Health and Safety

Information Deliverables

K0000

All Health and Safety documentation relating to the project.

27-04-2021

Elements

An Element Type is a component part of an Asset Type. Each Asset Type (except Asset Complex assets) will comprise of a prescribed set of Element Types.  Some Element Types are essential and must be present to define an asset of that Asset Type.  Other Element Types are optional, to be included when needed to define a particular Asset Type instance. An individual asset may have more than one instance of each Element Type.

This table lists the Element Types applicable to this Asset Type.

Element TypeDescriptionElement CodeEssentialUniclass 2015Updates
K0100 F10Copy of F10 as issued to HSE plus any extensions.K01NoTBC27-04-2021
K0100 F10Copy of F10 as issued to HSE plus any extensions.K01NoTBC27-04-2021
K0100 F10Copy of F10 as issued to HSE plus any extensions.K01NoTBC27-04-2021
K0100 F10Copy of F10 as issued to HSE plus any extensions.K01NoTBC27-04-2021
K0200 Pre-Construction / Pre-Works InformationPre-Construction or Pre-Works Information (to include Maintenance Schedules where available).K02NoPM_60_20_6027-04-2021
K0200 Pre-Construction / Pre-Works InformationPre-Construction or Pre-Works Information (to include Maintenance Schedules where available).K02NoPM_60_20_6027-04-2021
K0200 Pre-Construction / Pre-Works InformationPre-Construction or Pre-Works Information (to include Maintenance Schedules where available).K02NoPM_60_20_6027-04-2021
K0200 Pre-Construction / Pre-Works InformationPre-Construction or Pre-Works Information (to include Maintenance Schedules where available).K02NoPM_60_20_6027-04-2021
K0300 Construction Phase PlanConstruction Phase Plan.K03NoPM_60_70_1727-04-2021
K0300 Construction Phase PlanConstruction Phase Plan.K03NoPM_60_70_1727-04-2021
K0300 Construction Phase PlanConstruction Phase Plan.K03NoPM_60_70_1727-04-2021
K0300 Construction Phase PlanConstruction Phase Plan.K03NoPM_60_70_1727-04-2021
K0400 Public SafetyInspections for the purpose of public safety, including Public Safety Risk Assessment (PSRA) and tree inspections.K04NoTBC27-04-2021
K0400 Public SafetyInspections for the purpose of public safety, including Public Safety Risk Assessment (PSRA) and tree inspections.K04NoTBC27-04-2021
K0400 Public SafetyInspections for the purpose of public safety, including Public Safety Risk Assessment (PSRA) and tree inspections.K04NoTBC27-04-2021
K0400 Public SafetyInspections for the purpose of public safety, including Public Safety Risk Assessment (PSRA) and tree inspections.K04NoTBC27-04-2021
K0500 Designers Risk AssessmentDesigners Risk Assessment.K05NoPM_60_70_7027-04-2021
K0500 Designers Risk AssessmentDesigners Risk Assessment.K05NoPM_60_70_7027-04-2021
K0500 Designers Risk AssessmentDesigners Risk Assessment.K05NoPM_60_70_7027-04-2021
K0500 Designers Risk AssessmentDesigners Risk Assessment.K05NoPM_60_70_7027-04-2021
K0600 Risks and Control MeasuresRisk analysis (inc registers) and required control measures including removal, isolation & mitigation.K06NoTBC27-04-2021
K0600 Risks and Control MeasuresRisk analysis (inc registers) and required control measures including removal, isolation & mitigation.K06NoTBC27-04-2021
K0600 Risks and Control MeasuresRisk analysis (inc registers) and required control measures including removal, isolation & mitigation.K06NoTBC27-04-2021
K0600 Risks and Control MeasuresRisk analysis (inc registers) and required control measures including removal, isolation & mitigation.K06NoTBC27-04-2021
K0700 CDM Appointment LettersAppointment letters including the PD and PC.K07NoPM_10_20_0327-04-2021
K0700 CDM Appointment LettersAppointment letters including the PD and PC.K07NoPM_10_20_0327-04-2021
K0700 CDM Appointment LettersAppointment letters including the PD and PC.K07NoPM_10_20_0327-04-2021
K0700 CDM Appointment LettersAppointment letters including the PD and PC.K07NoPM_10_20_0327-04-2021
K0800 Records of Interaction with Health and Safety ExecutiveRecords of interaction with Health and Safety Executive.K08NoTBC27-04-2021
K0800 Records of Interaction with Health and Safety ExecutiveRecords of interaction with Health and Safety Executive.K08NoTBC27-04-2021
K0800 Records of Interaction with Health and Safety ExecutiveRecords of interaction with Health and Safety Executive.K08NoTBC27-04-2021
K0800 Records of Interaction with Health and Safety ExecutiveRecords of interaction with Health and Safety Executive.K08NoTBC27-04-2021
K0900 H and S Audit RecordsRecords of any audits relating to health and safety, including reports from the Principal Designer, site reports, stop go records, record of Principal designers acceptance, and records of any audits carried out during the operational phase.K09NoTBC27-04-2021
K0900 H and S Audit RecordsRecords of any audits relating to health and safety, including reports from the Principal Designer, site reports, stop go records, record of Principal designers acceptance, and records of any audits carried out during the operational phase.K09NoTBC27-04-2021
K0900 H and S Audit RecordsRecords of any audits relating to health and safety, including reports from the Principal Designer, site reports, stop go records, record of Principal designers acceptance, and records of any audits carried out during the operational phase.K09NoTBC27-04-2021
K0900 H and S Audit RecordsRecords of any audits relating to health and safety, including reports from the Principal Designer, site reports, stop go records, record of Principal designers acceptance, and records of any audits carried out during the operational phase.K09NoTBC27-04-2021
K1000 Design RAG List ComplianceHas the designer demonstrated they have reviewed the RAG list and identified appropriate elements where applicable. If there are any RED & AMBER items have they been justified, agreed and signed off by appropriate person(s).K10NoTBC27-04-2021
K1000 Design RAG List ComplianceHas the designer demonstrated they have reviewed the RAG list and identified appropriate elements where applicable. If there are any RED & AMBER items have they been justified, agreed and signed off by appropriate person(s).K10NoTBC27-04-2021
K1000 Design RAG List ComplianceHas the designer demonstrated they have reviewed the RAG list and identified appropriate elements where applicable. If there are any RED & AMBER items have they been justified, agreed and signed off by appropriate person(s).K10NoTBC27-04-2021
K1000 Design RAG List ComplianceHas the designer demonstrated they have reviewed the RAG list and identified appropriate elements where applicable. If there are any RED & AMBER items have they been justified, agreed and signed off by appropriate person(s).K10NoTBC27-04-2021
K1100 HazardsAll known site hazards inc. Asbestos, Confined Spaces, COSHH, NICs, HazID, Hostile Sites, etc.K11NoTBC27-04-2021
K1100 HazardsAll known site hazards inc. Asbestos, Confined Spaces, COSHH, NICs, HazID, Hostile Sites, etc.K11NoTBC27-04-2021
K1100 HazardsAll known site hazards inc. Asbestos, Confined Spaces, COSHH, NICs, HazID, Hostile Sites, etc.K11NoTBC27-04-2021
K1100 HazardsAll known site hazards inc. Asbestos, Confined Spaces, COSHH, NICs, HazID, Hostile Sites, etc.K11NoTBC27-04-2021
K1200 Permit to WorkPermits to perform site based activities including confined spaces entry, electrical isolation activities etc.K12NoTBC27-04-2021
K1200 Permit to WorkPermits to perform site based activities including confined spaces entry, electrical isolation activities etc.K12NoTBC27-04-2021
K1200 Permit to WorkPermits to perform site based activities including confined spaces entry, electrical isolation activities etc.K12NoTBC27-04-2021
K1200 Permit to WorkPermits to perform site based activities including confined spaces entry, electrical isolation activities etc.K12NoTBC27-04-2021
K1300 Site Pack (Internal)Used to detail the work and allow internal teams to manage residual risks of maintenance identified by the Designer and Contractor. Site packs are used for the management of activities that do not fall under the CDM regulations and where a CPP is not proportionate to the risks.K13NoTBC27-04-2021
K1300 Site Pack (Internal)Used to detail the work and allow internal teams to manage residual risks of maintenance identified by the Designer and Contractor. Site packs are used for the management of activities that do not fall under the CDM regulations and where a CPP is not proportionate to the risks.K13NoTBC27-04-2021
K1300 Site Pack (Internal)Used to detail the work and allow internal teams to manage residual risks of maintenance identified by the Designer and Contractor. Site packs are used for the management of activities that do not fall under the CDM regulations and where a CPP is not proportionate to the risks.K13NoTBC27-04-2021
K1300 Site Pack (Internal)Used to detail the work and allow internal teams to manage residual risks of maintenance identified by the Designer and Contractor. Site packs are used for the management of activities that do not fall under the CDM regulations and where a CPP is not proportionate to the risks.K13NoTBC27-04-2021
K1400 Emergency PlanA map based tool that allows Asset Performance and Field steams to set out access routes, hazards and other operational information. They contain sufficient detail to control hazards and manage risk. They are typically used to manage scheduled maintenance, work we do using the same method on a regular basis, such as grass cutting, weed cutting and general structure and channel maintenance.K14NoPM_80_5027-04-2021
K1400 Emergency PlanA map based tool that allows Asset Performance and Field steams to set out access routes, hazards and other operational information. They contain sufficient detail to control hazards and manage risk. They are typically used to manage scheduled maintenance, work we do using the same method on a regular basis, such as grass cutting, weed cutting and general structure and channel maintenance.K14NoPM_80_5027-04-2021
K1400 Emergency PlanA map based tool that allows Asset Performance and Field steams to set out access routes, hazards and other operational information. They contain sufficient detail to control hazards and manage risk. They are typically used to manage scheduled maintenance, work we do using the same method on a regular basis, such as grass cutting, weed cutting and general structure and channel maintenance.K14NoPM_80_5027-04-2021
K1400 Emergency PlanA map based tool that allows Asset Performance and Field steams to set out access routes, hazards and other operational information. They contain sufficient detail to control hazards and manage risk. They are typically used to manage scheduled maintenance, work we do using the same method on a regular basis, such as grass cutting, weed cutting and general structure and channel maintenance.K14NoPM_80_5027-04-2021
K1500 COSHH AssessmentAssessment of COSHH (control of substances hazardous to health).K15NoPM_30_4027-04-2021
K1500 COSHH AssessmentAssessment of COSHH (control of substances hazardous to health).K15NoPM_30_4027-04-2021
K1500 COSHH AssessmentAssessment of COSHH (control of substances hazardous to health).K15NoPM_30_4027-04-2021
K1500 COSHH AssessmentAssessment of COSHH (control of substances hazardous to health).K15NoPM_30_4027-04-2021
K1600 Lifting PlansAny lifting operation can only be undertaken after a lift plan, either Basic or Intermediate and Complex, has been completed. The document is used to plan and coordinate the lifting activity and outlines the equipment, people and site location along with risks and control measures.K16NoTBC27-04-2021
K1600 Lifting PlansAny lifting operation can only be undertaken after a lift plan, either Basic or Intermediate and Complex, has been completed. The document is used to plan and coordinate the lifting activity and outlines the equipment, people and site location along with risks and control measures.K16NoTBC27-04-2021
K1600 Lifting PlansAny lifting operation can only be undertaken after a lift plan, either Basic or Intermediate and Complex, has been completed. The document is used to plan and coordinate the lifting activity and outlines the equipment, people and site location along with risks and control measures.K16NoTBC27-04-2021
K1600 Lifting PlansAny lifting operation can only be undertaken after a lift plan, either Basic or Intermediate and Complex, has been completed. The document is used to plan and coordinate the lifting activity and outlines the equipment, people and site location along with risks and control measures.K16NoTBC27-04-2021
K1700 Winch PlansAny winching operation can only be undertaken after a Winch plan, either Basic or Basic and Advanced, has been completed. The document is used to plan and coordinate the winching activity and outlines the equipment, people and site location along with risks and control measures.K17NoTBC27-04-2021
K1700 Winch PlansAny winching operation can only be undertaken after a Winch plan, either Basic or Basic and Advanced, has been completed. The document is used to plan and coordinate the winching activity and outlines the equipment, people and site location along with risks and control measures.K17NoTBC27-04-2021
K1700 Winch PlansAny winching operation can only be undertaken after a Winch plan, either Basic or Basic and Advanced, has been completed. The document is used to plan and coordinate the winching activity and outlines the equipment, people and site location along with risks and control measures.K17NoTBC27-04-2021
K1700 Winch PlansAny winching operation can only be undertaken after a Winch plan, either Basic or Basic and Advanced, has been completed. The document is used to plan and coordinate the winching activity and outlines the equipment, people and site location along with risks and control measures.K17NoTBC27-04-2021
K1800 Construction Phase Risk AssessmentA construction risk assessment is a critical examination of health and safety hazards at a construction site. Construction risk assessments detail how residual risk from design will be mitigated during construction. Links to the method statements.K18NoTBC27-04-2021
K1800 Construction Phase Risk AssessmentA construction risk assessment is a critical examination of health and safety hazards at a construction site. Construction risk assessments detail how residual risk from design will be mitigated during construction. Links to the method statements.K18NoTBC27-04-2021
K1800 Construction Phase Risk AssessmentA construction risk assessment is a critical examination of health and safety hazards at a construction site. Construction risk assessments detail how residual risk from design will be mitigated during construction. Links to the method statements.K18NoTBC27-04-2021
K1800 Construction Phase Risk AssessmentA construction risk assessment is a critical examination of health and safety hazards at a construction site. Construction risk assessments detail how residual risk from design will be mitigated during construction. Links to the method statements.K18NoTBC27-04-2021
K1900 People & Plant Coordination PlanA People and Plant Co-ordination Plan should be produced where people and plant will be working together. It will include methods of communication between plant and equipment operators and pedestrian site staff.K19NoTBC27-04-2021
K1900 People & Plant Coordination PlanA People and Plant Co-ordination Plan should be produced where people and plant will be working together. It will include methods of communication between plant and equipment operators and pedestrian site staff.K19NoTBC27-04-2021
K1900 People & Plant Coordination PlanA People and Plant Co-ordination Plan should be produced where people and plant will be working together. It will include methods of communication between plant and equipment operators and pedestrian site staff.K19NoTBC27-04-2021
K1900 People & Plant Coordination PlanA People and Plant Co-ordination Plan should be produced where people and plant will be working together. It will include methods of communication between plant and equipment operators and pedestrian site staff.K19NoTBC27-04-2021
K2000 Plant Suitability SelectionDocuments why a particular piece of plant was chosen for an activity and supports our legal responsibility in accordance with Provision and Use of Work Equipment Regulations (PUWER) and its use is mandatory if you use ride-on plant. It will contain information on the plant (make/mobile/reach etc.) and about the site itself (access width, weight/height limits, ground conditions).K20NoTBC27-04-2021
K2000 Plant Suitability SelectionDocuments why a particular piece of plant was chosen for an activity and supports our legal responsibility in accordance with Provision and Use of Work Equipment Regulations (PUWER) and its use is mandatory if you use ride-on plant. It will contain information on the plant (make/mobile/reach etc.) and about the site itself (access width, weight/height limits, ground conditions).K20NoTBC27-04-2021
K2000 Plant Suitability SelectionDocuments why a particular piece of plant was chosen for an activity and supports our legal responsibility in accordance with Provision and Use of Work Equipment Regulations (PUWER) and its use is mandatory if you use ride-on plant. It will contain information on the plant (make/mobile/reach etc.) and about the site itself (access width, weight/height limits, ground conditions).K20NoTBC27-04-2021
K2000 Plant Suitability SelectionDocuments why a particular piece of plant was chosen for an activity and supports our legal responsibility in accordance with Provision and Use of Work Equipment Regulations (PUWER) and its use is mandatory if you use ride-on plant. It will contain information on the plant (make/mobile/reach etc.) and about the site itself (access width, weight/height limits, ground conditions).K20NoTBC27-04-2021
K2100 Employee Operational Instructions (EOI)Employee OIs are for all Environment Agency employees. They're a user-friendly way of giving you the control measures from our generic risk assessments (GRAs). Used alongside the GRAs, they will help you eliminate, reduce or control risk to stay safe at work.K21NoTBC27-04-2021
K2100 Employee Operational Instructions (EOI)Employee OIs are for all Environment Agency employees. They're a user-friendly way of giving you the control measures from our generic risk assessments (GRAs). Used alongside the GRAs, they will help you eliminate, reduce or control risk to stay safe at work.K21NoTBC27-04-2021
K2100 Employee Operational Instructions (EOI)Employee OIs are for all Environment Agency employees. They're a user-friendly way of giving you the control measures from our generic risk assessments (GRAs). Used alongside the GRAs, they will help you eliminate, reduce or control risk to stay safe at work.K21NoTBC27-04-2021
K2100 Employee Operational Instructions (EOI)Employee OIs are for all Environment Agency employees. They're a user-friendly way of giving you the control measures from our generic risk assessments (GRAs). Used alongside the GRAs, they will help you eliminate, reduce or control risk to stay safe at work.K21NoTBC27-04-2021
K2200 Health and Safety Learning From Experience (HASLE Notices)Health and Safety Learning from Experience (HASLE) notices provide details of specific health and safety issues from accidents and dangerous incidents that have affected our people. They share the learning and help prevent similar incidents from happening again.K22NoTBC27-04-2021
K2200 Health and Safety Learning From Experience (HASLE Notices)Health and Safety Learning from Experience (HASLE) notices provide details of specific health and safety issues from accidents and dangerous incidents that have affected our people. They share the learning and help prevent similar incidents from happening again.K22NoTBC27-04-2021
K2200 Health and Safety Learning From Experience (HASLE Notices)Health and Safety Learning from Experience (HASLE) notices provide details of specific health and safety issues from accidents and dangerous incidents that have affected our people. They share the learning and help prevent similar incidents from happening again.K22NoTBC27-04-2021
K2200 Health and Safety Learning From Experience (HASLE Notices)Health and Safety Learning from Experience (HASLE) notices provide details of specific health and safety issues from accidents and dangerous incidents that have affected our people. They share the learning and help prevent similar incidents from happening again.K22NoTBC27-04-2021
K2300 Change of RiskA Change of Risk form is used to assess unexpected working conditions following a Dynamic Risk Assessment.K23NoTBC27-04-2021
K2300 Change of RiskA Change of Risk form is used to assess unexpected working conditions following a Dynamic Risk Assessment.K23NoTBC27-04-2021
K2300 Change of RiskA Change of Risk form is used to assess unexpected working conditions following a Dynamic Risk Assessment.K23NoTBC27-04-2021
K2300 Change of RiskA Change of Risk form is used to assess unexpected working conditions following a Dynamic Risk Assessment.K23NoTBC27-04-2021
K2400 SHEW ReportsSafety, Health, Environment and Wellbeing reports.K24NoTBC27-04-2021
K2400 SHEW ReportsSafety, Health, Environment and Wellbeing reports.K24NoTBC27-04-2021
K2400 SHEW ReportsSafety, Health, Environment and Wellbeing reports.K24NoTBC27-04-2021
K2400 SHEW ReportsSafety, Health, Environment and Wellbeing reports.K24NoTBC27-04-2021
Request new Element

Attributes

An attribute is a particular piece of data that describes a property of an object. Each Asset Type is described by a different set of attributes, although there are some attributes that are common to many Asset Types.

The table below lists the attributes that are applicable to this Asset Type, along with the data profile requirements for each attribute and details of when and how each should be used and delivered.

AttributeFormat DetailsDeliveryPurposeMandatorygeoCOBie MappingUpdates