history
Request changes
Inspection Unit (PUWER)
The inspecton unit reference number for Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitPUWER27-04-2021
View history
Request changes
Inspection Unit (Visual)
The inspecton unit reference for visual inspection. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitVisual27-04-2021
View history
Request changes
Inspector
The name of the Asset Inspector who is conductng the inspection. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P15 InspectionNoFeature.Attribute.Name.InspectionID27-04-2021
View history
Request changes
Interested Party
The details for any parties that have a particular interest in the asset.
Set of linked fields for each interested party:
Party Type (Individial, Organisation), Party, Preferred Contact Method (Email, In Person, Mail, Phone, Text), Address, Post Code, Phone Number 1, Phone Number 2, Fax Number, E-Mail, Consent Obtained, Landowner?
LinkEA7P02 ComplianceNoFeature.Attribute.Name.InterestedParty27-04-2021
View history
Request changes
Internal Drainage Board (IDB)
The Internal Drainage Board within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 100
AutoP02 ComplianceNoFeature.Attribute.Name.InternalDrainageBoardIDB27-04-2021
View history
Request changes
Key / Access Card Details
Details of the key or access card that is required to gain entry. Applicable where Key / Access Card Required = Yes
Text
Max Length: 100
EA7P02 ComplianceNoFeature.Attribute.Name.KeyAccessCardDetails27-04-2021
View history
Request changes
Key / Access Card Required?
Is a key or access card required to gain entry?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.KeyAccessCardRequired27-04-2021
View history
Request changes
KPI881 - Inspections - FCRM 2.3
Is the asset included in the KPI881 (Inspections) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI881Inspections27-04-2021
View history
Request changes
KPI885 - Public Safety Sites
Is the asset included in the KPI885 (Public safety sites) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI885PublicSafetySites27-04-2021
View history
Request changes
KPI962 - Maintaining above required condition - FCRM 1.3
Is the asset included in the KPI962 (Maintaining above required condition) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI962Maintainingaboverequiredcondition27-04-2021
View history
Request changes
KPI965 - Conveyance - FCRM 2.8
Is the asset included in the KPI965 (Conveyance) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI965Conveyance27-04-2021
View history
Request changes
KPI965 - Households at risk - FCRM 2.5
Is the asset included in the KPI965 (Households at risk) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI965Householdsatrisk27-04-2021
View history
Request changes
KPI970 - Performance vs Engineering deadline - FCRM 2.6
Is the asset included in the KPI970 (Performance vs engineering deadline) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI970PerformancevsEngineeringdeadline27-04-2021
View history
Request changes
Landowner Contact Required
Is contact with the landowner needed in order to gain entry?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.LandownerContactRequired27-04-2021
View history
Request changes
Last Routine Inspection
The AIMS OM reference (GUID) of the last recorded routine inspection.
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.LastRoutineInspection27-04-2021
View history
Request changes
Last Visual Inspection
The AIMS OM reference (GUID) of the last recorded visual inspection.
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.LastVisualInspection27-04-2021
View history
Request changes
Last Visual Inspection Comments
Comments on the last visual inspection
Text
Max Length: 500
EA7P15 InspectionNoFeature.Attribute.Name.LastVisualInspectionComments27-04-2021
View history
Request changes
Latitude
The latitude of the asset's geographic location
Number
Max: 56.000000
Min: 49.000000
Number of decimal places: 6
Units: degrees
AutoP09 OperationsYesFeature.Attribute.Name.Latitude27-04-2021
View history
Request changes
Legacy CMMS ID
The element's ID from the legacy CMMS system. Applicable where asset has MEICA maintained elements.
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.LegacyCMMSID27-04-2021
View history
Request changes
Legacy MEICA Site / Asset Name
The element's legacy MEICA site or asset name. Applicable where asset has MEICA maintained elements.
Text
Max Length: 100
AutoP09 OperationsNoFeature.Attribute.Name.LegacyMEICASiteAssetName27-04-2021
View history
Request changes
LineString Type
The type of the Control LineString
Picklist
Axial Crest Invert
EA2P08 ImpactsNoFeature.Attribute.Name.LineStringType27-04-2021
View history
Request changes
Local Authority
The local authority within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.LocalAuthority27-04-2021
View history
Request changes
Location
The location of the asset, for example: nearest town and/or distance downstream of named bridge
Text
Max Length: 400
EA2P09 OperationsNoFeature.Attribute.Name.Location27-04-2021
View history
Request changes
Longitude
The longitude of the asset's geographic location
Number
Max: 2.000000
Min: -7.000000
Number of decimal places: 6
Units: degrees
AutoP09 OperationsYesFeature.Attribute.Name.Longitude27-04-2021
View history
Request changes
Maintainer
The organisation or private individual recognised to be the maintainer of the asset. The maintainer is the organisation or person who manages, and provides for, the maintenance of the asset but they may instruct others to carry out works on their behalf. This information is not mandatory if the asset is not maintained. This is a mandatory field where Not Maintained = No
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsNoFeature.Attribute.Name.Maintainer05-09-2022
View history
Request changes
Maintainer Date Change
The date the Maintainer was changed.
DateEA6P09 OperationsYesFeature.Attribute.Name.MaintainerDateChange18-12-2023
View history
Request changes
Maintainer Function
Department within Maintaining Organisation
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA7P09 OperationsNoFeature.Attribute.Name.MaintainerFunction27-04-2021
View history
Request changes
Maintainer Reason for Change
The reason the Maintainer was changed.
Picklist
Abandonment Handover Incorrectly Recorded New Asset Record
EA6P09 OperationsYesFeature.Attribute.Name.MaintainerReasonForChange18-12-2023
View history
Request changes
MEICA Condition Target
A target value for the Factored Availability of an asset, based upon the FRMS Consequence. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.MEICAConditionTarget27-04-2021
View history
Request changes
MEICA Element Failed
Applicable where MEICA Elements Present = True. Have any of the MEICA elements failed?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.MEICAElementFailed27-04-2021
View history
Request changes
MEICA Elements Present
Are MEICA elements present on the asset? Attribute automatically populated based on whether the asset has any elements which are set as MEICA Maintained Elements.
BooleanAutoP09 OperationsYesFeature.Attribute.Name.MEICAElementsPresent05-09-2022
View history
Request changes
MEICA Supra-Area
The MEICA Supra-Area covering the asset
Picklist
Anglian KSL & HNL Midlands North East North West South West SSD & WT
EA7P09 OperationsNoFeature.Attribute.Name.MEICASupraArea27-04-2021
View history
Request changes
MEICA Team Email Address
The email address of the MEICA team covering the asset
Text
Max Length: 80
EA7P09 OperationsNoFeature.Attribute.Name.MEICATeamEmailAddress27-04-2021
View history
Request changes
MP Constituency
The parliamentary constituency within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.MPConstituency27-04-2021
View history
Request changes
NGR
National Grid Reference. Will be populated by a spatial lookup
Text
Max Length: 12
AutoP09 OperationsNoFeature.Attribute.Name.NGR27-04-2021
View history
Request changes
No of Incoming Pipes
The number of incoming culverts/pipes in the chamber
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NoOfIncomingPipes27-04-2021
View history
Request changes
No of Outgoing Pipes
The number of outgoing culverts/pipes in the chamber
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NoOfOutgoingPipes27-04-2021
View history
Request changes
Northing
The northing of the asset's geographic location (British National Grid)
Number
Max: 700,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA7P09 OperationsYesFeature.Attribute.Name.Northing27-04-2021
View history
Request changes
Number of Landings
The number of landings in the chamber
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NumberOfLandings27-04-2021
View history
Request changes
Operational Area
The asset's Operational Area. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
NE - CMBLNC - FCRM OPS North NE - CMBLNC - FCRM OPS South NE - DBNTLS - FCRM OPS North NE - DBNTLS - FCRM OPS South NE - LCNNTH - FCRM OPS Lincs NE - LCNNTH - FCRM OPS W&N NE - NHUDUT - FCRM OPS NE - YORKS - FCRM OPS N&EY NE - YORKS - FCRM OPS W&SY SE - CAMBED - FCRM OPS SE - ESNFSF - FCRM OPS Essex SE - ESNFSF - FCRM OPS N&S SE - HTSNLN - FCRM OPS East SE - HTSNLN - FCRM OPS West SE - KNTSLN - FCRM OPS East Kent SE - KNTSLN - FCRM OPS SLN & WK SE - KNTSLN - FCRM TTD SE - SLTSDN - FCRM OPS East SE - SLTSDN - FCRM OPS West SE - WTHMS - FCRM OPS Lower SE - WTHMS - FCRM OPS Upper W - DVNCWL - FCRM OPS Devon & Cornwall - FCRM Ops W - GMMYCH - FCRM OPS W - SHHRWG - FCRM OPS W - STWKWM - FCRM OPS W - WESSEX - FCRM OPS E W - WESSEX - FCRM OPS W
AutoP09 OperationsNoFeature.Attribute.Name.OperationalArea16-01-2024
View history
Request changes
Operator
The organisation or private individual recognised to be the operator of the asset
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsYesFeature.Attribute.Name.Operator27-04-2021

Picklist edited 05-09-2022


View history
Request changes
Operator Date Change
The date the Operator was changed.
DateEA6P09 OperationsYesFeature.Attribute.Name.OperatorDateChange18-12-2023
View history
Request changes
Operator Function
Department of Operator
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA7P09 OperationsNoFeature.Attribute.Name.OperatorFunction27-04-2021
View history
Request changes
Operator Reason for Change
The reason the Operator was changed.
Picklist
Abandonment Handover Incorrectly Recorded New Asset Record
EA6P09 OperationsYesFeature.Attribute.Name.OperatorReasonForChange18-12-2023
View history
Request changes
Overridden Equivalent
A manually entered value for House Equivalent. Only applicable when MEICA Elements Present = True and Override = True
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.OverriddenEquivalent27-04-2021
View history
Request changes
Overridden Equivalent Asset Availability
A manually entered value for Asset Factored Availability, to be used instead of the default calculation. Only applicable when MEICA Elements Present = True and Asset Availability Override = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.OverriddenEquivalentAssetAvailability27-04-2021
View history
Request changes
Override
An indication of the use of a manually entered value for House Equivalent, instead of the value calculated by default from the FRMS. Only applicable when MEICA Elements Present = True
BooleanEA7P09 OperationsYesFeature.Attribute.Name.Override27-04-2021
View history
Request changes
Override Condition
New condition of the asset after the override. Only applies when Override Calculated Condition = True
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.OverrideCondition27-04-2021
View history
Request changes
Owner
The organisation or private individual known to be the owner of the asset
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsYesFeature.Attribute.Name.Owner27-04-2021

Picklist edited 05-09-2022


View history
Request changes
Owner Date Change
The date the Owner was changed.
DateEA6P09 OperationsYesFeature.Attribute.Name.OwnerDateChange18-12-2023
View history
Request changes
Owner Function
The Department within the Organisation with Owner responsibility
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.OwnerFunction27-04-2021
View history
Request changes
Owner Reason for Change
The reason the Owner was changed.
Picklist
Incorrectly Recorded New Asset Record Sale
EA6P09 OperationsYesFeature.Attribute.Name.OwnerReasonForChange18-12-2023
View history
Request changes
Parish Council
The parish council within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 200
AutoP09 OperationsNoFeature.Attribute.Name.ParishCouncil27-04-2021
View history
Request changes
Permit to Work Required
Is a permit to work required to work on the asset?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.PermitToWorkRequired27-04-2021
View history
Request changes
Photo
A photograph or image related to the asset.
PhotoEA4P09 OperationsNoFeature.Attribute.Name.Photo17-07-2023
View history
Request changes
Post Code
The postcode within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 15
AutoP09 OperationsNoFeature.Attribute.Name.PostCode27-04-2021
View history
Request changes
Previous Condition
The previous condition of the Asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.PreviousCondition27-04-2021
View history
Request changes
Primary Purpose
The main purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P09 OperationsYesFeature.Attribute.Name.PrimaryPurpose27-04-2021

Picklist edited 14-06-2021


View history
Request changes
Protection Type
The type of protection the asset gives. Mandatory when any Purpose = Flood Risk Management
Picklist
Coastal Fluvial Fluvial/Tidal Surface Water Tidal
EA3P09 OperationsNoFeature.Attribute.Name.ProtectionType27-04-2021
View history
Request changes
PSRA System ID
The ID (GUID) of the PSRA System Asset that the Asset is related to
Text
Max Length: 32
EA6P03 Risk managementNoFeature.Attribute.Name.PSRASystemID27-04-2021
View history
Request changes
PUWER?
Do any of the elements of this asset require PUWER inspections? Only applicable when MEICA Elements Present = True
BooleanEA7P03 Risk managementYesFeature.Attribute.Name.PUWER27-04-2021
View history
Request changes
Raw Condition
The Granular Weighted Asset Condition
Number
Max: 99,999.00
Min: 0.00
Number of decimal places: 2
EA7P15 InspectionNoFeature.Attribute.Name.RawCondition27-04-2021
View history
Request changes
Reason for Asset Discontinued
The reason the asset has been marked as Discontinued. Only applicable when Asset Status = Discontinued.
Picklist
Asset replaced Demolition Other Withholding repair following failure
EA7P09 OperationsNoFeature.Attribute.Name.ReasonForAssetDiscontinued26-02-2024
View history
Request changes
Reason for Selection
Applicable where Candidate for Discontinuation = True. The reason why the asset has been selected for Discontinuation
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.ReasonforSelection27-04-2021
View history
Request changes
Regional Flood & Coastal Committee (RFCC)
The Regional Flood & Coastal Committee within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.RegionalFloodCoastalCommitteeRFCC27-04-2021
View history
Request changes
Related Event Reference
The reference of the event related to the inspection. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.RelatedEventReference27-04-2021
View history
Request changes
Replacement Cost
How much would the Asset cost to completely replace?
Number
Max: 9,999,999,999.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA6P08 ImpactsNoFeature.Attribute.Name.ReplacementCost27-04-2021
View history
Request changes
Replacement Cost Assessment Date
The date the replacement cost of the asset was assessed
DateEA6P08 ImpactsNoFeature.Attribute.Name.ReplacementCostDate27-04-2021
View history
Request changes
Residual Life
The estimated residual life of the asset
Number
Max: 100
Min: 0
Number of decimal places: 0
Units: years
EA6P09 OperationsNoFeature.Attribute.Name.ResidualLife27-04-2021
View history
Request changes
Residual Life Date
The date the residual life was assessed
DateEA6P09 OperationsNoFeature.Attribute.Name.ResidualLifeDate27-04-2021
View history
Request changes
Responsibility Split - Organisation
An organisation that has shared responsibility for the asset. Multiple options can be made
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitOrganisation27-04-2021

Picklist edited 05-09-2022


View history
Request changes
Responsibility Split - Organisation Function
The department within the organisation with shared responsibility
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitOrganisationFunction27-04-2021
View history
Request changes
Responsibility Split - Percentage Split
The percentage of the organisation's responsibility for the asset. All values must total 100%
Number
Max: 99
Min: 0
Number of decimal places: 0
Units: %
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitPercentageSplit27-04-2021
View history
Request changes
Responsible Officer
Who is the Responsible Officer of the Asset? This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibleOfficer27-04-2021
View history
Request changes
Schedule Date
The scheduled date of the inspection or assessment.
DateEA6P15 InspectionYesFeature.Attribute.Name.ScheduleDate27-04-2021
View history
Request changes
SIA Contingency Document Link
The link to the SIA contingency document. Applicable only where FCRM Strategically Important Asset (SIA) = True and SIA Contingency Plans in Place = True
LinkEA7P08 ImpactsNoFeature.Attribute.Name.SIAContingencyDocumentLink27-04-2021
View history
Request changes
SIA Contingency Plans in Place
Are SIA contingency plans in place? Applicable only where FCRM Strategically Important Asset (SIA) = True
BooleanEA7P08 ImpactsYesFeature.Attribute.Name.SIAContingencyPlansinDocument27-04-2021
View history
Request changes
SIA Reason for Submission
The reason for the SIA submission. Mandatory where FCRM Strategically Important Asset (SIA) = True
Text
Max Length: 2000
EA7P08 ImpactsNoFeature.Attribute.Name.SIAReasonforSubmission27-04-2021
View history
Request changes
Site Liaison Officer
Who is the Site Liaison Officer of the Asset? This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.SiteLiaisonOfficer27-04-2021
View history
Request changes
Site Priority
The priority of the Asset. Only applicable when MEICA Elements Present = True
Picklist
High Medium Low
EA6P09 OperationsNoFeature.Attribute.Name.SitePriority27-04-2021
View history
Request changes
Spatial Quality
The data quality flag for the spatial position of the asset
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P09 OperationsNoFeature.Attribute.Name.SpatialQuality27-04-2021
View history
Request changes
Target Condition
The target condition of the Asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P09 OperationsNoFeature.Attribute.Name.TargetCondition27-04-2021
View history
Request changes
Unknown or Not Maintained
Is the asset not maintained?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.UnknownorNotMaintained27-04-2021
View history
Request changes
Water Course Details Set By User
Were the Watercourse details set by the user?
BooleanEA6P15 InspectionYesFeature.Attribute.Name.WaterCourseDetailsSetByUser27-04-2021
View history
Request changes
Water Course GML ID
The GML ID of the Watercourse where the Asset is located
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.WaterCourseGMLID27-04-2021
View history
Request changes
Water Course Valid From
The date that the watercourse was recorded, established, constructed or classified as main river
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.WaterCourseValidFrom27-04-2021
View history
Request changes
Watercourse Alt Name
An alternative name of the Watercourse where the Asset is located
Text
Max Length: 200
EA2P09 OperationsNoFeature.Attribute.Name.WatercourseAltName27-04-2021
View history
Request changes
Watercourse Name
The name of the Watercourse where the Asset is located
Text
Max Length: 200
EA2P09 OperationsNoFeature.Attribute.Name.WatercourseName27-04-2021
View history
Request changes
WFD Waterbody ID
The ID of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.WFDWaterbodyID27-04-2021
View history
Request changes
WFD Waterbody Name
The name of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.WFDWaterbodyName27-04-2021
View history
Request changes
Work Type
The type of work that is required.
Picklist
Ad Hoc Inspection Capital Defence Capital Recondition Capital Maintenance Post Incident Inspection Post Remedial Work Inspection Scheduled Inspection Scheduled Maintenance - Frequent Scheduled Maintenance - Intermittent Unscheduled Maintenance - Reactive
EA7P15 InspectionNoFeature.Attribute.Name.WorkType27-04-2021
View history
Request changes
Year Last Refurbished
The year the asset was last refurbished
Number
Max: 2,999
Min: 1,900
Number of decimal places: 0
EA6P09 OperationsNoFeature.Attribute.Name.YearLastRefurbished27-04-2021
View history
Request changes
Year of Manufacture
The year that the asset was manufactured
Number
Max: 2,099
Min: 1,800
Number of decimal places: 0
EA4P09 OperationsNoFeature.Attribute.Name.YearOfManufacture27-04-2021
View history
Request changes
Request new Attribute
Back to top