Monitoring Building
Buildings and Compounds
A building designed and/or used for the housing of apparatus, equipment and fixtures for the purpose of monitoring the environment, e.g. boreholes (quantity/quality), weather and climate.
Does not include Gauging Stations that monitor river level and flow.
Includes the structural components of the building and any integral fixtures, fittings or services that cannot be removed without cutting into the walls, ceilings or floors.
Does not include any assets or equipment that are housed or used in the building but separate to the building structure itself.
Buildings can have a multitude of uses so could fit into multiple asset types. Classify according to the predominant, or most important function.
Monitoring Buildings are displayed in the Environment Agency's AIMS OM system as a point at the centre of the structure.
Links to Environment Agency Smart Objects (login required - request access here)
Monitoring Building
Elements
An Element Type is a component part of an Asset Type. Each Asset Type (except Asset Complex assets) will comprise of a prescribed set of Element Types. Some Element Types are essential and must be present to define an asset of that Asset Type. Other Element Types are optional, to be included when needed to define a particular Asset Type instance. An individual asset may have more than one instance of each Element Type.
This table lists the Element Types applicable to this Asset Type.
Element Type | Description | Element Code | Essential | Uniclass 2015 | Updates |
---|---|---|---|---|---|
Access Strip | A strip of land that is used for access to an asset for operational or maintenance purposes. | ASP | No | SL_32_35_02 | 11-04-2023 |
Alternator | An electrical generator that converts mechanical energy to electrical energy in the form of alternating current. | ALT | No | Pr_60_70_65_03 | 11-04-2023 |
Cable and Pipe Management | Routing and protection of a range of different cables and pipes belonging to an asset. Examples could be above or below ground ducting, trunking, conduit. This is not the cable or pipes themselves. | CMG | No | En_90_90_80 | 11-04-2023 |
Ceiling | The overhead interior surface of a room. | CLG | No | Ss_30_25 | 11-04-2023 |
Civils | Any additional construction at an asset site not included in one of the defined elements. | CVL | No | Pr_20_85_13 | 11-04-2023 |
Climate Control | A system of connected components (such as an air conditioning system) which regulate temperature in a confined space like a building. | CCL | No | Ss_65_80_45 | 11-04-2023 |
Datum Plates and Markers | A temporary or permanent fixing which a point of known elevation marked for the purpose of surveying. Only Datum Plates and Markers that are maintained by the Environment Agency or are of benefit to the Environment Agency should be recorded. | DTM | No | Pr_40_10_77_20 | 11-04-2023 |
Distribution Board | A component of an electricity supply system that divides an electrical power feed into subsidiary circuits, while providing a protective fuse or circuit breaker for each circuit in a common enclosure. | DBD | No | Pr_60_70_22_22 | 11-04-2023 |
Distribution Network Operator Feeder | A component of an electrical supply that takes the feed of electricity into the distribution board. These are commonly owned by the network operator. | DFD | No | Pr_60_70_22_11 | 11-04-2023 |
Doors and Windows | The doors and windows of a building. | DAW | Yes | EF_25_30 | 11-04-2023 |
Drainage System | A system of pipes, drains and fixtures which collect, store, treat or remove foul water and surface water from a building, facility or outdoor space. | DSY | No | En_50_30 | 11-04-2023 |
Electrical System | A system of electrical components used to supply and distribute electricity to the devices which consume it, either within a building or other asset. This will include items such as protective devices, cables, switches, isolators, circuit breakers where not part of designated distribution board element. An Electrical System will normally have the requirement of an Electrical Installation Condition Report (EICR), even where a distribution board, meter or feeder are identified as separate elements. | ESY | No | Ss_70 | 21-08-2023 |
Electricity Meter | A device installed on an asset with an electricity supply to record the amount of electricity used. This can automatically send readings to a host system for monitoring purposes. | EMT | No | Ss_75_70_54_25 | 11-04-2023 |
Electricity Sub Meter | A smaller device installed on an asset with an electricity supply to record the amount of electricity used. This will not feed back readings to a host system but can be read manually to record the electrical usage of an asset that has multiple electrical elements or an asset complex. | ESM | No | Ss_75_70_54_25 | 11-04-2023 |
Equipment Mounting Board | A board that is fixed in place and used to support equipment. | EMB | No | Pr_25_71_63_60 | 11-04-2023 |
Excavated Ground | The ground that is excavated during the construction of the asset. Note that this Element is not recorded in AIMS OM. | EXG | No | SL_90_30_25 | 11-04-2023 |
External Features | Other integral external features of buildings not covered by other elements of buildings, e.g. cladding, soffits, fascia boards, lead flashing. | EFS | No | Pr_25_93_72 | 11-04-2023 |
External Walls | The outside walls that comprise a building. The External Walls element includes all sections of the outside wall, as defined by the Building (Amendment) Regulations 2018. | EXW | Yes | EF_25_10 | 18-04-2024 |
Fastenings | Devices that secure items together such as brackets, hinges or locking mechanisms. | FAS | No | Pr_20_29 | 11-04-2023 |
Fire Protection | Any fire protection systems or equipment in a building, e.g. fire alarms, sprinkler systems. | FTN | No | Ss_75_50_28_29 | 11-04-2023 |
Fixed Fall Arrest System | A system installed for the safety of operatives when working from heights to ensure they are not able to fall. | FFA | No | Ss_80_30_25_80 | 11-04-2023 |
Fixings | Devices to attach a measure or other device to a post or structure. | FIX | No | Pr_20_29 | 11-04-2023 |
Floor | The bottom horizontal surface of each storey inside a building. | FLR | No | EF_30_20 | 11-04-2023 |
Foundation | The lowest load-bearing part of a building, typically below ground level. | FDN | No | EF_20_05_30 | 11-04-2023 |
Frame | A rigid structure that surrounds or supports something. | FRM | No | Ss_20_10 | 11-04-2023 |
Fuel Cell | An electrochemical cell that converts the chemical energy of a fuel (often hydrogen) and an oxidising agent (often oxygen) into electricity. | FCL | No | Pr_60_70_65_30 | 11-04-2023 |
Gas System | A system of pipes and equipment which distribute a gas supply around a building. | GAS | No | Ss_55_20_34_57 | 11-04-2023 |
Grassed Elements | Grassed areas within the boundary of an asset or group of assets. | GRS | No | EF_45_20 | 11-04-2023 |
Habitat Enhancement | An area or feature of improved habitat for a species (e.g. water voles, bats, fish, birds) within the boundary of an asset or group of assets. | HBE | No | Ss_45_35_08_37 | 11-04-2023 |
Heating System | A system of connected components which heat a confined space like a building. | HTG | No | Ss_60_40_37 | 11-04-2023 |
Hydro Turbine | A machine for converting the energy of flowing water into useful power. A modern equivalent of the water wheel. | HYT | No | Pr_60_70_65_39 | 11-04-2023 |
Incomer | The electricity feed into the main switchboard of a building or other asset. | INC | No | Ss_70_30_45_40 | 11-04-2023 |
Internal Features | Other integral internal features of buildings not covered by other elements of buildings, e.g. internal doors, integrated storage, sanitaryware. | IFS | No | Pr_40 | 11-04-2023 |
Internal Walls | The walls inside a building or structure. The Internal Walls element does not include any part of the outside wall, as this is included as part of the External Wall element as defined by the Building (Amendment) Regulations 2018. | IWL | No | Ss_25_13_50_56 | 18-04-2024 |
Ladder | A ladder that is fixed in place or designed for a particular location to enable access to and egress from part of an asset or group of assets. Includes step irons. | LAD | No | Pr_25_30_85_02 | 11-04-2023 |
Lighting | Equipment to illuminate an asset or area. | LTG | No | Ss_70_80_25 | 11-04-2023 |
Maintenance Hole | A point of access into culverts for inspections. Also known as a manhole. | MHL | No | Pr_65_52_01_50 | 11-04-2023 |
Padlock or Lock | A mechanism for securing an opening. | PAD | No | Pr_30_36_08_62 | 11-04-2023 |
Planted Elements | Areas of planting within the boundary of an asset or group of assets. | PLT | No | EF_45_90 | 11-04-2023 |
Roller Shutters | A door consisting of horizontal slats that is raised to open or lowered to close. | RSH | No | Pr_30_59_84_73 | 11-04-2023 |
Roof | The uppermost outward covering of a building or structure. | ROF | Yes | EF_30_10 | 11-04-2023 |
Security Camera | A security camera on a building to identify criminal activity or intrusion. | SCM | No | Pr_60_75_86 | 11-04-2023 |
Sewage Treatment System | A complex used to treat human sewage or waste water. | STS | No | En_50_75 | 11-04-2023 |
Sinks | An item of sanitaryware for handwashing or dishwashing. Pipework associated with a sink should be recorded as Water Supply Plumbing System element or Drainage System element as applicable. One element should be used to record all sinks at the asset. | SNK | No | Pr_40_20_96 | 18-12-2023 |
Solar Panel | A device which converts the sun's energy into electrical power. It could be directly powering a building or asset, or part of a solar farm which supplies energy to the National Grid. | SLP | No | Ss_70_10_70_85 | 11-04-2023 |
Structural Beam | A horizontal structural element that is used for bearing loads. Could be used as a foundation or as a support for a roof or floor. | BEA | No | Pr_20_85_08 | 21-08-2023 |
Substructure | The parts of a structure or building that transfer the load of the structure to the ground, but excluding the foundations. For example a basement excavation and basement walls. | SST | No | Ss_20_05 | 11-04-2023 |
Transformer | A passive electrical device used to transfer power between different circuits. | TRN | No | Pr_60_70_36 | 11-04-2023 |
Treads and Risers | The alternating horizontal (treads) and vertical (risers) elements that make up a set of steps. The Treads and Risers element should be used where steps provide access to a structure, instrument, building, etc. | TRR | No | Pr_25_30_90 | 21-08-2023 |
Uninterruptible Power Supply | An electrical apparatus that provides emergency power to a load when the input power source or mains power fails. A UPS differs from an auxiliary or emergency power system or standby generator in that it will provide near-instantaneous protection from input power interruptions, by supplying energy stored in batteries, supercapacitors, or flywheels. The on-battery run-time of most uninterruptible power sources is relatively short but sufficient to start a standby power source or properly shut down the protected equipment. It is a type of continual power system. | UPS | No | Pr_60_70_64_93 | 11-04-2023 |
Ventilation System | A system of connected devices that control airflow within confined spaces such as buildings. Its main function is to introduce a supply of fresh air, usually from the outside, while channelling stale air back out. | VEN | No | En_65_40 | 11-04-2023 |
Waste Disposal System | A waste water disposal point in a building or structure, leading to a foul sewer. | WDL | No | En_50 | 11-04-2023 |
Water Supply Plumbing System | A system of pipes and equipment which distribute clean water around a building. | WSP | No | Ss_55_70_38 | 11-04-2023 |
Attributes
An attribute is a particular piece of data that describes a property of an object. Each Asset Type is described by a different set of attributes, although there are some attributes that are common to many Asset Types.
The table below lists the attributes that are applicable to this Asset Type, along with the data profile requirements for each attribute and details of when and how each should be used and delivered.
Attribute | Format Details | Delivery | Purpose | Mandatory | geoCOBie Mapping | Updates |
---|---|---|---|---|---|---|
Alt. Asset Ref The alternative asset reference used to cross reference to other data systems | Text Max Length: 150 | EA2 | P09 Operations | No | Feature.Attribute.Name.AltAssetRef | 27-04-2021 |
Alternative Purpose 1 An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose) | Picklist Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources | EA2 | P01 Registration | No | Feature.Attribute.Name.AlternativePurpose1 | 27-04-2021 Picklist edited 14-06-2021 |
Alternative Purpose 2 An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose) | Picklist Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources | EA2 | P01 Registration | No | Feature.Attribute.Name.AlternativePurpose2 | 27-04-2021 Picklist edited 14-06-2021 |
Annual Maintenance Costs (Current FY) How much the asset costs this year to maintain to target condition | Number Max: 1,000,000,000.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P10 Maintenance | No | Feature.Attribute.Name.AnnualMaintenanceCostsCurrentFY | 27-04-2021 |
Annual Maintenance Costs (Previous FY) How much the asset cost last year to maintain to target condition | Number Max: 1,000,000,000.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P10 Maintenance | No | Feature.Attribute.Name.AnnualMaintenanceCostsPreviousFY | 27-04-2021 |
Asbestos on Site Is asbestos present on site? | Picklist Asbestos on site, confirmed by survey. No asbestos on site, confirmed by survey or constructed post-2000. Presence of asbestos on site unknown. | EA3 | P03 Risk management | No | Feature.Attribute.Name.AsbestosOnSite | 12-05-2023 |
Asset Availability The Asset Availability is the normalised product of the individual Asset Element availabilities within the Asset. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P15 Inspection | No | Feature.Attribute.Name.AssetAvailability | 27-04-2021 |
Asset Below MEICA Condition Target An indication that an asset has an Asset Availability below its MEICA condition target. Only applicable when MEICA Elements Present = True | Boolean | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.AssetBelowMEICAConditionTarget | 27-04-2021 |
Asset Category The Category of the asset | Picklist Buildings and Compounds | EA2 | P01 Registration | Yes | Feature.Attribute.Name.AssetCategory | 27-04-2021 |
Asset Complex 1 The ID (GUID) of the Asset Complex that this asset belongs to | Text Max Length: 32 | EA6 | P09 Operations | No | Feature.Attribute.Name.AssetComplex2 | 27-04-2021 |
Asset Complex 2 The ID (GUID) of the Secondary Asset Complex that the asset belongs to | Text Max Length: 32 | EA6 | P09 Operations | No | Feature.Attribute.Name.AssetComplex1 | 27-04-2021 |
Asset Complex Ref 1 The Asset Reference of the first Asset Complex which contains this asset | Text Asset code xx + sequence number | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetComplexRef1 | 27-04-2021 |
Asset Complex Ref 2 The Asset Reference of an additional Asset Complex which contains this asset | Text Asset code xx + sequence number | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetComplexRef2 | 27-04-2021 |
Asset End Date The end date of the asset. This is only to be populated when asset is withdrawn or fully decommissioned | Date | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetEndDate | 27-04-2021 |
Asset Factored Availability Override An indication of the use of a manually entered value for Site Factored Availability, instead of the value calculated by default. Only applicable when MEICA Elements Present = True | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.AssetFactoredAvailabilityOverride | 27-04-2021 |
Asset Height The total height of the building, taken from ground level to the top of the roof. | Number Max: 200.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetHeight | 26-02-2024 |
Asset Height DQF Data Quality Flag for the Asset Height attribute. Mandatory if an Asset Height value is present. | Picklist DQF 1 : +/- 0.01m to 0.05m vertical accuracy (Typically on-site survey, including recent (post 2016) high resolution lidar with additional on-site ground validation) DQF 2a : +/- >0.05m to 0.10m vertical accuracy (Typically recent standard lidar survey - post 2016) DQF 2b : +/- >0.05m to 0.15m vertical accuracy (Typically lidar surveyed between 2004 and 2016, or photogrammetry) DQF 3 : +/- 0.15m to 0.75m vertical accuracy (Typically older (pre-2004) lidar or Photogrammetry) DQF 4 : +/- 0.75m or more vertical accuracy DQF 0 : unknown quality | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetHeightDQF | 26-02-2024 |
Asset Height DQF Date The date the Asset Height DQF attribute was input. Mandatory if an Asset Height value is present. | Date | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetHeightDQFDate | 26-02-2024 |
Asset ID The Asset ID from the AIMS OM system, if known. For new assets that are not yet in AIMS OM, use "n/a". | Text Max Length: 50 | EA2 | P01 Registration | Yes | Feature.Attribute.Name.AssetID | 14-06-2021 |
Asset Length The total length of the building from front to back. | Number Max: 10,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetLength | 26-02-2024 |
Asset Length DQF Data Quality Flag for the Asset Length attribute. Mandatory if an Asset Length value is present. | Picklist DQF 1 : +/- 0.01m to 0.05m horizontal accuracy (Typically on-site survey) DQF 2 : +/- >0.05m to 0.25m horizontal accuracy (Typically Lidar Point Cloud or Photogrammetry) DQF 3 : +/- 0.25m to 0.50m horizontal accuracy (Typically Lidar raster DEMs or Photogrammetry) DQF 4 : +/- 0.50m to 1.0m horizontal accuracy (Typically captured from OS Mapping (e.g. MasterMap 2023)) DQF 5 : >1m horizontal accuracy (Typically Google Maps etc) DQF 0 : unknown quality | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetLengthDQF | 26-02-2024 |
Asset Length DQF Date The date the Asset Length DQF attribute was input. Mandatory if an Asset Length value is present. | Date | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetLengthDQFDate | 26-02-2024 |
Asset Name The name of the asset if it has one | Text Max Length: 150 | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetName | 27-04-2021 |
Asset Ref Unique asset reference code in scheme context assigned by scheme designer, e.g. VN0123 | Text Asset code VN + sequence number | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetRef | 27-04-2021 |
Asset Risk Value The Risk Value is calculated as the Risk Variance multiplied by the Estimated Avoided Damages Value. Only applicable when MEICA Elements Present = True | Number Max: 99,999,999,999.00 Min: -99,999,999,999.00 Number of decimal places: 2 Units: pounds | EA7 | P15 Inspection | No | Feature.Attribute.Name.AssetRiskValue | 27-04-2021 |
Asset Risk Variance The Risk Variance is calculated using the following formula: ((Factored Availability / FRMS 'MEICA Condition Target') - 1) * Used House Equivalent. Only applicable when MEICA Elements Present = True | Number Max: 999,999.00 Min: -999,999.00 Number of decimal places: 2 | EA7 | P15 Inspection | No | Feature.Attribute.Name.AssetRiskVariance | 27-04-2021 |
Asset Start Date The date the asset becomes operational | Date | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetStartDate | 27-04-2021 |
Asset Start Date DQF Data Quality Flag for the Asset Start Date attribute. Mandatory if an Asset Start Date value is present. | Picklist DQF 1 : Start Date known based on documented evidence (use 1st of month if day uncertain and June if month uncertain) DQF 2 : Start Date estimated based on local knowledge (use 1st of month if day uncertain and June if month uncertain) DQF 3 : Start Date estimated by decade (use 1st Jan and middle year of decade e.g. 01/01/1965) DQF 4: Start Date from legacy system DQF 5: Start date checked but unknown (leave date blank) DQF 0 : unknown quality (given to all existing AIMS OM Start Date) | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetStartDateDQF | 26-02-2024 Picklist edited 18-04-2024 |
Asset Start Date DQF Date The date the Asset Start Date DQF attribute was input. Mandatory if an Asset Start Date value is present. | Date | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetStartDateDQFDate | 26-02-2024 |
Asset Status The status of the asset | Picklist Active Discontinued New asset record for review No longer in use, but still on site Proposed asset Under construction | EA5 | P01 Registration | Yes | Feature.Attribute.Name.AssetStatus | 27-04-2021 Picklist edited 18-04-2024 |
Asset Status Date The date the status of the asset was assessed | Date | EA5 | P01 Registration | Yes | Feature.Attribute.Name.AssetStatusDate | 27-04-2021 |
Asset Type The type of asset | Picklist Monitoring Building | EA2 | P01 Registration | Yes | Feature.Attribute.Name.AssetType | 27-04-2021 |
Asset Width The total width of the front of the building (the side with the main entrance). | Number Max: 10,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetWidth | 26-02-2024 |
Asset Width DQF Data Quality Flag for the Asset Width attribute. Mandatory if an Asset Width value is present. | Picklist DQF 1 : +/- 0.01m to 0.05m horizontal accuracy (Typically on-site survey) DQF 2 : +/- >0.05m to 0.25m horizontal accuracy (Typically Lidar Point Cloud or Photogrammetry) DQF 3 : +/- 0.25m to 0.50m horizontal accuracy (Typically Lidar raster DEMs or Photogrammetry) DQF 4 : +/- 0.50m to 1.0m horizontal accuracy (Typically captured from OS Mapping (e.g. MasterMap 2023)) DQF 5 : >1m horizontal accuracy (Typically Google Maps etc) DQF 0 : unknown quality | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetWidthDQF | 26-02-2024 |
Asset Width DQF Date The date the Asset Width DQF attribute was input. Mandatory if an Asset Width value is present. | Date | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetWidthDQFDate | 26-02-2024 |
Baseline Carbon The baseline CO2 calculation based on the kWh baseline (multiplied by an agreed conversion factor) | Number Max: 999,999.99 Min: 0.00 Number of decimal places: 2 Units: kgCO2 | EA7 | P08 Impacts | No | Feature.Attribute.Name.BaselineCarbon | 27-04-2021 |
Baseline Consumption The baseline power consumption | Number Max: 999,999.99 Min: 0.00 Number of decimal places: 2 Units: kWh | EA7 | P08 Impacts | No | Feature.Attribute.Name.BaselineConsumption | 27-04-2021 |
Baseline Cost The expected energy cost for the asset | Number Max: 999,999.99 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P08 Impacts | No | Feature.Attribute.Name.Baseline | 27-04-2021 |
Below Required Condition Is the Asset below required condition? | Boolean | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.BelowRequiredCondition | 27-04-2021 |
Bounding Box A geospatial orthogonal bounding box cube containing the extent of the asset. This is to be expressed as a JSON lineString: [[lower left point easting,lower left point northing,lowest point elevation],[upper right point easting,upper right point northing,highest point elevation]] of the cube with geoCOBie Unit of 'bbox:EPSG7405:ETRS89:OSTN15:OSGM15' | Geometry Units: bbox:EPSG7405:ETRS89:OSTN15:OSGM15 | EA2 | P01 Registration | No | Feature.Attribute.Name.BoundingBox | 05-09-2022 |
BRC Date The date that the Asset was inspected to be below required condition. Only available if Below Required Condition = Yes | Date | EA7 | P09 Operations | No | Feature.Attribute.Name.BRCDate | 04-05-2021 |
Calculated Asset Availability The Calculated Asset Availability is the value of asset availability which is used in further calculations, e.g. to compare against target. It is either the default value of Asset Availability or the Overridden Equivalent if this is used. Only applicable when MEICA Elements Present = True | Number Max: 1.00 Min: 0.00 Number of decimal places: 2 | EA7 | P09 Operations | No | Feature.Attribute.Name.CalculatedAssetAvailability | 27-04-2021 |
Calculated Condition The overall calculated condition of the asset based on the actual condition of the elements and the element weightings | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.CalculatedCondition | 27-04-2021 |
Candidate for Discontinuation Is the Asset a candidate for Discontinuation? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.CandidateforDiscontinuation | 27-04-2021 |
Change Reason The reason the asset's status has been changed. Mandatory when Reason for Asset Discontinued = Other. | Text Max Length: 500 | EA7 | P09 Operations | No | Feature.Attribute.Name.ChangeReason | 26-02-2024 |
Comments Other comments about the asset | Text Max Length: 2000 | EA2 | P09 Operations | No | Feature.Attribute.Name.Comments | 27-04-2021 |
Completion Date The date that the inspection or assessment was completed | Date | EA7 | P15 Inspection | No | Feature.Attribute.Name.CompletionDate | 27-04-2021 |
Condition Measure The Condition Measure is the highest value in the ConditionThreshold table that is less than or equal to the Asset Availability. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P15 Inspection | No | Feature.Attribute.Name.ConditionMeasure | 27-04-2021 |
Condition Target A condition target against which to compare the Condition Measure. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P15 Inspection | No | Feature.Attribute.Name.ConditionTarget | 27-04-2021 |
Confined Spaces Is the site on the Confined Spaces Register? | Boolean | EA3 | P09 Operations | Yes | Feature.Attribute.Name.ConfinedSpaces | 27-04-2021 |
Control LineString A spatial lineString that locates the asset and further classified by the associated LineStringType attribute confirming its relative location to the asset. A lineString is a series of design or measured spatial triple points (easting, northing, elevation) each connected by a single non-crossing line, with single points at each end, that locate an asset. A lineString is expressed as a JSON array of type geoJSON lineString, e.g. [[x1,y1,z1],[x2,y2,z2],...] It is further classified by the associated LineStringType attribute confirming its relative location to the asset. Interim points should be spaced at a maximum of 2m for lines < 10m in length, or 10m otherwise. LineStrings may be open as in the case of linear asset types or closed (polygon) in the case of land or site assets. For linear assets, see the note in the description above about the maximum length. The default CRS is a 3D CRS to EPSG 7405 with confirmed type, European reference frame and UK OS transformation with geoCOBie Unit of 'LineString:EPSG7405:ETRS89:OSTN15:OSGM15' | Geometry Units: LineString:EPSG7405:ETRS89:OSTN15:OSGM15 | EA2 | P02 Compliance | No | Feature.Attribute.Name.ControlLineString | 05-09-2022 |
County The county within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 300 | Auto | P09 Operations | No | Feature.Attribute.Name.County | 27-04-2021 |
Current Condition The current condition of the asset | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P09 Operations | No | Feature.Attribute.Name.CurrentCondition | 27-04-2021 |
Date Started The date that the inspection or assessment started | Date | EA7 | P15 Inspection | No | Feature.Attribute.Name.DateStarted | 27-04-2021 |
Default AP Team The default Asset Performance team for inspections. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W) | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultAPTeam | 16-01-2024 |
Default AP Team Email Address The email address of the default Asset Performance team. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 500 | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultAPTeamEmailAddress | 16-01-2024 |
Default Field Team The default Field team carrying our work on this Asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W) | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultFieldTeam | 16-01-2024 |
Default Field Team Email Address The email address of the default Field team. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 500 | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultFieldTeamEmailAddress | 16-01-2024 |
Default Geo Type The default geographic feature type of the asset in AIMS OM | Picklist Point | EA2 | P09 Operations | Yes | Feature.Attribute.Name.DefaultGeoType | 02-12-2022 |
Description A brief description of the asset and/or its construction type | Text Max Length: 400 | EA2 | P09 Operations | No | Feature.Attribute.Name.Description | 27-04-2021 |
EA Water Management Area The Area the Asset is located in | Picklist Cumbria and Lancashire Devon Cornwall and the Isles of Scilly East Anglia East Midlands Greater Manchester Merseyside and Cheshire Hertfordshire and North London Kent South London and East Sussex Lincolnshire and Northamptonshire North East Solent and South Downs Thames Wessex West Midlands Yorkshire | EA7 | P09 Operations | Yes | Feature.Attribute.Name.EAWaterManagementArea | 27-04-2021 |
Easting The easting of the asset's geographic location (British National Grid) | Number Max: 700,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.Easting | 27-04-2021 |
End of Life Liabilities How much an asset will eventually cost to decommission (e.g. how much it will cost to demolish or make safe, how much we would need to pay to get out of a signed maintenance agreement, etc) | Number Max: 9,999,999,999.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P09 Operations | No | Feature.Attribute.Name.EndofLifeLiabilities | 27-04-2021 |
Exclude from External Publication Should the asset be excluded from being shared publicly? E.g. if the values recorded are sensitive information, personal information or contact details. | Boolean | EA7 | P06 Security | Yes | Feature.Attribute.Name.ExcludefromExternalPublication | 17-07-2023 |
Factored Availability The Factored Availability is defined as the Asset Availability multiplied by the Asset Element Class value of each active Asset Element on the asset raised to the power of the number of active assets on the asset. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P09 Operations | No | Feature.Attribute.Name.FactoredAvailability | 27-04-2021 |
FCRM Strategically Important Asset (SIA) Is the Asset an FCRM Strategically Important Asset? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.FCRMStrategicallyImportantAssetSIA | 27-04-2021 |
FCRM Strategically Important Asset (SIA) Band The banding of the SIA. Mandatory where FCRM Strategically Important Asset (SIA) = True | Picklist A B C | EA7 | P09 Operations | No | Feature.Attribute.Name.FCRMStrategicallyImportantAssetSIABand | 27-04-2021 |
Final Asset Condition The final recorded condition of the asset after inspection and any manual override. | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | No | Feature.Attribute.Name.FinalAssetCondition | 27-04-2021 |
FRMS The name and code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMS | 16-01-2024 |
FRMS Code The code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 10 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMSCode | 16-01-2024 |
FRMS Consequence A measure of the vulnerability of the FRMS to failures of assets, considering the time lag between failure and flooding occuring, and critical infrastructure that may be affected as well as houses. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist HIGHC01 HIGHC02 HIGHC03 HIGHC04 HIGHC08 MEDC06 MEDC07 MEDC12 LOWC05 LOWC09 LOWC10 LOWC11 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMSConsequence | 16-01-2024 |
FRMS Name The name of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 37 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMSName | 16-01-2024 |
FWM Act Designated Is the asset designated under the Floods and Water Management Act 2020? | Picklist Yes No | EA7 | P02 Compliance | No | Feature.Attribute.Name.FWMActDesignated | 27-04-2021 |
House Equivalent A measure of the number of residential properties at increased risk of flooding if the asset is below target condition, which is calculated by default as 10% of the '100 year houses at risk' value from the FRMS. Only applicable when MEICA Elements Present = True | Number Max: 999,999.00 Min: 0.00 Number of decimal places: 2 | EA7 | P09 Operations | No | Feature.Attribute.Name.HouseEquivalent | 27-04-2021 |
Insp Freq EIC Inspection The required frequency of inspection to be conducted by the Engineering Inspection Coordinator. Only applicable when MEICA Elements Present = True | Number Max: 999,999,999 Min: 0 Number of decimal places: 0 Units: months | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspFreqEICInspection | 26-02-2024 |
Insp Freq PUWER The required frequency of Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. | Number Max: 999,999,999 Min: 0 Number of decimal places: 0 Units: months | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspFreqPUWER | 17-10-2023 |
Insp Freq Visual The required frequency of visual inspection. | Number Max: 999,999,999 Min: 0 Number of decimal places: 0 Units: months | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspFreqVisual | 17-10-2023 |
Inspection Comments Any specific comments related to the inspection or assessment that are worth noting | Text Max Length: 600 | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.InspectionComments | 27-04-2021 |
Inspection ID The identification number for the individual instance of inspection. | Text Max Length: 50 | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.InspectionID | 27-04-2021 |
Inspection Type The type of inspection to be conducted. | Picklist Ad Hoc Culvert Internal Inspection Ad Hoc EIC Inspection Ad Hoc PSRA Land Water Ad Hoc PSRA Tree Ad Hoc Visual Asset Inspection Culvert Internal Inspection EIC Inspection MEICA site safety and operation inspection MRM Inspection PSRA Assessment PSRA Land Water PSRA Tree PSRA Tree Assessment PUWER Inspection Section 10 Reservoir Inspection Section 12 Reservoir Inspection Site Inspection - 6 month Transition Inspection Visual Asset Inspection | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionType | 27-04-2021 |
Inspection Unit (EIC) The inspection unit of inspection to be conducted by the Engineering Inspection Coordinator. Populated via a picklist in AIMS OM. Only applicable when MEICA Elements Present = True | Text Max Length: 100 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionUnitEIC | 26-02-2024 |
Inspection Unit (PUWER) The inspecton unit reference number for Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. Populated via a picklist in AIMS OM. | Text Max Length: 100 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionUnitPUWER | 27-04-2021 |
Inspection Unit (Visual) The inspecton unit reference for visual inspection. Populated via a picklist in AIMS OM. | Text Max Length: 100 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionUnitVisual | 27-04-2021 |
Inspector The name of the Asset Inspector who is conductng the inspection. This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionID | 27-04-2021 |
Interested Party The details for any parties that have a particular interest in the asset. Set of linked fields for each interested party: Party Type (Individial, Organisation), Party, Preferred Contact Method (Email, In Person, Mail, Phone, Text), Address, Post Code, Phone Number 1, Phone Number 2, Fax Number, E-Mail, Consent Obtained, Landowner? | Link | EA7 | P02 Compliance | No | Feature.Attribute.Name.InterestedParty | 27-04-2021 |
Internal Drainage Board (IDB) The Internal Drainage Board within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 100 | Auto | P02 Compliance | No | Feature.Attribute.Name.InternalDrainageBoardIDB | 27-04-2021 |
Key / Access Card Details Details of the key or access card that is required to gain entry. Applicable where Key / Access Card Required = Yes | Text Max Length: 100 | EA7 | P02 Compliance | No | Feature.Attribute.Name.KeyAccessCardDetails | 27-04-2021 |
Key / Access Card Required? Is a key or access card required to gain entry? | Picklist Yes No | EA7 | P02 Compliance | No | Feature.Attribute.Name.KeyAccessCardRequired | 27-04-2021 |
KPI881 - Inspections - FCRM 2.3 Is the asset included in the KPI881 (Inspections) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI881Inspections | 27-04-2021 |
KPI885 - Public Safety Sites Is the asset included in the KPI885 (Public safety sites) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI885PublicSafetySites | 27-04-2021 |
KPI962 - Maintaining above required condition - FCRM 1.3 Is the asset included in the KPI962 (Maintaining above required condition) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI962Maintainingaboverequiredcondition | 27-04-2021 |
KPI965 - Conveyance - FCRM 2.8 Is the asset included in the KPI965 (Conveyance) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI965Conveyance | 27-04-2021 |
KPI965 - Households at risk - FCRM 2.5 Is the asset included in the KPI965 (Households at risk) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI965Householdsatrisk | 27-04-2021 |
KPI970 - Performance vs Engineering deadline - FCRM 2.6 Is the asset included in the KPI970 (Performance vs engineering deadline) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI970PerformancevsEngineeringdeadline | 27-04-2021 |
Landowner Contact Required Is contact with the landowner needed in order to gain entry? | Picklist Yes No | EA7 | P02 Compliance | No | Feature.Attribute.Name.LandownerContactRequired | 27-04-2021 |
Last Routine Inspection The AIMS OM reference (GUID) of the last recorded routine inspection. | Text Max Length: 32 | EA7 | P15 Inspection | No | Feature.Attribute.Name.LastRoutineInspection | 27-04-2021 |
Last Visual Inspection The AIMS OM reference (GUID) of the last recorded visual inspection. | Text Max Length: 32 | EA7 | P15 Inspection | No | Feature.Attribute.Name.LastVisualInspection | 27-04-2021 |
Last Visual Inspection Comments Comments on the last visual inspection | Text Max Length: 500 | EA7 | P15 Inspection | No | Feature.Attribute.Name.LastVisualInspectionComments | 27-04-2021 |
Latitude The latitude of the asset's geographic location | Number Max: 56.000000 Min: 49.000000 Number of decimal places: 6 Units: degrees | Auto | P09 Operations | Yes | Feature.Attribute.Name.Latitude | 27-04-2021 |
Legacy CMMS ID The element's ID from the legacy CMMS system. Applicable where asset has MEICA maintained elements. | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.LegacyCMMSID | 27-04-2021 |
Legacy MEICA Site / Asset Name The element's legacy MEICA site or asset name. Applicable where asset has MEICA maintained elements. | Text Max Length: 100 | Auto | P09 Operations | No | Feature.Attribute.Name.LegacyMEICASiteAssetName | 27-04-2021 |
LineString Type The type of the Control LineString | Picklist Axial Crest Invert | EA2 | P08 Impacts | No | Feature.Attribute.Name.LineStringType | 27-04-2021 |
Local Authority The local authority within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 300 | Auto | P09 Operations | No | Feature.Attribute.Name.LocalAuthority | 27-04-2021 |
Location The location of the asset, for example: nearest town and/or distance downstream of named bridge | Text Max Length: 400 | EA2 | P09 Operations | No | Feature.Attribute.Name.Location | 27-04-2021 |
Longitude The longitude of the asset's geographic location | Number Max: 2.000000 Min: -7.000000 Number of decimal places: 6 Units: degrees | Auto | P09 Operations | Yes | Feature.Attribute.Name.Longitude | 27-04-2021 |
Maintainer The organisation or private individual recognised to be the maintainer of the asset. The maintainer is the organisation or person who manages, and provides for, the maintenance of the asset but they may instruct others to carry out works on their behalf. This information is not mandatory if the asset is not maintained. This is a mandatory field where Not Maintained = No | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | No | Feature.Attribute.Name.Maintainer | 05-09-2022 |
Maintainer Date Change The date the Maintainer was changed. | Date | EA6 | P09 Operations | Yes | Feature.Attribute.Name.MaintainerDateChange | 18-12-2023 |
Maintainer Function Department within Maintaining Organisation | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA7 | P09 Operations | No | Feature.Attribute.Name.MaintainerFunction | 27-04-2021 |
Maintainer Reason for Change The reason the Maintainer was changed. | Picklist Abandonment Handover Incorrectly Recorded New Asset Record | EA6 | P09 Operations | Yes | Feature.Attribute.Name.MaintainerReasonForChange | 18-12-2023 |
MEICA Condition Target A target value for the Factored Availability of an asset, based upon the FRMS Consequence. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P09 Operations | No | Feature.Attribute.Name.MEICAConditionTarget | 27-04-2021 |
MEICA Element Failed Applicable where MEICA Elements Present = True. Have any of the MEICA elements failed? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.MEICAElementFailed | 27-04-2021 |
MEICA Elements Present Are MEICA elements present on the asset? Attribute automatically populated based on whether the asset has any elements which are set as MEICA Maintained Elements. | Boolean | Auto | P09 Operations | Yes | Feature.Attribute.Name.MEICAElementsPresent | 05-09-2022 |
MEICA Supra-Area The MEICA Supra-Area covering the asset | Picklist Anglian KSL & HNL Midlands North East North West South West SSD & WT | EA7 | P09 Operations | No | Feature.Attribute.Name.MEICASupraArea | 27-04-2021 |
MEICA Team Email Address The email address of the MEICA team covering the asset | Text Max Length: 80 | EA7 | P09 Operations | No | Feature.Attribute.Name.MEICATeamEmailAddress | 27-04-2021 |
Monitoring Purpose The purpose for the monitoring | Picklist Coastal Forecasting Debris Flow Level Tidal Machine Condition Machine Operation Precipitation Security Subsidence / Settlement Water Abstraction Monitoring Water Level Water Quality | EA7 | P09 Operations | Yes | Feature.Attribute.Name.MonitoringPurpose | 27-04-2021 Picklist edited 05-09-2022 |
MP Constituency The parliamentary constituency within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 300 | Auto | P09 Operations | No | Feature.Attribute.Name.MPConstituency | 27-04-2021 |
NGR National Grid Reference. Will be populated by a spatial lookup | Text Max Length: 12 | Auto | P09 Operations | No | Feature.Attribute.Name.NGR | 27-04-2021 |
Northing The northing of the asset's geographic location (British National Grid) | Number Max: 700,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA7 | P09 Operations | Yes | Feature.Attribute.Name.Northing | 27-04-2021 |
Operational Area The asset's Operational Area. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist NE - CMBLNC - FCRM OPS North NE - CMBLNC - FCRM OPS South NE - DBNTLS - FCRM OPS North NE - DBNTLS - FCRM OPS South NE - LCNNTH - FCRM OPS Lincs NE - LCNNTH - FCRM OPS W&N NE - NHUDUT - FCRM OPS NE - YORKS - FCRM OPS N&EY NE - YORKS - FCRM OPS W&SY SE - CAMBED - FCRM OPS SE - ESNFSF - FCRM OPS Essex SE - ESNFSF - FCRM OPS N&S SE - HTSNLN - FCRM OPS East SE - HTSNLN - FCRM OPS West SE - KNTSLN - FCRM OPS East Kent SE - KNTSLN - FCRM OPS SLN & WK SE - KNTSLN - FCRM TTD SE - SLTSDN - FCRM OPS East SE - SLTSDN - FCRM OPS West SE - WTHMS - FCRM OPS Lower SE - WTHMS - FCRM OPS Upper W - DVNCWL - FCRM OPS Devon & Cornwall - FCRM Ops W - GMMYCH - FCRM OPS W - SHHRWG - FCRM OPS W - STWKWM - FCRM OPS W - WESSEX - FCRM OPS E W - WESSEX - FCRM OPS W | Auto | P09 Operations | No | Feature.Attribute.Name.OperationalArea | 16-01-2024 |
Operator The organisation or private individual recognised to be the operator of the asset | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | Yes | Feature.Attribute.Name.Operator | 27-04-2021 Picklist edited 05-09-2022 |
Operator Date Change The date the Operator was changed. | Date | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OperatorDateChange | 18-12-2023 |
Operator Function Department of Operator | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA7 | P09 Operations | No | Feature.Attribute.Name.OperatorFunction | 27-04-2021 |
Operator Reason for Change The reason the Operator was changed. | Picklist Abandonment Handover Incorrectly Recorded New Asset Record | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OperatorReasonForChange | 18-12-2023 |
Overridden Equivalent A manually entered value for House Equivalent. Only applicable when MEICA Elements Present = True and Override = True | Number Max: 999,999.00 Min: 0.00 Number of decimal places: 2 | EA7 | P09 Operations | No | Feature.Attribute.Name.OverriddenEquivalent | 27-04-2021 |
Overridden Equivalent Asset Availability A manually entered value for Asset Factored Availability, to be used instead of the default calculation. Only applicable when MEICA Elements Present = True and Asset Availability Override = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P09 Operations | No | Feature.Attribute.Name.OverriddenEquivalentAssetAvailability | 27-04-2021 |
Override An indication of the use of a manually entered value for House Equivalent, instead of the value calculated by default from the FRMS. Only applicable when MEICA Elements Present = True | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.Override | 27-04-2021 |
Override Condition New condition of the asset after the override. Only applies when Override Calculated Condition = True | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | No | Feature.Attribute.Name.OverrideCondition | 27-04-2021 |
Owner The organisation or private individual known to be the owner of the asset | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | Yes | Feature.Attribute.Name.Owner | 27-04-2021 Picklist edited 05-09-2022 |
Owner Date Change The date the Owner was changed. | Date | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OwnerDateChange | 18-12-2023 |
Owner Function The Department within the Organisation with Owner responsibility | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA6 | P09 Operations | No | Feature.Attribute.Name.OwnerFunction | 27-04-2021 |
Owner Reason for Change The reason the Owner was changed. | Picklist Incorrectly Recorded New Asset Record Sale | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OwnerReasonForChange | 18-12-2023 |
Parish Council The parish council within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 200 | Auto | P09 Operations | No | Feature.Attribute.Name.ParishCouncil | 27-04-2021 |
Photo A photograph or image related to the asset. | Photo | EA4 | P09 Operations | No | Feature.Attribute.Name.Photo | 17-07-2023 |
Post Code The postcode within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 15 | Auto | P09 Operations | No | Feature.Attribute.Name.PostCode | 27-04-2021 |
Previous Condition The previous condition of the Asset | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | No | Feature.Attribute.Name.PreviousCondition | 27-04-2021 |
Primary Purpose The main purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose) | Picklist Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources | EA2 | P09 Operations | Yes | Feature.Attribute.Name.PrimaryPurpose | 27-04-2021 Picklist edited 14-06-2021 |
PSRA System ID The ID (GUID) of the PSRA System Asset that the Asset is related to | Text Max Length: 32 | EA6 | P03 Risk management | No | Feature.Attribute.Name.PSRASystemID | 27-04-2021 |
PUWER? Do any of the elements of this asset require PUWER inspections? Only applicable when MEICA Elements Present = True | Boolean | EA7 | P03 Risk management | Yes | Feature.Attribute.Name.PUWER | 27-04-2021 |
RAAC Details Details of Reinforced Autoclaved Aerated Concrete (RAAC) at the asset. | Text Max Length: 500 | EA7 | P09 Operations | No | Feature.Attribute.Name.RAACDetails | 18-04-2024 |
RAAC Survey Date The date a survey was undertaken to check for the presence of Reinforced Autoclaved Aerated Concrete (RAAC) at the asset. Mandatory when a survey has been undertaken. | Date | EA7 | P09 Operations | No | Feature.Attribute.Name.RAACSurveyDate | 18-04-2024 |
Raw Condition The Granular Weighted Asset Condition | Number Max: 99,999.00 Min: 0.00 Number of decimal places: 2 | EA7 | P15 Inspection | No | Feature.Attribute.Name.RawCondition | 27-04-2021 |
Reason for Asset Discontinued The reason the asset has been marked as Discontinued. Only applicable when Asset Status = Discontinued. | Picklist Asset replaced Demolition Other Withholding repair following failure | EA7 | P09 Operations | No | Feature.Attribute.Name.ReasonForAssetDiscontinued | 26-02-2024 |
Reason for Selection Applicable where Candidate for Discontinuation = True. The reason why the asset has been selected for Discontinuation | Text Max Length: 500 | EA7 | P09 Operations | No | Feature.Attribute.Name.ReasonforSelection | 27-04-2021 |
Regional Flood & Coastal Committee (RFCC) The Regional Flood & Coastal Committee within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.RegionalFloodCoastalCommitteeRFCC | 27-04-2021 |
Reinforced Autoclaved Aerated Concrete (RAAC)? Is Reinforced Autoclaved Aerated Concrete (RAAC) known to be present in the asset? | Picklist RAAC presence unconfirmed, further investigation required Low risk of RAAC, desktop screening RAAC presence confirmed by survey, High risk to personnel and high risk of non operation of assets RAAC presence confirmed by survey, High risk to personnel and low risk of non operation of assets RAAC presence confirmed by survey, Low risk to personnel and high risk of non operation of assets RAAC presence confirmed by survey, Low risk to personnel and low risk of non operation of assets No RAAC presence confirmed by survey No RAAC presence confirmed by visual inspection or constructed post 1995 | EA7 | P09 Operations | No | Feature.Attribute.Name.ReinforcedAutoclavedAeratedConcreteRAAC | 18-04-2024 |
Related Event Reference The reference of the event related to the inspection. This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA7 | P09 Operations | No | Feature.Attribute.Name.RelatedEventReference | 27-04-2021 |
Replacement Cost How much would the Asset cost to completely replace? | Number Max: 9,999,999,999.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA6 | P08 Impacts | No | Feature.Attribute.Name.ReplacementCost | 27-04-2021 |
Replacement Cost Assessment Date The date the replacement cost of the asset was assessed | Date | EA6 | P08 Impacts | No | Feature.Attribute.Name.ReplacementCostDate | 27-04-2021 |
Residual Life The estimated residual life of the asset | Number Max: 100 Min: 0 Number of decimal places: 0 Units: years | EA6 | P09 Operations | No | Feature.Attribute.Name.ResidualLife | 27-04-2021 |
Residual Life Date The date the residual life was assessed | Date | EA6 | P09 Operations | No | Feature.Attribute.Name.ResidualLifeDate | 27-04-2021 |
Responsibility Split - Organisation An organisation that has shared responsibility for the asset. Multiple options can be made | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibilitySplitOrganisation | 27-04-2021 Picklist edited 05-09-2022 |
Responsibility Split - Organisation Function The department within the organisation with shared responsibility | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibilitySplitOrganisationFunction | 27-04-2021 |
Responsibility Split - Percentage Split The percentage of the organisation's responsibility for the asset. All values must total 100% | Number Max: 99 Min: 0 Number of decimal places: 0 Units: % | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibilitySplitPercentageSplit | 27-04-2021 |
Responsible Officer Who is the Responsible Officer of the Asset? This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibleOfficer | 27-04-2021 |
Schedule Date The scheduled date of the inspection or assessment. | Date | EA6 | P15 Inspection | Yes | Feature.Attribute.Name.ScheduleDate | 27-04-2021 |
SIA Contingency Document Link The link to the SIA contingency document. Applicable only where FCRM Strategically Important Asset (SIA) = True and SIA Contingency Plans in Place = True | Link | EA7 | P08 Impacts | No | Feature.Attribute.Name.SIAContingencyDocumentLink | 27-04-2021 |
SIA Contingency Plans in Place Are SIA contingency plans in place? Applicable only where FCRM Strategically Important Asset (SIA) = True | Boolean | EA7 | P08 Impacts | Yes | Feature.Attribute.Name.SIAContingencyPlansinDocument | 27-04-2021 |
SIA Reason for Submission The reason for the SIA submission. Mandatory where FCRM Strategically Important Asset (SIA) = True | Text Max Length: 2000 | EA7 | P08 Impacts | No | Feature.Attribute.Name.SIAReasonforSubmission | 27-04-2021 |
Site Liaison Officer Who is the Site Liaison Officer of the Asset? This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.SiteLiaisonOfficer | 27-04-2021 |
Site Priority The priority of the Asset. Only applicable when MEICA Elements Present = True | Picklist High Medium Low | EA6 | P09 Operations | No | Feature.Attribute.Name.SitePriority | 27-04-2021 |
Spatial Quality The data quality flag for the spatial position of the asset | Picklist 1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked | EA7 | P09 Operations | No | Feature.Attribute.Name.SpatialQuality | 27-04-2021 |
Target Condition The target condition of the Asset | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P09 Operations | No | Feature.Attribute.Name.TargetCondition | 27-04-2021 |
Unknown or Not Maintained Is the asset not maintained? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.UnknownorNotMaintained | 27-04-2021 |
Water Course Details Set By User Were the Watercourse details set by the user? | Boolean | EA6 | P15 Inspection | Yes | Feature.Attribute.Name.WaterCourseDetailsSetByUser | 27-04-2021 |
Water Course GML ID The GML ID of the Watercourse where the Asset is located | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.WaterCourseGMLID | 27-04-2021 |
Water Course Valid From The date that the watercourse was recorded, established, constructed or classified as main river | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.WaterCourseValidFrom | 27-04-2021 |
Watercourse Alt Name An alternative name of the Watercourse where the Asset is located | Text Max Length: 200 | EA2 | P09 Operations | No | Feature.Attribute.Name.WatercourseAltName | 27-04-2021 |
Watercourse Name The name of the Watercourse where the Asset is located | Text Max Length: 200 | EA2 | P09 Operations | No | Feature.Attribute.Name.WatercourseName | 27-04-2021 |
WFD Waterbody ID The ID of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.WFDWaterbodyID | 27-04-2021 |
WFD Waterbody Name The name of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.WFDWaterbodyName | 27-04-2021 |
Work Type The type of work that is required. | Picklist Ad Hoc Inspection Capital Defence Capital Recondition Capital Maintenance Post Incident Inspection Post Remedial Work Inspection Scheduled Inspection Scheduled Maintenance - Frequent Scheduled Maintenance - Intermittent Unscheduled Maintenance - Reactive | EA7 | P15 Inspection | No | Feature.Attribute.Name.WorkType | 27-04-2021 |
Year Last Refurbished The year the asset was last refurbished | Number Max: 2,999 Min: 1,900 Number of decimal places: 0 | EA6 | P09 Operations | No | Feature.Attribute.Name.YearLastRefurbished | 27-04-2021 |