Weir

Structure

A low barrier that is built across the width of a watercourse to control the flow or upstream water level. There are many reasons this may be required such as flow gauging, offtakes, amenity or navigation.

A weir is fixed in one position, if it is adjustable (for example in height), it should be classified as a Control Gate or In Channel Stoplogs.

Weirs are displayed in the Environment Agency's AIMS OM system as a polyline showing the centre of the structure.

Environment Agency symbology for Weir.
Environment Agency symbology for Weir.

New linear assets should be limited to the minimum of: continuous single ownership, common design or common construction length or 600m. Longer asset runs must be defined (chunked) as separate assets.

05-09-2022

Elements

An Element Type is a component part of an Asset Type. Each Asset Type (except Asset Complex assets) will comprise of a prescribed set of Element Types.  Some Element Types are essential and must be present to define an asset of that Asset Type.  Other Element Types are optional, to be included when needed to define a particular Asset Type instance. An individual asset may have more than one instance of each Element Type.

This table lists the Element Types applicable to this Asset Type.

Element TypeDescriptionElement CodeEssentialUniclass 2015Updates
Access PointThe access point to a building or structure.ACCNoSL_90_20_2727-04-2021
Access StripA strip of land that is used for access to an asset for operational or maintenance purposes.ASPNoSL_32_35_0227-04-2021
ActuatorA component of a machine that is responsible for moving and controlling a mechanism on receiving a control signal.ACTNoPr_75_50_0227-04-2021
ApronThe scour protection structure laid immediately upstream and/or downstream of a structure.APNNoSL_32_50_7627-04-2021
Bearing PilingLong columnar elements driven deep into the ground to support structures above. For example, piled foundations. Does not include piling for retaining walls which is covered by sheet piling.PLGNoPr_20_85_6214-06-2021
Capping BeamA concrete beam running along the top of a line of sheet piles to increase stability and 'cap' the piles.CBMNoSs_20_50_30_1127-04-2021
Central Support StructureA structure built in a channel which provides an intermediate support to a structure spanning the channel.
More significant structures of this nature which also provide a platform or building for accommodating equipment, machinery and/or operating personnel should be classified as separate Central Pier assets.
CSSNoSs_20_50_3027-04-2021
CrestThe highest point or surface of an asset which retains water (e.g. embankment, beach, weir). This may be a wide surface as in the top of an embankment or a narrow crest as in the top of a wall.CRTYesSL_32_40_2827-04-2021
Datum Plates and MarkersA temporary or permanent fixing which a point of known elevation marked for the purpose of surveying.DTMNoPr_40_10_77_2014-06-2021
DavitAn appliance used for lifting, usually fitted into a pre-installed ground socket prior to use and then removed for storage.DAVNoPr_40_70_75_2127-04-2021
DaymarkThe part of an aid to navigation that is visible during daylight.DAYNoPr_40_10_90_2127-04-2021
Downstream FaceThe vertical or inclined side of an asset that faces downstream.DSFNoSL_32_85_9827-04-2021
Drive AssemblyThe components that enable movement of an asset.DASNoPr_85_50_27_2427-04-2021
Expansion JointA separation between different sections of a structure (usually concrete) to allow for relative movement between the sections without damaging the structure. The gap may be filled with an elastic material like silicone to provide a watertight structure.EXJNoPr_35_90_2727-04-2021
GantryA bridge-like framework or platform suspended over or adjacent to assets. A gantry can support equipment or allow people to access or walk over the top of assets.GANNoSs_37_17_3514-06-2021
Guide PilePiles which keep floating platforms or booms in place but allow for movement cause by waves or tides.GPLNoPr_40_70_55_3527-04-2021
LadderA ladder that is fixed in place or designed for a particular location to enable access to and egress from part of an asset or group of assets. Includes step irons.LADNoPr_25_30_85_0227-04-2021
Left Bank WallThe wall on the left bank of a channel, where an in-channel structure is located. Usually provides support for the in-channel structure in addition to retaining the river bank. (Left bank is left when looking downstream).LBWNoSs_20_50_10_9527-04-2021
Mooring PointAny means of fixing or anchoring a vessel or buoy to either land or the bed of a watercourse or the sea, except a mooring pile which is captured separately.MPTNoPr_40_70_5527-04-2021
Navigation LightThe part of an aid to navigation that is visible at night and/or poor light conditions or when designed to be visible.NLTNoSs_70_80_01_4727-04-2021
Paddles and RymersA feature of some weirs on the Thames. Rymers (large wooden posts) are placed in a slot at the bottom of the river and paddles of different heights are placed against these to hold back water.PRYNoSL_32_85_6027-04-2021
Pile CappingA concrete cap added on top of multiple piles to group them together, so that loads above are transferred into multiple piles.PCPNoPr_20_85_62_1927-04-2021
Right Bank WallThe wall on the right bank of a channel, where an in-channel structure is located. Usually provides support for the in-channel structure in addition to retaining the river bank. (Right bank is right when looking downstream).RBWNoSs_20_50_10_9527-04-2021
Sheet PilingSections of sheet materials with interlocking edges that are driven into the ground to form a retaining wall. Most commonly made of steel, but can also be formed of timber or reinforced concrete.SPGNoPr_20_85_62_1627-04-2021
Stoplogs and LasherboardsRemovable boards or blocks which are slotted into a frame to act as a barrier to water flow.SLGNoPr_60_45_30_8427-04-2021
Treads and RisersThe alternating horizontal (treads) and vertical (risers) elements that make up a set of steps.TRRNoPr_25_30_9005-09-2022
Upstream FaceThe vertical or inclined side of an asset that faces upstream.USFNoSL_32_85_9827-04-2021
WalingA structural horizontal member attached to the side of sheet piling to provide additional support and tie piles together.WAGNoPr_20_85_62_9627-04-2021
Weir PlateA component of some weirs used for flow measurement - a thin plate placed as a barrier across a watercourse over which water flows.WEPNoPr_60_45_30_9727-04-2021
Request new Element

Attributes

An attribute is a particular piece of data that describes a property of an object. Each Asset Type is described by a different set of attributes, although there are some attributes that are common to many Asset Types.

The table below lists the attributes that are applicable to this Asset Type, along with the data profile requirements for each attribute and details of when and how each should be used and delivered.

AttributeFormat DetailsDeliveryPurposeMandatorygeoCOBie MappingUpdates
(Inspection) Data Quality
The quality of the data captured during an inspection
Picklist
1 - All elements visually assessed and graded 2 - Manual Override has been used to change calculated asset condition 3 - A single element that was inspected satisfactorily on the last inspection is not visible at the current inspection 4 - Two or more elements that were inspected satifactorily on the last inspection are not visible at the current inspection 5 - One or more elements are not visible for 2 or more consecutive inspections since the last satisfactory inspection
EA7P15 InspectionNoFeature.Attribute.Name.InspectionDataQuality27-04-2021
Action Required (3rd party assets only)
What action is required before repair works can commence? Only available if Below Required Condition = Yes
Picklist
Contact Owner Emergency Work Enforcement Establish Ownership Repair Asset N/A
EA7P15 InspectionNoFeature.Attribute.Name.ActionRequired3rdPartyAssetsOnly04-05-2021
Action Where Asset Fell BRC
The ID (GUID) of the action where the asset fell below required condition. Only available if Below Required Condition = Yes
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.ActionWhereAssetFellBRC04-05-2021
Adjusted Repair Deadline Date
If a further assessment has had to take place, the repair works have been delayed or mitigation measures have been put in place, what is the new date for the permanent repair of the asset? Only available if Below Required Condition = Yes
DateEA7P10 MaintenanceNoFeature.Attribute.Name.AdjustedRepairDeadlineDate04-05-2021
Adjusted Repair Deadline Duration
If following review the repair deadline needs adjusting, the estimated time it will take to repair the asset in months. Only available if Below Required Condition = Yes
Number
Max: 120
Min: 0
Number of decimal places: 0
Units: months
EA7P10 MaintenanceNoFeature.Attribute.Name.AdjustedRepairDeadlineDuration04-05-2021
Agreed by Designated Engineer
Have the decisions and repair deadline been agreed by a designated Engineer? Only available if Below Required Condition = Yes
Picklist
Yes No
EA7P10 MaintenanceNoFeature.Attribute.Name.AgreedByDesignatedEngineer04-05-2021
Alt. Asset Ref
The alternative asset reference used to cross reference to other data systems
Text
Max Length: 150
EA2P09 OperationsNoFeature.Attribute.Name.AltAssetRef27-04-2021
Alternative Purpose 1
An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P01 RegistrationNoFeature.Attribute.Name.AlternativePurpose127-04-2021

Picklist edited 14-06-2021

Alternative Purpose 2
An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P01 RegistrationNoFeature.Attribute.Name.AlternativePurpose227-04-2021

Picklist edited 14-06-2021

Animal Damage
The main species that has caused damage to the asset. Only available if Below Required Condition = Yes
Picklist
Badger Cattle Horse Rabbit Sheep Mole N/A Other
EA7P15 InspectionNoFeature.Attribute.Name.AnimalDamage04-05-2021
Annual Maintenance Costs (Current FY)
How much the asset costs this year to maintain to target condition
Number
Max: 1,000,000,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P10 MaintenanceNoFeature.Attribute.Name.AnnualMaintenanceCostsCurrentFY27-04-2021
Annual Maintenance Costs (Previous FY)
How much the asset cost last year to maintain to target condition
Number
Max: 1,000,000,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P10 MaintenanceNoFeature.Attribute.Name.AnnualMaintenanceCostsPreviousFY27-04-2021
Asbestos on Site
Is the site on the Asbestos Register?
BooleanEA3P03 Risk managementYesFeature.Attribute.Name.AsbestosOnSite27-04-2021
Assessment Date
The date that the adjusted repair deadline was assessed. Only available if Below Required Condition = Yes
DateEA7P10 MaintenanceNoFeature.Attribute.Name.AssessmentDate04-05-2021
Assessment Reason Text
Description of the reason for the inspection.
Text
Max Length: 200
EA7P15 InspectionNoFeature.Attribute.Name.AssessmentReasonText27-04-2021
Asset Availability
The Asset Availability is the normalised product of the individual Asset Element availabilities within the Asset. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.AssetAvailability27-04-2021
Asset Below MEICA Condition Target
An indication that an asset has an Asset Availability below its MEICA condition target. Only applicable when MEICA Elements Present = True
BooleanEA7P15 InspectionYesFeature.Attribute.Name.AssetBelowMEICAConditionTarget27-04-2021
Asset Category
The Category of the asset
Picklist
Structure
EA2P01 RegistrationYesFeature.Attribute.Name.AssetCategory27-04-2021
Asset Complex 1
The ID (GUID) of the Asset Complex that this asset belongs to
Text
Max Length: 32
EA6P09 OperationsNoFeature.Attribute.Name.AssetComplex227-04-2021
Asset Complex 2
The ID (GUID) of the Secondary Asset Complex that the asset belongs to
Text
Max Length: 32
EA6P09 OperationsNoFeature.Attribute.Name.AssetComplex127-04-2021
Asset Complex Ref 1
The Asset Reference of the first Asset Complex which contains this asset
Text
Asset code xx + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetComplexRef127-04-2021
Asset Complex Ref 2
The Asset Reference of an additional Asset Complex which contains this asset
Text
Asset code xx + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetComplexRef227-04-2021
Asset End Date
The end date of the asset. This is only to be populated when asset is withdrawn or fully decommissioned
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetEndDate27-04-2021
Asset Factored Availability Override
An indication of the use of a manually entered value for Site Factored Availability, instead of the value calculated by default. Only applicable when MEICA Elements Present = True
BooleanEA7P09 OperationsYesFeature.Attribute.Name.AssetFactoredAvailabilityOverride27-04-2021
Asset Height
The total height of the structure, taken from ground level to its highest tangible point.
Number
Max: 200.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA6P09 OperationsNoFeature.Attribute.Name.AssetHeight27-04-2021
Asset ID
The Asset ID from the AIMS OM system, if known. For new assets that are not yet in AIMS OM, use "n/a".
Text
Max Length: 50
EA2P01 RegistrationYesFeature.Attribute.Name.AssetID14-06-2021
Asset Name
The name of the asset if it has one
Text
Max Length: 150
EA2P01 RegistrationNoFeature.Attribute.Name.AssetName27-04-2021
Asset Ref
Unique asset reference code in scheme context assigned by scheme designer, e.g. SW0123
Text
Asset code SW + sequence number
EA2P01 RegistrationNoFeature.Attribute.Name.AssetRef27-04-2021
Asset Risk Value
The Risk Value is calculated as the Risk Variance multiplied by the Estimated Avoided Damages Value. Only applicable when MEICA Elements Present = True
Number
Max: 99,999,999,999.00
Min: -99,999,999,999.00
Number of decimal places: 2
Units: pounds
EA7P15 InspectionNoFeature.Attribute.Name.AssetRiskValue27-04-2021
Asset Risk Variance
The Risk Variance is calculated using the following formula: ((Factored Availability / FRMS 'MEICA Condition Target') - 1) * Used House Equivalent. Only applicable when MEICA Elements Present = True
Number
Max: 999,999.00
Min: -999,999.00
Number of decimal places: 2
EA7P15 InspectionNoFeature.Attribute.Name.AssetRiskVariance27-04-2021
Asset Start Date
The date the asset becomes operational
DateEA7P01 RegistrationNoFeature.Attribute.Name.AssetStartDate27-04-2021
Asset Status
The status of the asset
Picklist
Active Discontinued New asset record for review Proposed asset Under construction
EA5P01 RegistrationYesFeature.Attribute.Name.AssetStatus27-04-2021
Asset Status Date
The date the status of the asset was assessed
DateEA5P01 RegistrationYesFeature.Attribute.Name.AssetStatusDate27-04-2021
Asset Type
The type of asset
Picklist
Weir
EA2P01 RegistrationYesFeature.Attribute.Name.AssetType27-04-2021
Asset Width
The total width/span of the structure
Number
Max: 10,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA3P01 RegistrationNoFeature.Attribute.Name.AssetWidth27-04-2021
Below Required Condition
Is the Asset below required condition?
BooleanEA7P15 InspectionYesFeature.Attribute.Name.BelowRequiredCondition27-04-2021
Benefit Cost Ratio
What is the benefit cost ratio of the required repair of the asset? Only available if Below Required Condition = Yes
Number
Max: 999,999.99
Min: 0.00
Number of decimal places: 2
EA7P08 ImpactsNoFeature.Attribute.Name.BenefitCostRatio04-05-2021
Bio Flag Detail Type
The type of Bio Flag
Picklist
Badgers Bats Birds - Breeding Birds - Migrating Birds - Wintering Dormice Fish - Coarse Fish - Salmonids Pollinator Site Reptiles SAC SPA SSSI Water Voles
EA7P03 Risk managementNoFeature.Attribute.Name.BioFlagDetailType27-04-2021
Bounding Box
A geospatial orthogonal bounding box cube containing the extent of the asset. This is to be expressed as a JSON lineString: [[lower left point easting,lower left point northing,lowest point elevation],[upper right point easting,upper right point northing,highest point elevation]] of the cube with geoCOBie Unit of 'bbox:EPSG7405:ETRS89:OSTN15:OSGM15'
Geometry
Units: bbox:EPSG7405:ETRS89:OSTN15:OSGM15
EA2P01 RegistrationNoFeature.Attribute.Name.BoundingBox05-09-2022
BRC Assessment Comments
Comments related to the assessment that the asset has fallen below required condition. Only available if Below Required Condition = Yes
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.BRCAssessmentComments04-05-2021
BRC Date
The date that the Asset was inspected to be below required condition. Only available if Below Required Condition = Yes
DateEA7P09 OperationsNoFeature.Attribute.Name.BRCDate04-05-2021
Calculated Asset Availability
The Calculated Asset Availability is the value of asset availability which is used in further calculations, e.g. to compare against target. It is either the default value of Asset Availability or the Overridden Equivalent if this is used. Only applicable when MEICA Elements Present = True
Number
Max: 1.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.CalculatedAssetAvailability27-04-2021
Calculated Condition
The overall calculated condition of the asset based on the actual condition of the elements and the element weightings
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionYesFeature.Attribute.Name.CalculatedCondition27-04-2021
Candidate for Discontinuation
Is the Asset a candidate for Discontinuation?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.CandidateforDiscontinuation27-04-2021
Candidate for Maintenance Withdrawal
Is this asset a candidate to withdraw maintenance from? Only available if Below Required Condition = Yes
Picklist
Yes No
EA7P09 OperationsNoFeature.Attribute.Name.CandidateForMaintenanceWithdrawal04-05-2021
Capital Project Reference
The reference of the Capital project to which the works are linked. Only available if Below Required Condition = Yes
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.CapitalProjectReference04-05-2021
Comments
Other comments about the asset
Text
Max Length: 2000
EA2P09 OperationsNoFeature.Attribute.Name.Comments27-04-2021
Comments (Document)
Comments about the document (see File (Document) attribute)
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.CommentsDocument27-04-2021
Completion Date
The date that the inspection or assessment was completed
DateEA7P15 InspectionNoFeature.Attribute.Name.CompletionDate27-04-2021
Condition Measure
The Condition Measure is the highest value in the ConditionThreshold table that is less than or equal to the Asset Availability. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.ConditionMeasure27-04-2021
Condition Target
A condition target against which to compare the Condition Measure. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P15 InspectionNoFeature.Attribute.Name.ConditionTarget27-04-2021
Confined Spaces
Is the site on the Confined Spaces Register?
BooleanEA3P09 OperationsYesFeature.Attribute.Name.ConfinedSpaces27-04-2021
Consequence of Failure
What would the consequence of this failure be? Only available if Below Required Condition = Yes
Text
Max Length: 50
EA7P03 Risk managementNoFeature.Attribute.Name.ConsequenceOfFailure04-05-2021
Control LineString
A spatial lineString that locates the asset and further classified by the associated LineStringType attribute confirming its relative location to the asset. A lineString is a series of design or measured spatial triple points (easting, northing, elevation) each connected by a single non-crossing line, with single points at each end, that locate an asset. A lineString is expressed as a JSON array of type geoJSON lineString, e.g. [[x1,y1,z1],[x2,y2,z2],...] It is further classified by the associated LineStringType attribute confirming its relative location to the asset. Interim points should be spaced at a maximum of 2m for lines < 10m in length, or 10m otherwise. LineStrings may be open as in the case of linear asset types or closed (polygon) in the case of land or site assets. For linear assets, see the note in the description above about the maximum length. The default CRS is a 3D CRS to EPSG 7405 with confirmed type, European reference frame and UK OS transformation with geoCOBie Unit of 'LineString:EPSG7405:ETRS89:OSTN15:OSGM15'
Geometry
Units: LineString:EPSG7405:ETRS89:OSTN15:OSGM15
EA2P02 ComplianceNoFeature.Attribute.Name.ControlLineString05-09-2022
County
The county within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.County27-04-2021
Current Condition
The current condition of the asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P09 OperationsNoFeature.Attribute.Name.CurrentCondition27-04-2021
Current SOP
The Standard of Protection (1:n) that the asset currently provides, if known
Number
Max: 9,999
Min: 0
Number of decimal places: 0
Units: 1:n years
EA7P09 OperationsYesFeature.Attribute.Name.CurrentSOP27-04-2021
Current SOP Date
The date the Current Standard of Protection was appraised
DateEA7P09 OperationsYesFeature.Attribute.Name.CurrentSOPDate27-04-2021
Current SOP DQF
The data quality flag for the Current Standard of Protection
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P09 OperationsYesFeature.Attribute.Name.CurrentSOPDQF27-04-2021
Current SOP DQF Date
The date the Data Quality Flag for the Current Standard of Protection was assessed
DateEA7P09 OperationsYesFeature.Attribute.Name.CurrentSOPDQFDate27-04-2021
Date (Document)
The date of the document (see File (Document) attribute)
DateEA7P09 OperationsNoFeature.Attribute.Name.DateDocument27-04-2021
Date (Photo)
The date of the photograph or image (see Photo attribute)
DateEA4P09 OperationsNoFeature.Attribute.Name.DatePhoto27-04-2021
Date of Final Assessment
The date that the assessment was carried out. Only available if Below Required Condition = Yes
DateEA7P09 OperationsNoFeature.Attribute.Name.DateofFinalAssessment04-05-2021
Date Started
The date that the inspection or assessment started
DateEA7P15 InspectionNoFeature.Attribute.Name.DateStarted27-04-2021
Default AP Team
The default Asset Performance team for inspections. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W)
EA7P15 InspectionNoFeature.Attribute.Name.DefaultAPTeam27-04-2021
Default AP Team Email Address
The email address of the default Asset Performance team. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 500
EA6P15 InspectionNoFeature.Attribute.Name.DefaultAPTeamEmailAddress27-04-2021
Default Field Team
The default Field team carrying our work on this Asset. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W)
EA6P15 InspectionNoFeature.Attribute.Name.DefaultFieldTeam27-04-2021
Default Field Team Email Address
The email address of the default Field team. Only applicable when one of the asset's purposes is Flood Risk Management.
Text
Max Length: 500
EA6P15 InspectionNoFeature.Attribute.Name.DefaultFieldTeamEmailAddress27-04-2021
Default Geo Type
The default geographic feature type of the asset in AIMS OM
Picklist
Line
EA6P09 OperationsYesFeature.Attribute.Name.DefaultGeoType14-06-2021
Delivery Date
The date that the asset was delivered
DateEA4P09 OperationsNoFeature.Attribute.Name.DeliveryDate27-04-2021
Description
A brief description of the asset and/or its construction type
Text
Max Length: 400
EA2P09 OperationsNoFeature.Attribute.Name.Description27-04-2021
Description (Photo)
A description of the photograph or image (see Photo attribute)
Text
Max Length: 500
EA4P09 OperationsNoFeature.Attribute.Name.DescriptionPhoto27-04-2021
Design Flow Rate
The maximum flow rate that the asset was designed for
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
Units: litres per second
EA3P09 OperationsNoFeature.Attribute.Name.DesignFlowRate27-04-2021
Design SOP
The Standard of Protection (1:n) that the asset was designed to provide
Number
Max: 9,999
Min: 0
Number of decimal places: 0
Units: 1:n years
EA7P15 InspectionYesFeature.Attribute.Name.DesignSOP27-04-2021
Design SOP Date
The date the Design Standard of Protection was appraised
DateEA7P15 InspectionYesFeature.Attribute.Name.DesignSOPDate27-04-2021
Design SOP DQF
The data quality flag for the Design Standard of Protection
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P15 InspectionYesFeature.Attribute.Name.DesignSOPDQF27-04-2021
Design SOP DQF Date
The date the Data Quality Flag for the Design Standard of Protection was assessed
DateEA7P15 InspectionYesFeature.Attribute.Name.DesignSOPDQFDate27-04-2021
Design UCL
The level of the crest as it was designed to be:
- at the upstream extent of fluvial or tidal assets,
- or the leftmost extent of coastal assets (when looking out to sea)
(including any allowances for uncertainty or settlement)
Number
Max: 300.000
Min: 0.000
Number of decimal places: 3
Units: mAOD
EA7P15 InspectionNoFeature.Attribute.Name.DesignUCL27-04-2021
Designated Engineer
Who was the designated engineer that approved the assessment? Only available if Below Required Condition = Yes. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.DesignatedEngineer04-05-2021
Designated Engineer Comment
Comments by the designated engineer. Only available if Below Required Condition = Yes
Text
Max Length: 2000
EA7P09 OperationsNoFeature.Attribute.Name.DesignatedEngineerComment04-05-2021
Deterioration Rate Used
The estimated deterioration rate of the asset, which has been used to set the repair deadline. Only available if Below Required Condition = Yes
Picklist
Fastest Most Likely Slowest
EA6P09 OperationsNoFeature.Attribute.Name.DeteriorationRateUsed04-05-2021
EA Water Management Area
The Area the Asset is located in
Picklist
Cumbria and Lancashire Devon Cornwall and the Isles of Scilly East Anglia East Midlands Greater Manchester Merseyside and Cheshire Hertfordshire and North London Kent South London and East Sussex Lincolnshire and Northamptonshire North East Solent and South Downs Thames Wessex West Midlands Yorkshire
EA7P09 OperationsYesFeature.Attribute.Name.EAWaterManagementArea27-04-2021
EAD Override
Override Estimated Annual Damage. Only available if Below Required Condition = Yes
Number
Max: 999,999
Min: 0
Number of decimal places: 0
Units: pounds
EA7P09 OperationsNoFeature.Attribute.Name.EADOverride04-05-2021
Easting
The easting of the asset's geographic location (British National Grid)
Number
Max: 700,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA7P15 InspectionYesFeature.Attribute.Name.Easting27-04-2021
Effective Crest Level
The real, measured crest level at the lowest point along a linear defence asset
Number
Max: 300.000
Min: 0.000
Number of decimal places: 3
Units: mAOD
EA7P15 InspectionNoFeature.Attribute.Name.EffectiveCrestLevel27-04-2021
Effective Crest Level Date
The date the effective crest level was taken
DateEA7P15 InspectionNoFeature.Attribute.Name.EffectiveCrestLevelDate27-04-2021
Effective Crest Level DQF
The data quality flag for the effective crest level
Picklist
1 - +/- 0.01m to 0.05m vertical accuracy (Typically on site survey) 2 - +/- >0.05m to 0.15m vertical accuracy (Typically LIDAR or Photogrammetry) 3 - +/- >0.15m to 0.75m vertical accuracy (Typically older (pre 2004) LIDAR or Photogrammetry) 4 - +/- 0.75m or more vertical accuracy
EA7P15 InspectionNoFeature.Attribute.Name.EffectiveCrestLevelDQF27-04-2021
Effective Crest Level DQF Date
The date the Data Quality Flag for Effective Crest Level was assessed
DateEA7P15 InspectionNoFeature.Attribute.Name.EffectiveCrestLevelDQFDate27-04-2021
End of Life Liabilities
How much an asset will eventually cost to decommission (e.g. how much it will cost to demolish or make safe, how much we would need to pay to get out of a signed maintenance agreement, etc)
Number
Max: 9,999,999,999.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P09 OperationsNoFeature.Attribute.Name.EndofLifeLiabilities27-04-2021
Estimated Cost of Repair
How much is it estimated that it will cost to repair back to or better than required condition. Only available if Below Required Condition = Yes
Number
Max: 999,999
Min: 0
Number of decimal places: 0
Units: pounds
EA7P08 ImpactsNoFeature.Attribute.Name.EstimatedCostofRepair04-05-2021
Exclude from External Publication
Should the attribute be excluded from being shared publicly? E.g. if the values recorded are sensitive information, personal information or contact details.
BooleanEA7P06 SecurityYesFeature.Attribute.Name.ExcludefromExternalPublication27-04-2021
Factored Availability
The Factored Availability is defined as the Asset Availability multiplied by the Asset Element Class value of each active Asset Element on the asset raised to the power of the number of active assets on the asset. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.FactoredAvailability27-04-2021
FCRM Strategically Important Asset (SIA)
Is the Asset an FCRM Strategically Important Asset?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.FCRMStrategicallyImportantAssetSIA27-04-2021
FCRM Strategically Important Asset (SIA) Band
The banding of the SIA. Mandatory where FCRM Strategically Important Asset (SIA) = True
Picklist
A B C
EA7P09 OperationsNoFeature.Attribute.Name.FCRMStrategicallyImportantAssetSIABand27-04-2021
File (Document)
A document related to the asset, other than a photograph.
Metadata for this document should be recorded in the following attributes: Comments (Document), Date (Document), Filename (Document), Reference (Document), Version (Document)
LinkEA7P09 OperationsNoFeature.Attribute.Name.FileDocument27-04-2021
Filename (Document)
The filename of the document (see File (Document) attribute)
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.FilenameDocument27-04-2021
Filename (Photo)
The filename of the photograph or image (see Photo attribute)
Text
Max Length: 150
EA4P09 OperationsNoFeature.Attribute.Name.FilenamePhoto27-04-2021
Final Asset Condition
The final recorded condition of the asset after inspection and any manual override.
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.FinalAssetCondition27-04-2021
Financial Year
The current financial year
Number
Max: 2,100
Min: 1,980
Number of decimal places: 0
EA7P09 OperationsNoFeature.Attribute.Name.FinancialYear27-04-2021
FRMS
The name and code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.FRMS27-04-2021
FRMS Code
The code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. This is populated via a picklist in AIMS OM.
Text
Max Length: 10
EA7P09 OperationsNoFeature.Attribute.Name.FRMSCode27-04-2021
FRMS Consequence
A measure of the vulnerability of the FRMS to failures of assets, considering the time lag between failure and flooding occuring, and critical infrastructure that may be affected as well as houses. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
HIGHC01 HIGHC02 HIGHC03 HIGHC04 HIGHC08 MEDC06 MEDC07 MEDC12 LOWC05 LOWC09 LOWC10 LOWC11
EA7P09 OperationsNoFeature.Attribute.Name.FRMSConsequence27-04-2021
FRMS Name
The name of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. This is populated via a picklist in AIMS OM.
Text
Max Length: 37
EA7P09 OperationsNoFeature.Attribute.Name.FRMSName27-04-2021
Funding End Date
What is the final day that the funding is available? Only available if Below Required Condition = Yes
DateEA7P09 OperationsNoFeature.Attribute.Name.FundingEndDate04-05-2021
Funding Start Date
What is the first day that the funding is available? Only available if Below Required Condition = Yes
DateEA7P09 OperationsNoFeature.Attribute.Name.FundingStartDate04-05-2021
FWM Act Designated
Is the asset designated under the Floods and Water Management Act 2020?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.FWMActDesignated27-04-2021
Health and Safety Flag Detail
The type of Health and Safety Flag
Picklist
Hostile Sites Red Card
EA7P02 ComplianceNoFeature.Attribute.Name.HealthandSafetyFlagDetail27-04-2021
House Equivalent
A measure of the number of residential properties at increased risk of flooding if the asset is below target condition, which is calculated by default as 10% of the '100 year houses at risk' value from the FRMS. Only applicable when MEICA Elements Present = True
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.HouseEquivalent27-04-2021
Include in Floodmap
The Floodmap inclusion assessment.
Picklist
Considered and Accepted Considered and Rejected Not Yet Considered
EA7P09 OperationsNoFeature.Attribute.Name.IncludeInFloodmap27-04-2021
Insp Freq EIC Inspection
The required frequency of inspection to be conducted by the Engineering Inspection Coordinator.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqEICInspection27-04-2021
Insp Freq PUWER
The required frequency of Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqPUWER27-04-2021
Insp Freq Visual
The required frequency of visual inspection.
Number
Max: 999,999,999
Min: 0
Number of decimal places: 0
EA7P15 InspectionNoFeature.Attribute.Name.InspFreqVisual27-04-2021
Inspected By
Who carried out the inspection or assessment?
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectedBy27-04-2021
Inspection Comments
Any specific comments related to the inspection or assessment that are worth noting
Text
Max Length: 600
EA7P15 InspectionYesFeature.Attribute.Name.InspectionComments27-04-2021
Inspection ID
The identification number for the individual instance of inspection.
Text
Max Length: 50
EA7P15 InspectionYesFeature.Attribute.Name.InspectionID27-04-2021
Inspection Type
The type of inspection to be conducted.
Picklist
Ad Hoc Culvert Internal Inspection Ad Hoc EIC Inspection Ad Hoc PSRA Land Water Ad Hoc PSRA Tree Ad Hoc Visual Asset Inspection Culvert Internal Inspection EIC Inspection MEICA site safety and operation inspection MRM Inspection PSRA Assessment PSRA Land Water PSRA Tree PSRA Tree Assessment PUWER Inspection Section 10 Reservoir Inspection Section 12 Reservoir Inspection Site Inspection - 6 month Transition Inspection Visual Asset Inspection
EA7P15 InspectionNoFeature.Attribute.Name.InspectionType27-04-2021
Inspection Unit (EIC)
The inspection unit of inspection to be conducted by the Engineering Inspection Coordinator. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitEIC27-04-2021
Inspection Unit (PUWER)
The inspecton unit reference number for Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitPUWER27-04-2021
Inspection Unit (Visual)
The inspecton unit reference for visual inspection. Populated via a picklist in AIMS OM.
Text
Max Length: 100
EA7P15 InspectionNoFeature.Attribute.Name.InspectionUnitVisual27-04-2021
Inspector
The name of the Asset Inspector who is conductng the inspection. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P15 InspectionNoFeature.Attribute.Name.InspectionID27-04-2021
Interested Party
The details for any parties that have a particular interest in the asset.
Set of linked fields for each interested party:
Party Type (Individial, Organisation), Party, Preferred Contact Method (Email, In Person, Mail, Phone, Text), Address, Post Code, Phone Number 1, Phone Number 2, Fax Number, E-Mail, Consent Obtained, Landowner?
LinkEA7P02 ComplianceNoFeature.Attribute.Name.InterestedParty27-04-2021
Internal Drainage Board (IDB)
The Internal Drainage Board within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 100
AutoP02 ComplianceNoFeature.Attribute.Name.InternalDrainageBoardIDB27-04-2021
Key / Access Card Details
Details of the key or access card that is required to gain entry. Applicable where Key / Access Card Required = Yes
Text
Max Length: 100
EA7P02 ComplianceNoFeature.Attribute.Name.KeyAccessCardDetails27-04-2021
Key / Access Card Required?
Is a key or access card required to gain entry?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.KeyAccessCardRequired27-04-2021
Key Photo
Is the photograph the key photo for the asset? (Only applicable when Photo attribute is populated)
BooleanEA4P09 OperationsYesFeature.Attribute.Name.KeyPhoto17-05-2021
KPI881 - Inspections - FCRM 2.3
Is the asset included in the KPI881 (Inspections) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI881Inspections27-04-2021
KPI885 - Public Safety Sites
Is the asset included in the KPI885 (Public safety sites) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI885PublicSafetySites27-04-2021
KPI962 - Maintaining above required condition - FCRM 1.3
Is the asset included in the KPI962 (Maintaining above required condition) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI962Maintainingaboverequiredcondition27-04-2021
KPI965 - Conveyance - FCRM 2.8
Is the asset included in the KPI965 (Conveyance) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI965Conveyance27-04-2021
KPI965 - Households at risk - FCRM 2.5
Is the asset included in the KPI965 (Households at risk) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI965Householdsatrisk27-04-2021
KPI970 - Performance vs Engineering deadline - FCRM 2.6
Is the asset included in the KPI970 (Performance vs engineering deadline) report?
BooleanEA7P02 ComplianceYesFeature.Attribute.Name.KPI970PerformancevsEngineeringdeadline27-04-2021
Labour Cost
Sum of Labour costs for current financial year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P08 ImpactsNoFeature.Attribute.Name.LabourCost27-04-2021
Labour Hours
Number of hours worked this financial year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: hours
EA7P10 MaintenanceNoFeature.Attribute.Name.LabourHours27-04-2021
Landowner Contact Required
Is contact with the landowner needed in order to gain entry?
Picklist
Yes No
EA7P02 ComplianceNoFeature.Attribute.Name.LandownerContactRequired27-04-2021
Last Routine Inspection
The AIMS OM reference (GUID) of the last recorded routine inspection.
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.LastRoutineInspection27-04-2021
Last Visual Inspection
The AIMS OM reference (GUID) of the last recorded visual inspection.
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.LastVisualInspection27-04-2021
Last Visual Inspection Comments
Comments on the last visual inspection
Text
Max Length: 500
EA7P15 InspectionNoFeature.Attribute.Name.LastVisualInspectionComments27-04-2021
Latitude
The latitude of the asset's geographic location
Number
Max: 56.000000
Min: 49.000000
Number of decimal places: 6
Units: degrees
AutoP09 OperationsYesFeature.Attribute.Name.Latitude27-04-2021
Legacy CMMS ID
The element's ID from the legacy CMMS system. Applicable where asset has MEICA maintained elements.
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.LegacyCMMSID27-04-2021
Legacy MEICA Site / Asset Name
The element's legacy MEICA site or asset name. Applicable where asset has MEICA maintained elements.
Text
Max Length: 100
AutoP09 OperationsNoFeature.Attribute.Name.LegacyMEICASiteAssetName27-04-2021
Likelihood of Failure
What is the likelihood of failure of the asset?
Picklist
Failure imminent - 50% chance within 12 months Likely - 20% chance within 24 months Possible - 5% chance within 24 months Unlikely - 0.5% chance within 60 months
EA7P09 OperationsNoFeature.Attribute.Name.LikelihoodOfFailure27-04-2021
Linear Asset Length
The length of the asset (calculated from its geometry)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
AutoP09 OperationsYesFeature.Attribute.Name.LinearAssetLength05-09-2022
LineString Type
The type of the Control LineString
Picklist
Axial Crest Invert
EA2P08 ImpactsNoFeature.Attribute.Name.LineStringType27-04-2021
Listed Structure
Is the Asset a listed structure?
BooleanEA3P09 OperationsYesFeature.Attribute.Name.ListedStructure27-04-2021
Local Authority
The local authority within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.LocalAuthority27-04-2021
Location
The location of the asset, for example: nearest town and/or distance downstream of named bridge
Text
Max Length: 400
EA2P09 OperationsNoFeature.Attribute.Name.Location27-04-2021
Longitude
The longitude of the asset's geographic location
Number
Max: 2.000000
Min: -7.000000
Number of decimal places: 6
Units: degrees
AutoP09 OperationsYesFeature.Attribute.Name.Longitude27-04-2021
Maintainer
The organisation or private individual recognised to be the maintainer of the asset. The maintainer is the organisation or person who manages, and provides for, the maintenance of the asset but they may instruct others to carry out works on their behalf. This information is not mandatory if the asset is not maintained. This is a mandatory field where Not Maintained = No
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsNoFeature.Attribute.Name.Maintainer05-09-2022
Maintainer Function
Department within Maintaining Organisation
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA7P09 OperationsNoFeature.Attribute.Name.MaintainerFunction27-04-2021
Maintenance Regime Used
What maintenance regime has been used for the works to repair the asset? Only available if Below Required Condition = Yes
Picklist
High Medium Basic
EA7P10 MaintenanceNoFeature.Attribute.Name.MaintenanceRegimeUsed04-05-2021
Materials Cost
Sum of Material Costs for current financial year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P08 ImpactsNoFeature.Attribute.Name.MaterialsCost27-04-2021
Measuring Flume Type
The type of Flume. Applicable where Weir Type = Flume
Picklist
Rectangular Flume Trapezoidal Flume U-Throated Flume
EA3P09 OperationsNoFeature.Attribute.Name.MeasuringFlumeType27-04-2021
Mechanical Weir Type
The type of Mechanical Weir. Applicable where Weir Type = Mechanical
Picklist
Large Radial Small Radial Vertical Penstock
EA3P09 OperationsNoFeature.Attribute.Name.MechanicalWeirType27-04-2021
MEICA Condition Target
A target value for the Factored Availability of an asset, based upon the FRMS Consequence. Only applicable when MEICA Elements Present = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.MEICAConditionTarget27-04-2021
MEICA Element Failed
Applicable where MEICA Elements Present = True. Have any of the MEICA elements failed?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.MEICAElementFailed27-04-2021
MEICA Elements Present
Are MEICA elements present on the asset? Attribute automatically populated based on whether the asset has any elements which are set as MEICA Maintained Elements.
BooleanAutoP09 OperationsYesFeature.Attribute.Name.MEICAElementsPresent05-09-2022
MEICA Supra-Area
The MEICA Supra-Area covering the asset
Picklist
Anglian KSL & HNL Midlands North East North West South West SSD & WT
EA7P09 OperationsNoFeature.Attribute.Name.MEICASupraArea27-04-2021
MEICA Team Email Address
The email address of the MEICA team covering the asset
Text
Max Length: 80
EA7P09 OperationsNoFeature.Attribute.Name.MEICATeamEmailAddress27-04-2021
Mitigation Measures
What (if any) mitigation measures have been put in place until the asset can be permanently repaired? Only available if Below Required Condition = Yes
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.MitigationMeasures04-05-2021
Mitigation Measures in Place
Are mitigation measures in place? Only available if Below Required Condition = Yes
Picklist
Yes No NA
EA7P09 OperationsNoFeature.Attribute.Name.MitigationMeasuresinPlace04-05-2021
Modelled Total EAD
Modelled total Estimated Annual Damage. Only available if Below Required Condition = Yes
Number
Max: 999,999
Min: 0
Number of decimal places: 0
Units: pounds
EA7P09 OperationsNoFeature.Attribute.Name.ModelledTotalEAD04-05-2021
Monitoring Purpose
The purpose for the monitoring
Picklist
Coastal Forecasting Debris Flow Level Tidal Machine Condition Machine Operation Precipitation Security Subsidence / Settlement Water Abstraction Monitoring Water Level Water Quality
EA7P09 OperationsNoFeature.Attribute.Name.MonitoringPurpose27-04-2021

Picklist edited 05-09-2022

MP Constituency
The parliamentary constituency within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 300
AutoP09 OperationsNoFeature.Attribute.Name.MPConstituency27-04-2021
Natural / Engineered Asset
Is this a naturally occurring asset?
Picklist
Engineered Natural
EA2P09 OperationsYesFeature.Attribute.Name.NaturalEngineeredAsset27-04-2021
NGR
National Grid Reference. Will be populated by a spatial lookup
Text
Max Length: 12
AutoP09 OperationsNoFeature.Attribute.Name.NGR27-04-2021
No of Incoming Pipes
The number of incoming culverts/pipes in the chamber
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NoOfIncomingPipes27-04-2021
No of Outgoing Pipes
The number of outgoing culverts/pipes in the chamber
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NoOfOutgoingPipes27-04-2021
Northing
The northing of the asset's geographic location (British National Grid)
Number
Max: 700,000.00
Min: 0.00
Number of decimal places: 2
Units: metres
EA7P09 OperationsYesFeature.Attribute.Name.Northing27-04-2021
Number of Landings
The number of landings in the chamber
Number
Max: 10
Min: 0
Number of decimal places: 0
EA3P09 OperationsNoFeature.Attribute.Name.NumberOfLandings27-04-2021
Number of Residential Properties at Risk
The number of residential properties at risk should the asset completely fail. Only available if Below Required Condition = Yes
Number
Max: 999,999
Min: 0
Number of decimal places: 0
EA7P02 ComplianceNoFeature.Attribute.Name.NumberofResidentialPropertiesAtRisk04-05-2021
Number of Residential Properties at Risk Override
Manually entered number of residential properties at risk. Only available if Below Required Condition = Yes
Number
Max: 999,999
Min: 0
Number of decimal places: 0
EA7P02 ComplianceNoFeature.Attribute.Name.NumberofResidentialPropertiesAtRiskOverride04-05-2021
Operational Area
The asset's Operational Area. Only applicable when one of the asset's purposes is Flood Risk Management.
Picklist
NE - CMBLNC - FCRM OPS North NE - CMBLNC - FCRM OPS South NE - DBNTLS - FCRM OPS North NE - DBNTLS - FCRM OPS South NE - LCNNTH - FCRM OPS Lincs NE - LCNNTH - FCRM OPS W&N NE - NHUDUT - FCRM OPS NE - YORKS - FCRM OPS N&EY NE - YORKS - FCRM OPS W&SY SE - CAMBED - FCRM OPS SE - ESNFSF - FCRM OPS Essex SE - ESNFSF - FCRM OPS N&S SE - HTSNLN - FCRM OPS East SE - HTSNLN - FCRM OPS West SE - KNTSLN - FCRM OPS East Kent SE - KNTSLN - FCRM OPS SLN & WK SE - KNTSLN - FCRM TTD SE - SLTSDN - FCRM OPS East SE - SLTSDN - FCRM OPS West SE - WTHMS - FCRM OPS Lower SE - WTHMS - FCRM OPS Upper W - DVNCWL - FCRM OPS Devon & Cornwall - FCRM Ops W - GMMYCH - FCRM OPS W - SHHRWG - FCRM OPS W - STWKWM - FCRM OPS W - WESSEX - FCRM OPS E W - WESSEX - FCRM OPS W
EA7P09 OperationsNoFeature.Attribute.Name.OperationalArea27-04-2021
Operator
The organisation or private individual recognised to be the operator of the asset
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsYesFeature.Attribute.Name.Operator27-04-2021

Picklist edited 05-09-2022

Operator Function
Department of Operator
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA7P09 OperationsNoFeature.Attribute.Name.OperatorFunction27-04-2021
Other Costs
Sum of Other Costs for Financial Year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA7P08 ImpactsNoFeature.Attribute.Name.OtherCosts27-04-2021
Overridden Equivalent
A manually entered value for House Equivalent. Only applicable when MEICA Elements Present = True and Override = True
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P09 OperationsNoFeature.Attribute.Name.OverriddenEquivalent27-04-2021
Overridden Equivalent Asset Availability
A manually entered value for Asset Factored Availability, to be used instead of the default calculation. Only applicable when MEICA Elements Present = True and Asset Availability Override = True
Number
Max: 1.0000
Min: 0.0000
Number of decimal places: 4
EA7P09 OperationsNoFeature.Attribute.Name.OverriddenEquivalentAssetAvailability27-04-2021
Override
An indication of the use of a manually entered value for House Equivalent, instead of the value calculated by default from the FRMS. Only applicable when MEICA Elements Present = True
BooleanEA7P09 OperationsYesFeature.Attribute.Name.Override27-04-2021
Override Calculated Condition
Has the calculated condition of the asset been overridden?
BooleanEA7P15 InspectionYesFeature.Attribute.Name.OverrideCalculatedCondition27-04-2021
Override Condition
New condition of the asset after the override. Only applies when Override Calculated Condition = True
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.OverrideCondition27-04-2021
Override Reason
Why was the overall condition of the asset overridden? Only applies when Override Calculated Condition = True
Text
Max Length: 200
EA7P15 InspectionNoFeature.Attribute.Name.OverrideReason27-04-2021
Owner
The organisation or private individual known to be the owner of the asset
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsYesFeature.Attribute.Name.Owner27-04-2021

Picklist edited 05-09-2022

Owner Function
The Department within the Organisation with Owner responsibility
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.OwnerFunction27-04-2021
Parish Council
The parish council within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 200
AutoP09 OperationsNoFeature.Attribute.Name.ParishCouncil27-04-2021
Permit to Work Required
Is a permit to work required to work on the asset?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.PermitToWorkRequired27-04-2021
Photo
A photograph or image related to the asset.
Metadata for this photograph should be recorded in the following attributes: Date (Photo), Key Photo, Description (Photo), Filename (Photo), Version (Photo)
PhotoEA4P09 OperationsNoFeature.Attribute.Name.Photo27-04-2021
Plant Cost
Sum of Plant cost for current financial year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA6P08 ImpactsNoFeature.Attribute.Name.PlantCost27-04-2021
Post Code
The postcode within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 15
AutoP09 OperationsNoFeature.Attribute.Name.PostCode27-04-2021
Post Inspection Action
The action required to bring the Asset back to or better than required condition. Only available if Below Required Condition = Yes
Picklist
Element Not Inspect Quick Fix Significant Fix
EA7P15 InspectionNoFeature.Attribute.Name.PostInspectionAction04-05-2021
Post Inspection Process Action
The ID (GUID) of the action required to bring the Asset back to or better than required condition. Only available if Below Required Condition = Yes
Text
Max Length: 32
EA7P15 InspectionNoFeature.Attribute.Name.PostInspectionProcessAction04-05-2021
Previous Condition
The previous condition of the Asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P15 InspectionNoFeature.Attribute.Name.PreviousCondition27-04-2021
Primary Constraint to Carrying out Work
What is the main reason that is preventing the immediate commencement of the repair works? Only available if Below Required Condition = Yes
Picklist
Access Issues Contribution Required Environmental Constraints Landowner Issues Protected Species Uneconomic to Repair None Other
EA7P08 ImpactsNoFeature.Attribute.Name.PrimaryConstraintToCarryingOutWork04-05-2021
Primary Purpose
The main purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose)
Picklist
Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources
EA2P09 OperationsYesFeature.Attribute.Name.PrimaryPurpose27-04-2021

Picklist edited 14-06-2021

Primary Reason Asset is BRC
What is the primary reason for the asset falling below required condition? Only available if Below Required Condition = Yes
Picklist
Animal Burrowing Backfill Washout Cracking or Fissuring Crest Height Degradation Leaking and Piping Material Degradation Poor Grass Cover Slope Instability Structural Instability Undermining or Scour
EA7P09 OperationsNoFeature.Attribute.Name.PrimaryReasonAssetisBRC04-05-2021
Probability of Failure
What is the probability of failure of the asset in its current condition? Only available if Below Required Condition = Yes
Text
Max Length: 50
EA7P03 Risk managementNoFeature.Attribute.Name.ProbabilityOfFailure04-05-2021
Proposed Funding Programme
What is the proposed method to fund the repair works? Only available if Below Required Condition = Yes
Picklist
Scheduled Maintenance - Frequent Scheduled Maintenance - Intermittent Capital - Defence Capital - Maintenance Capital - Recondition Unscheduled Maintenance - Reactive N/A
EA7P03 Risk managementNoFeature.Attribute.Name.ProposedFundingProgramme04-05-2021
Protection Type
The type of protection the asset gives. Mandatory when any Purpose = Flood Risk Management
Picklist
Coastal Fluvial Fluvial/Tidal Surface Water Tidal
EA3P09 OperationsNoFeature.Attribute.Name.ProtectionType27-04-2021
PSRA System ID
The ID (GUID) of the PSRA System Asset that the Asset is related to
Text
Max Length: 32
EA6P03 Risk managementNoFeature.Attribute.Name.PSRASystemID27-04-2021
PUWER?
Do any of the elements of this asset require PUWER inspections? Only applicable when MEICA Elements Present = True
BooleanEA7P03 Risk managementYesFeature.Attribute.Name.PUWER27-04-2021
RAFT Additional Number of Properties at Risk Per Year
The additional number of properties at risk, including house equivalents, populated from the RAFT Output section. Only available if Below Required Condition = Yes
Number
Max: 999,999.00
Min: 0.00
Number of decimal places: 2
EA7P03 Risk managementNoFeature.Attribute.Name.RAFTAdditionalNumberofPropertiesAtRiskPerYear04-05-2021
RAFT Assessment
Details and the outcomes of the RAFT assessment conducted on the BRC Asset. Only available if Below Required Condition = Yes
Text
Max Length: 500
EA7P03 Risk managementNoFeature.Attribute.Name.RAFTAssessment04-05-2021
Raw Condition
The Granular Weighted Asset Condition
Number
Max: 99,999.00
Min: 0.00
Number of decimal places: 2
EA7P15 InspectionNoFeature.Attribute.Name.RawCondition27-04-2021
Reason for Choosing Rate and Regime
What is the main reason for choosing this regime? Only available if Below Required Condition = Yes
Text
Max Length: 500
EA7P03 Risk managementNoFeature.Attribute.Name.ReasonForChoosingRateAndRegime04-05-2021
Reason for Selection
Applicable where Candidate for Discontinuation = True. The reason why the asset has been selected for Discontinuation
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.ReasonforSelection27-04-2021
Reference (Document)
A reference for the document (see File (Document) attribute)
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.ReferenceDocument27-04-2021
Regional Flood & Coastal Committee (RFCC)
The Regional Flood & Coastal Committee within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.RegionalFloodCoastalCommitteeRFCC27-04-2021
Related Event Reference
The reference of the event related to the inspection. This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA7P09 OperationsNoFeature.Attribute.Name.RelatedEventReference27-04-2021
Repair Deadline Date
The most likely date that the asset will be repaired to target condition. Only available if Below Required Condition = Yes
DateEA7P10 MaintenanceNoFeature.Attribute.Name.RepairDeadlineDate04-05-2021
Repair Deadline Duration
The estimated time it will take to repair the asset in months. Only available if Below Required Condition = Yes
Number
Max: 120
Min: 0
Number of decimal places: 0
Units: months
EA7P10 MaintenanceNoFeature.Attribute.Name.RepairDeadlineDuration04-05-2021
Replacement Cost
How much would the Asset cost to completely replace?
Number
Max: 9,999,999,999.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA6P08 ImpactsNoFeature.Attribute.Name.ReplacementCost27-04-2021
Replacement Cost Assessment Date
The date the replacement cost of the asset was assessed
DateEA6P08 ImpactsNoFeature.Attribute.Name.ReplacementCostDate27-04-2021
Requirements
Are there any further requirements of the asset? Can select multiple options
Picklist
Abstraction FCRM Critical Hydropower Operational Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.Requirements27-04-2021
Requirements Notes
Notes about the further requirements
Text
Max Length: 500
EA7P09 OperationsNoFeature.Attribute.Name.RequirementsNotes27-04-2021
Residual Life
The estimated residual life of the asset
Number
Max: 100
Min: 0
Number of decimal places: 0
Units: years
EA6P09 OperationsNoFeature.Attribute.Name.ResidualLife27-04-2021
Residual Life Date
The date the residual life was assessed
DateEA6P09 OperationsNoFeature.Attribute.Name.ResidualLifeDate27-04-2021
Responsibility Split - Organisation
An organisation that has shared responsibility for the asset. Multiple options can be made
Picklist
Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitOrganisation27-04-2021

Picklist edited 05-09-2022

Responsibility Split - Organisation Function
The department within the organisation with shared responsibility
Picklist
Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitOrganisationFunction27-04-2021
Responsibility Split - Percentage Split
The percentage of the organisation's responsibility for the asset. All values must total 100%
Number
Max: 99
Min: 0
Number of decimal places: 0
Units: %
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibilitySplitPercentageSplit27-04-2021
Responsible Officer
Who is the Responsible Officer of the Asset? This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.ResponsibleOfficer27-04-2021
Restriction Description
A description of the restriction
Text
Max Length: 500
EA6P09 OperationsNoFeature.Attribute.Name.RestrictionDescription27-04-2021
Restriction Reference
The reference of the restriction
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.RestrictionReference27-04-2021
Restriction Summary
A brief description of any restriction to work to be carried out
Text
Max Length: 1000
EA6P09 OperationsNoFeature.Attribute.Name.RestrictionSummary27-04-2021
Schedule Date
The scheduled date of the inspection or assessment.
DateEA6P15 InspectionYesFeature.Attribute.Name.ScheduleDate27-04-2021
SIA Contingency Document Link
The link to the SIA contingency document. Applicable only where FCRM Strategically Important Asset (SIA) = True and SIA Contingency Plans in Place = True
LinkEA7P08 ImpactsNoFeature.Attribute.Name.SIAContingencyDocumentLink27-04-2021
SIA Contingency Plans in Place
Are SIA contingency plans in place? Applicable only where FCRM Strategically Important Asset (SIA) = True
BooleanEA7P08 ImpactsYesFeature.Attribute.Name.SIAContingencyPlansinDocument27-04-2021
SIA Reason for Submission
The reason for the SIA submission. Mandatory where FCRM Strategically Important Asset (SIA) = True
Text
Max Length: 2000
EA7P08 ImpactsNoFeature.Attribute.Name.SIAReasonforSubmission27-04-2021
Site Liaison Officer
Who is the Site Liaison Officer of the Asset? This is populated via a picklist in AIMS OM.
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.SiteLiaisonOfficer27-04-2021
Site Priority
The priority of the Asset. Only applicable when MEICA Elements Present = True
Picklist
High Medium Low
EA6P09 OperationsNoFeature.Attribute.Name.SitePriority27-04-2021
SOP Code
The SOP code of the Capital project to which the works are linked. Only available if Below Required Condition = Yes
Text
Max Length: 50
EA2P13 Project managementNoFeature.Attribute.Name.SOPCode04-05-2021
Spatial Quality
The data quality flag for the spatial position of the asset
Picklist
1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked
EA7P09 OperationsNoFeature.Attribute.Name.SpatialQuality27-04-2021
Target Condition
The target condition of the Asset
Picklist
0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor
EA7P09 OperationsNoFeature.Attribute.Name.TargetCondition27-04-2021
Total Cost
Sum of Actual Costs for Financial Year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: pounds
EA6P08 ImpactsNoFeature.Attribute.Name.TotalCost27-04-2021
Travel Hours
Total travel hours for current financial year (calculated using automated functions)
Number
Max: 100,000.00
Min: 0.00
Number of decimal places: 2
Units: hours
EA7P08 ImpactsNoFeature.Attribute.Name.TravelHours27-04-2021
Unknown or Not Maintained
Is the asset not maintained?
BooleanEA7P09 OperationsYesFeature.Attribute.Name.UnknownorNotMaintained27-04-2021
Version (Document)
The version number of the document (see File (Document) attribute)
Text
Max Length: 5
EA7P09 OperationsNoFeature.Attribute.Name.VersionDocument27-04-2021
Version (Photo)
The version number of the photograph or image (see Photo attribute)
Text
Max Length: 5
EA4P09 OperationsNoFeature.Attribute.Name.VersionPhoto27-04-2021
Warranty
What is the span of the warranty of the asset?
Number
Max: 3,000
Min: 0
Number of decimal places: 0
Units: months
EA4P09 OperationsNoFeature.Attribute.Name.Warranty27-04-2021
Warranty Expiry Date
When will the warranty of the asset expire?
DateEA4P09 OperationsNoFeature.Attribute.Name.WarrantyExpiryDate27-04-2021
Water Course Details Set By User
Were the Watercourse details set by the user?
BooleanEA6P15 InspectionYesFeature.Attribute.Name.WaterCourseDetailsSetByUser27-04-2021
Water Course GML ID
The GML ID of the Watercourse where the Asset is located
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.WaterCourseGMLID27-04-2021
Water Course Valid From
The date that the watercourse was recorded, established, constructed or classified as main river
Text
Max Length: 50
EA6P09 OperationsNoFeature.Attribute.Name.WaterCourseValidFrom27-04-2021
Watercourse Alt Name
An alternative name of the Watercourse where the Asset is located
Text
Max Length: 200
EA2P09 OperationsNoFeature.Attribute.Name.WatercourseAltName27-04-2021
Watercourse Name
The name of the Watercourse where the Asset is located
Text
Max Length: 200
EA2P09 OperationsNoFeature.Attribute.Name.WatercourseName27-04-2021
Weir Type
The type of Weir
Picklist
Broad crested weir Compound broad-crested weir Compound crump weir Crump profile single-crest weir Electromagnetic gauging station Essex Weir in a trapezoidal channel Fixed Flat V triangular profile Flume Manual Mechanical Rectangular thin-plate weir Triangular (V Notch) thin-plate weir Ultrasonic gauging station Velocity-area gauging station
EA3P09 OperationsYesFeature.Attribute.Name.WeirType27-04-2021
WFD Waterbody ID
The ID of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.WFDWaterbodyID27-04-2021
WFD Waterbody Name
The name of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup
Text
Max Length: 50
AutoP09 OperationsNoFeature.Attribute.Name.WFDWaterbodyName27-04-2021
Work Type
The type of work that is required.
Picklist
Ad Hoc Inspection Capital Defence Capital Recondition Capital Maintenance Post Incident Inspection Post Remedial Work Inspection Scheduled Inspection Scheduled Maintenance - Frequent Scheduled Maintenance - Intermittent Unscheduled Maintenance - Reactive
EA7P15 InspectionNoFeature.Attribute.Name.WorkType27-04-2021
Year Last Refurbished
The year the asset was last refurbished
Number
Max: 2,999
Min: 1,900
Number of decimal places: 0
EA6P09 OperationsNoFeature.Attribute.Name.YearLastRefurbished27-04-2021
Year of Manufacture
The year that the asset was manufactured
Number
Max: 2,099
Min: 1,800
Number of decimal places: 0
EA4P09 OperationsNoFeature.Attribute.Name.YearOfManufacture27-04-2021