Wind Power Generator
MEICA
Stand alone power generator system for collecting the wind's kinetic energy that is not an element of another asset that is there to supply the asset with power.
Wind Power Generators are displayed in the Environment Agency's AIMS OM system as a point at the centre of the structure.
Elements
An Element Type is a component part of an Asset Type. Each Asset Type (except Asset Complex assets) will comprise of a prescribed set of Element Types. Some Element Types are essential and must be present to define an asset of that Asset Type. Other Element Types are optional, to be included when needed to define a particular Asset Type instance. An individual asset may have more than one instance of each Element Type.
This table lists the Element Types applicable to this Asset Type.
Element Type | Description | Element Code | Essential | Uniclass 2015 | Updates |
---|---|---|---|---|---|
Access Strip | A strip of land that is used for access to an asset for operational or maintenance purposes. | ASP | No | SL_32_35_02 | 11-04-2023 View history Request changes |
Alternator | An electrical generator that converts mechanical energy to electrical energy in the form of alternating current. | ALT | No | Pr_60_70_65_03 | 11-04-2023 View history Request changes |
Cable and Pipe Management | Routing and protection of a range of different cables and pipes belonging to an asset. Examples could be above or below ground ducting, trunking, conduit. This is not the cable or pipes themselves. | CMG | No | En_90_90_80 | 11-04-2023 View history Request changes |
Common Controls | Control panels that are common to many applications. | CMC | No | Pr_75_50_18_17 | 11-04-2023 View history Request changes |
Control Equipment | Electrical and electronic equipment that provides the ability to operate or change the state of electro-mechanical assets. | CEQ | No | Pr_75_50_18 | 11-04-2023 View history Request changes |
Distribution Board | A component of an electricity supply system that divides an electrical power feed into subsidiary circuits, while providing a protective fuse or circuit breaker for each circuit in a common enclosure. | DBD | No | Pr_60_70_22_22 | 11-04-2023 View history Request changes |
Distribution Network Operator Feeder | A component of an electrical supply that takes the feed of electricity into the distribution board. These are commonly owned by the network operator. | DFD | No | Pr_60_70_22_11 | 11-04-2023 View history Request changes |
Drive Assembly | The components that enable movement of an asset. | DAS | No | Pr_85_50_27_24 | 11-04-2023 View history Request changes |
Electrical System Ancillaries | Electrical system ancillaries, which are not recorded as other elements, and are part of the High Voltage Electrical System Assembly asset, Low Voltage Electrical System Assembly asset, Motor Control Centre Controls asset, Solar Farm asset or Wind Power Generator asset. This will include items such as protective devices, cables, switches, isolators, circuit breakers, sockets. Electrical system ancillaries will normally have the requirement of an Electrical Installation Condition Report (EICR). | ESY | No | Ss_70 | 04-06-2024 View history Request changes |
Electricity Meter | A device installed on an asset with an electricity supply to record the amount of electricity used. This can automatically send readings to a host system for monitoring purposes. | EMT | No | Ss_75_70_54_25 | 11-04-2023 View history Request changes |
Electricity Sub Meter | A smaller device installed on an asset with an electricity supply to record the amount of electricity used. This will not feed back readings to a host system but can be read manually to record the electrical usage of an asset that has multiple electrical elements or an asset complex. | ESM | No | Ss_75_70_54_25 | 11-04-2023 View history Request changes |
Equipment Housing | A structure used to house or secure equipment, not a walk-in structure. | CKK | No | Pr_80_77_28 | 11-04-2023 View history Request changes |
Excavated Ground | The ground that is excavated during the construction of the asset. Note that this Element is not recorded in AIMS OM. | EXG | No | SL_90_30_25 | 11-04-2023 View history Request changes |
Foundation | The lowest load-bearing part of a building, typically below ground level. | FDN | No | EF_20_05_30 | 11-04-2023 View history Request changes |
Incomer | The electricity feed into the main switchboard of a building or other asset. | INC | No | Ss_70_30_45_40 | 11-04-2023 View history Request changes |
Inverter | A device that converts direct current (DC) electricity into alternating current (AC) electricity. | INV | Yes | Pr_65_72_43_42 | 04-06-2024 View history Request changes |
Ladder | A ladder that is fixed in place or designed for a particular location to enable access to and egress from part of an asset or group of assets. Includes step irons. | LAD | No | Pr_25_30_85_02 | 11-04-2023 View history Request changes |
Mast | A very tall pole or tower usually in place to mount CCTV, aerials or radio transmitters. | MST | No | EF_37_17 | 11-04-2023 View history Request changes |
Starter | A starter (also self-starter, cranking motor, or starter motor) is a device used to rotate (crank) an internal-combustion engine so as to initiate the engine's operation under its own power. Starters can be electric, pneumatic, or hydraulic. | STA | No | Pr_75_51_52 | 11-04-2023 View history Request changes |
Transformer | A passive electrical device used to transfer power between different circuits. | TRN | No | Pr_60_70_36 | 11-04-2023 View history Request changes |
Wind Turbine | A device that converts the wind's kinetic energy into electrical energy to power an asset that it is attached to. | WTB | Yes | En_70_10_90 | 11-04-2023 View history Request changes |
Attributes
An attribute is a particular piece of data that describes a property of an object. Each Asset Type is described by a different set of attributes, although there are some attributes that are common to many Asset Types.
The table below lists the attributes that are applicable to this Asset Type, along with the data profile requirements for each attribute and details of when and how each should be used and delivered.
Attribute | Format Details | Delivery | Purpose | Mandatory | geoCOBie Mapping | Updates |
---|---|---|---|---|---|---|
Alt. Asset Ref The alternative asset reference used to cross reference to other data systems | Text Max Length: 150 | EA2 | P09 Operations | No | Feature.Attribute.Name.AltAssetRef | 27-04-2021 View history Request changes |
Alternative Purpose 1 An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose) | Picklist Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Groundwater Investigation Site Groundwater Quality Groundwater Quantity Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources | EA2 | P01 Registration | No | Feature.Attribute.Name.AlternativePurpose1 | 27-04-2021 Picklist edited 11-07-2024 View history Request changes |
Alternative Purpose 2 An alternative purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose) | Picklist Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Groundwater Investigation Site Groundwater Quality Groundwater Quantity Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources | EA2 | P01 Registration | No | Feature.Attribute.Name.AlternativePurpose2 | 27-04-2021 Picklist edited 11-07-2024 View history Request changes |
Annual Maintenance Costs (Current FY) How much the asset costs this year to maintain to target condition | Number Max: 1,000,000,000.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P10 Maintenance | No | Feature.Attribute.Name.AnnualMaintenanceCostsCurrentFY | 27-04-2021 View history Request changes |
Annual Maintenance Costs (Previous FY) How much the asset cost last year to maintain to target condition | Number Max: 1,000,000,000.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P10 Maintenance | No | Feature.Attribute.Name.AnnualMaintenanceCostsPreviousFY | 27-04-2021 View history Request changes |
Asbestos on Site Is asbestos present on site? | Picklist Asbestos on site, confirmed by survey. No asbestos on site, confirmed by survey or constructed post-2000. Presence of asbestos on site unknown. | EA3 | P03 Risk management | No | Feature.Attribute.Name.AsbestosOnSite | 12-05-2023 View history Request changes |
Asset Availability The Asset Availability is the normalised product of the individual Asset Element availabilities within the Asset. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P15 Inspection | No | Feature.Attribute.Name.AssetAvailability | 27-04-2021 View history Request changes |
Asset Below MEICA Condition Target An indication that an asset has an Asset Availability below its MEICA condition target. Only applicable when MEICA Elements Present = True | Boolean | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.AssetBelowMEICAConditionTarget | 27-04-2021 View history Request changes |
Asset Category The Category of the asset | Picklist MEICA | EA2 | P01 Registration | Yes | Feature.Attribute.Name.AssetCategory | 27-04-2021 View history Request changes |
Asset Complex 1 The ID (GUID) of the Asset Complex that this asset belongs to | Text Max Length: 32 | EA6 | P09 Operations | No | Feature.Attribute.Name.AssetComplex1 | 19-06-2024 View history Request changes |
Asset Complex 2 The ID (GUID) of the Secondary Asset Complex that the asset belongs to | Text Max Length: 32 | EA6 | P09 Operations | No | Feature.Attribute.Name.AssetComplex2 | 19-06-2024 View history Request changes |
Asset Complex Ref 1 The Asset Reference of the first Asset Complex which contains this asset | Text Asset code xx + sequence number | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetComplexRef1 | 27-04-2021 View history Request changes |
Asset Complex Ref 2 The Asset Reference of an additional Asset Complex which contains this asset | Text Asset code xx + sequence number | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetComplexRef2 | 27-04-2021 View history Request changes |
Asset End Date The end date of the asset. This is only to be populated when asset is withdrawn or fully decommissioned | Date | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetEndDate | 27-04-2021 View history Request changes |
Asset Factored Availability Override An indication of the use of a manually entered value for Site Factored Availability, instead of the value calculated by default. Only applicable when MEICA Elements Present = True | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.AssetFactoredAvailabilityOverride | 27-04-2021 View history Request changes |
Asset Height The total height of the structure, taken from ground level to its highest tangible point. | Number Max: 200.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetHeight | 17-10-2023 View history Request changes |
Asset Height DQF Data Quality Flag for the Asset Height attribute. Mandatory if an Asset Height value is present. | Picklist DQF 1 : +/- 0.01m to 0.05m vertical accuracy (Typically on-site survey, including recent (post 2016) high resolution lidar with additional on-site ground validation) DQF 2a : +/- >0.05m to 0.10m vertical accuracy (Typically recent standard lidar survey - post 2016) DQF 2b : +/- >0.05m to 0.15m vertical accuracy (Typically lidar surveyed between 2004 and 2016, or photogrammetry) DQF 3 : +/- 0.15m to 0.75m vertical accuracy (Typically older (pre-2004) lidar or Photogrammetry) DQF 4 : +/- 0.75m or more vertical accuracy DQF 0 : unknown quality | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetHeightDQF | 26-02-2024 View history Request changes |
Asset Height DQF Date The date the Asset Height DQF attribute was input. Mandatory if an Asset Height value is present. | Date | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetHeightDQFDate | 26-02-2024 View history Request changes |
Asset ID The Asset ID from the AIMS OM system, if known. For new assets that are not yet in AIMS OM, use "n/a". | Text Max Length: 50 | EA2 | P01 Registration | Yes | Feature.Attribute.Name.AssetID | 14-06-2021 View history Request changes |
Asset Length The length of the asset | Number Max: 10,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetLength | 17-10-2023 View history Request changes |
Asset Length DQF Data Quality Flag for the Asset Length attribute. Mandatory if an Asset Length value is present. | Picklist DQF 1 : +/- 0.01m to 0.05m horizontal accuracy (Typically on-site survey) DQF 2 : +/- >0.05m to 0.25m horizontal accuracy (Typically Lidar Point Cloud or Photogrammetry) DQF 3 : +/- 0.25m to 0.50m horizontal accuracy (Typically Lidar raster DEMs or Photogrammetry) DQF 4 : +/- 0.50m to 1.0m horizontal accuracy (Typically captured from OS Mapping (e.g. MasterMap 2023)) DQF 5 : >1m horizontal accuracy (Typically Google Maps etc) DQF 0 : unknown quality | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetLengthDQF | 26-02-2024 View history Request changes |
Asset Length DQF Date The date the Asset Length DQF attribute was input. Mandatory if an Asset Length value is present. | Date | EA3 | P01 Registration | No | Feature.Attribute.Name.AssetLengthDQFDate | 26-02-2024 View history Request changes |
Asset Name The name of the asset if it has one | Text Max Length: 150 | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetName | 27-04-2021 View history Request changes |
Asset Ref Unique asset reference code in scheme context assigned by scheme designer, e.g. MV0123 | Text Asset code MV + sequence number | EA2 | P01 Registration | No | Feature.Attribute.Name.AssetRef | 27-04-2021 View history Request changes |
Asset Risk Value The Risk Value is calculated as the Risk Variance multiplied by the Estimated Avoided Damages Value. Only applicable when MEICA Elements Present = True | Number Max: 99,999,999,999.00 Min: -99,999,999,999.00 Number of decimal places: 2 Units: pounds | EA7 | P15 Inspection | No | Feature.Attribute.Name.AssetRiskValue | 27-04-2021 View history Request changes |
Asset Risk Variance The Risk Variance is calculated using the following formula: ((Factored Availability / FRMS 'MEICA Condition Target') - 1) * Used House Equivalent. Only applicable when MEICA Elements Present = True | Number Max: 999,999.00 Min: -999,999.00 Number of decimal places: 2 | EA7 | P15 Inspection | No | Feature.Attribute.Name.AssetRiskVariance | 27-04-2021 View history Request changes |
Asset Start Date The date the asset becomes operational | Date | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetStartDate | 27-04-2021 View history Request changes |
Asset Start Date DQF Data Quality Flag for the Asset Start Date attribute. Mandatory if an Asset Start Date value is present. | Picklist DQF 1 : Start Date known based on documented evidence (use 1st of month if day uncertain and June if month uncertain) DQF 2 : Start Date estimated based on local knowledge (use 1st of month if day uncertain and June if month uncertain) DQF 3 : Start Date estimated by decade (use 1st Jan and middle year of decade e.g. 01/01/1965) DQF 4 : Start Date from legacy system DQF 5 : Start date checked but unknown (leave date blank) DQF 0 : unknown quality (given to all existing AIMS OM Start Date) | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetStartDateDQF | 26-02-2024 Picklist edited 22-08-2024 View history Request changes |
Asset Start Date DQF Date The date the Asset Start Date DQF attribute was input. Mandatory if an Asset Start Date value is present. | Date | EA7 | P01 Registration | No | Feature.Attribute.Name.AssetStartDateDQFDate | 26-02-2024 View history Request changes |
Asset Status The status of the asset | Picklist Active Discontinued New asset record for review No longer in use, but still on site Proposed asset Under construction | EA5 | P01 Registration | Yes | Feature.Attribute.Name.AssetStatus | 27-04-2021 Picklist edited 18-04-2024 View history Request changes |
Asset Status Date The date the status of the asset was assessed | Date | EA5 | P01 Registration | Yes | Feature.Attribute.Name.AssetStatusDate | 27-04-2021 View history Request changes |
Asset Type The type of asset | Picklist Wind Power Generator | EA2 | P01 Registration | Yes | Feature.Attribute.Name.AssetType | 27-04-2021 View history Request changes |
Baseline Carbon The baseline CO2 calculation based on the kWh baseline (multiplied by an agreed conversion factor) | Number Max: 999,999.99 Min: 0.00 Number of decimal places: 2 Units: kgCO2 | EA7 | P08 Impacts | No | Feature.Attribute.Name.BaselineCarbon | 27-04-2021 View history Request changes |
Baseline Consumption The baseline power consumption | Number Max: 999,999.99 Min: 0.00 Number of decimal places: 2 Units: kWh | EA7 | P08 Impacts | No | Feature.Attribute.Name.BaselineConsumption | 27-04-2021 View history Request changes |
Baseline Cost The expected energy cost for the asset | Number Max: 999,999.99 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P08 Impacts | No | Feature.Attribute.Name.Baseline | 27-04-2021 View history Request changes |
Below Required Condition (BRC) Is the Asset below required condition? | Boolean | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.BelowRequiredConditionBRC | 28-08-2024 View history Request changes |
Bounding Box A geospatial orthogonal bounding box cube containing the extent of the asset. This is to be expressed as a JSON lineString: [[lower left point easting,lower left point northing,lowest point elevation],[upper right point easting,upper right point northing,highest point elevation]] of the cube with geoCOBie Unit of 'bbox:EPSG7405:ETRS89:OSTN15:OSGM15' | Geometry Units: bbox:EPSG7405:ETRS89:OSTN15:OSGM15 | EA2 | P01 Registration | No | Feature.Attribute.Name.BoundingBox | 05-09-2022 View history Request changes |
BRC Date The date that the Asset was inspected to be below required condition. Only available if Below Required Condition = Yes | Date | EA7 | P09 Operations | No | Feature.Attribute.Name.BRCDate | 04-05-2021 View history Request changes |
Calculated Asset Availability The Calculated Asset Availability is the value of asset availability which is used in further calculations, e.g. to compare against target. It is either the default value of Asset Availability or the Overridden Equivalent if this is used. Only applicable when MEICA Elements Present = True | Number Max: 1.00 Min: 0.00 Number of decimal places: 2 | EA7 | P09 Operations | No | Feature.Attribute.Name.CalculatedAssetAvailability | 27-04-2021 View history Request changes |
Calculated Condition The overall calculated condition of the asset based on the actual condition of the elements and the element weightings | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.CalculatedCondition | 27-04-2021 View history Request changes |
Candidate for Decommissioning Is the asset a Candidate for Decommissioning? This includes the asset being a candidate for discontinuation or being a candidate for the Environment Agency withdrawing maintenance from the asset. | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.CandidateforDecommissioning | 22-08-2024 View history Request changes |
Change Reason The reason the asset's status has been changed. Mandatory when Reason for Asset Discontinued = Other. | Text Max Length: 500 | EA7 | P09 Operations | No | Feature.Attribute.Name.ChangeReason | 26-02-2024 View history Request changes |
Comments Other comments about the asset | Text Max Length: 2000 | EA2 | P09 Operations | No | Feature.Attribute.Name.Comments | 27-04-2021 View history Request changes |
Completion Date The date that the inspection or assessment was completed | Date | EA7 | P15 Inspection | No | Feature.Attribute.Name.CompletionDate | 27-04-2021 View history Request changes |
Condition Measure The Condition Measure is the highest value in the ConditionThreshold table that is less than or equal to the Asset Availability. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P15 Inspection | No | Feature.Attribute.Name.ConditionMeasure | 27-04-2021 View history Request changes |
Condition Target A condition target against which to compare the Condition Measure. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P15 Inspection | No | Feature.Attribute.Name.ConditionTarget | 27-04-2021 View history Request changes |
Confined Spaces Is the site on the Confined Spaces Register? | Boolean | EA3 | P09 Operations | Yes | Feature.Attribute.Name.ConfinedSpaces | 27-04-2021 View history Request changes |
Control LineString A spatial lineString that locates the asset and further classified by the associated LineStringType attribute confirming its relative location to the asset. A lineString is a series of design or measured spatial triple points (easting, northing, elevation) each connected by a single non-crossing line, with single points at each end, that locate an asset. A lineString is expressed as a JSON array of type geoJSON lineString, e.g. [[x1,y1,z1],[x2,y2,z2],...] It is further classified by the associated LineStringType attribute confirming its relative location to the asset. Interim points should be spaced at a maximum of 2m for lines < 10m in length, or 10m otherwise. LineStrings may be open as in the case of linear asset types or closed (polygon) in the case of land or site assets. For linear assets, see the note in the description above about the maximum length. The default CRS is a 3D CRS to EPSG 7405 with confirmed type, European reference frame and UK OS transformation with geoCOBie Unit of 'LineString:EPSG7405:ETRS89:OSTN15:OSGM15' | Geometry Units: LineString:EPSG7405:ETRS89:OSTN15:OSGM15 | EA2 | P02 Compliance | No | Feature.Attribute.Name.ControlLineString | 05-09-2022 View history Request changes |
County The county within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 300 | Auto | P09 Operations | No | Feature.Attribute.Name.County | 27-04-2021 View history Request changes |
Current Condition The current condition of the asset | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P09 Operations | No | Feature.Attribute.Name.CurrentCondition | 27-04-2021 View history Request changes |
Date Started The date that the inspection or assessment started | Date | EA7 | P15 Inspection | No | Feature.Attribute.Name.DateStarted | 27-04-2021 View history Request changes |
Default AP Team The default Asset Performance team for inspections. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W) | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultAPTeam | 16-01-2024 View history Request changes |
Default AP Team Email Address The email address of the default Asset Performance team. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 500 | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultAPTeamEmailAddress | 16-01-2024 View history Request changes |
Default Field Team The default Field team carrying our work on this Asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist Anglian EA Ops-CLA-FCRM OPS-Asset Perf R Valley E&W Lancs EA Ops-CLA-FCRM OPS-Asset Perf S Lakes Lune Fylde EA Ops-CLA-FCRM OPS-Asset Perf W Cumbria & Eden EA Ops-CLA-FCRM OPS-Field N Cumbria EA Ops-CLA-FCRM OPS-Field N Lancs EA Ops-CLA-FCRM OPS-Field N Merseyside EA Ops-CLA-FCRM OPS-Field S Cumbria EA Ops-CLA-FCRM OPS-Field W Lancs EA Ops-CLA-FCRM OPS-Mgt EA Ops-DCS-FCRM OPS-Asset Perf Central EA Ops-DCS-FCRM OPS-Asset Perf East EA Ops-DCS-FCRM OPS-Asset Perf North EA Ops-DCS-FCRM OPS-Asset Perf West EA Ops-DCS-FCRM OPS-Field Central EA Ops-DCS-FCRM OPS-Field East EA Ops-DCS-FCRM OPS-Field Mid EA Ops-DCS-FCRM OPS-Field North EA Ops-DCS-FCRM OPS-Field South EA Ops-DCS-FCRM OPS-Field West EA Ops-DCS-FCRM OPS-Mgt EA Ops-EAN-FCRM OPS Essex-Asset Perf Blackwater EA Ops-EAN-FCRM OPS Essex-Asset Perf St & Col EA Ops-EAN-FCRM OPS Essex-Asset Perf Th Ch & B EA Ops-EAN-FCRM OPS Essex-Field Chel Blkw'tr EA Ops-EAN-FCRM OPS Essex-Field Colne EA Ops-EAN-FCRM OPS Essex-Field MEICA EA Ops-EAN-FCRM OPS Essex-Field Stour EA Ops-EAN-FCRM OPS Essex-Field Thameside EA Ops-EAN-FCRM OPS Essex-Mgt EA Ops-EAN-FCRM OPS N&S-Asset Perf Broadland EA Ops-EAN-FCRM OPS N&S-Asset Perf Norfolk EA Ops-EAN-FCRM OPS N&S-Asset Perf Suffolk EA Ops-EAN-FCRM OPS N&S-Field N Norfolk EA Ops-EAN-FCRM OPS N&S-Field N Suffolk EA Ops-EAN-FCRM OPS N&S-Field S Norfolk EA Ops-EAN-FCRM OPS N&S-Field S Suffolk EA Ops-EAN-FCRM OPS N&S-Mgt EA Ops-EAN-FCRM OPS West-Asset Perf Bedford EA Ops-EAN-FCRM OPS West-Asset Perf Ely EA Ops-EAN-FCRM OPS West-Asset Perf Kings Lynn EA Ops-EAN-FCRM OPS West-Field Bedford EA Ops-EAN-FCRM OPS West-Field Ely EA Ops-EAN-FCRM OPS West-Field Kings Lynn EA Ops-EAN-FCRM OPS West-Field MEICA EA Ops-EAN-FCRM OPS West-Field Ouse Washes EA Ops-EAN-FCRM OPS West-Mgt EA Ops-EMD-FCRM OPS North-Asset Perf EA Ops-EMD-FCRM OPS North-Field Askham EA Ops-EMD-FCRM OPS North-Field Owston Ferry 1 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 2 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 3 EA Ops-EMD-FCRM OPS North-Field Owston Ferry 4 EA Ops-EMD-FCRM OPS North-Mgt EA Ops-EMD-FCRM OPS South-Asset Perf East EA Ops-EMD-FCRM OPS South-Asset Perf South EA Ops-EMD-FCRM OPS South-Asset Perf West EA Ops-EMD-FCRM OPS South-Field Draycott EA Ops-EMD-FCRM OPS South-Field Nottingham EA Ops-EMD-FCRM OPS South-Field Rothley EA Ops-EMD-FCRM OPS South-Mgt EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf EA Ops-GMC-FCRM OPS Gtr Mcr-Asset Perf Plg&AM EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 1 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 2 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 3 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 4 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 5 EA Ops-GMC-FCRM OPS Gtr Mcr-Field Sale 6 EA Ops-GMC-FCRM OPS Gtr Mcr-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Asset Perf EA Ops-GMC-FCRM OPS M'y&Ch-Field Cheshire EA Ops-GMC-FCRM OPS M'y&Ch-Field Confined space EA Ops-GMC-FCRM OPS M'y&Ch-Field M'yside EA Ops-GMC-FCRM OPS M'y&Ch-Mgt EA Ops-GMC-FCRM OPS M'y&Ch-Supra Area MEICA EA Ops-HNL-FCRM OPS East-Asset Perf Lower Lee & Roding EA Ops-HNL-FCRM OPS East-Asset Perf Upper Lee & Stort EA Ops-HNL-FCRM OPS East-Field Lower Lee EA Ops-HNL-FCRM OPS East-Field Lower Roding EA Ops-HNL-FCRM OPS East-Field Middle Lee EA Ops-HNL-FCRM OPS East-Field Upper Lee&Stort EA Ops-HNL-FCRM OPS East-Mgt EA Ops-HNL-FCRM OPS West-Asset Perf Colne Brent Crane EA Ops-HNL-FCRM OPS West-Field Lower Colne EA Ops-HNL-FCRM OPS West-Field Upper Colne EA Ops-HNL-FCRM OPS West-Mgt EA Ops-HNL-FCRM OPS West-Supra Area MEICA EA Ops-KSL-FCRM OPS East Kent-Asset Perf Rom EA Ops-KSL-FCRM OPS East Kent-Asset Perf Stour EA Ops-KSL-FCRM OPS East Kent-Field Romney EA Ops-KSL-FCRM OPS East Kent-Field Rother EA Ops-KSL-FCRM OPS East Kent-Field Stour EA Ops-KSL-FCRM OPS East Kent-Field Swale EA Ops-KSL-FCRM OPS East Kent-Mgt EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Med EA Ops-KSL-FCRM OPS SLN & WK-Asset Perf Mole EA Ops-KSL-FCRM OPS SLN & WK-Field Medway EA Ops-KSL-FCRM OPS SLN & WK-Field Mole EA Ops-KSL-FCRM OPS SLN & WK-Field N Kent EA Ops-KSL-FCRM OPS SLN & WK-Field SLN EA Ops-KSL-FCRM OPS SLN & WK-Mgt EA Ops-KSL-FCRM TTD-Asset Perf Thms Barrier EA Ops-KSL-FCRM TTD-Asset Perf Tidal Walls EA Ops-KSL-FCRM TTD-Info Centre EA Ops-KSL-FCRM TTD-MEICA EA Ops-KSL-FCRM TTD-MEICA Electrical EA Ops-KSL-FCRM TTD-MEICA Field EA Ops-KSL-FCRM TTD-MEICA Forecasting EA Ops-KSL-FCRM TTD-MEICA Mechanical EA Ops-KSL-FCRM TTD-MEICA Operations & Maintenance EA Ops-KSL-FCRM TTD-Mgt EA Ops-KSL-FCRM TTD-Projects & Contracts Mgt EA Ops-KSL-FCRM TTD-Security EA Ops-LNA-FCRM OPS Lincs-Asset Perf SHEC EA Ops-LNA-FCRM OPS Lincs-Asset Perf Witham EA Ops-LNA-FCRM OPS Lincs-Field Mablethorpe EA Ops-LNA-FCRM OPS Lincs-Field Short Ferry EA Ops-LNA-FCRM OPS Lincs-Field South Ferriby EA Ops-LNA-FCRM OPS Lincs-Field Swinehead EA Ops-LNA-FCRM OPS Lincs-Mgt EA Ops-LNA-FCRM OPS W&N-Asset Perf EA Ops-LNA-FCRM OPS W&N-Field Kettering EA Ops-LNA-FCRM OPS W&N-Field MEICA EA Ops-LNA-FCRM OPS W&N-Field Spalding EA Ops-LNA-FCRM OPS W&N-Mgt EA Ops-LNA-FCRM OPS W&N-Supra Area MEICA EA Ops-NEA-FCRM OPS-Asset Perf Northumberland EA Ops-NEA-FCRM OPS-Asset Perf Tees EA Ops-NEA-FCRM OPS-Asset Perf Tyne & Wear EA Ops-NEA-FCRM OPS-Field Durham EA Ops-NEA-FCRM OPS-Field Tees EA Ops-NEA-FCRM OPS-Field Tyne EA Ops-NEA-FCRM OPS-Field Wear EA Ops-NEA-FCRM OPS-Mgt EA Ops-SSD-FCRM OPS East-Asset Perf Adur&Arun EA Ops-SSD-FCRM OPS East-Asset Perf Ouse Pev EA Ops-SSD-FCRM OPS East-Field Adur & Arun EA Ops-SSD-FCRM OPS East-Field Pevensey EA Ops-SSD-FCRM OPS East-Field Seaford EA Ops-SSD-FCRM OPS East-Mgt EA Ops-SSD-FCRM OPS West-Asset Perf EH & CH EA Ops-SSD-FCRM OPS West-Asset Perf H&IOW EA Ops-SSD-FCRM OPS West-Field Chichester EA Ops-SSD-FCRM OPS West-Field E Hants EA Ops-SSD-FCRM OPS West-Field W Hants EA Ops-SSD-FCRM OPS West-Mgt EA Ops-SSD-FCRM OPS West-Supra Area MEICA EA Ops-THM-FCRM OPS Lower-Asset Perf Jubilee EA Ops-THM-FCRM OPS Lower-Asset Perf Thames EA Ops-THM-FCRM OPS Lower-Field Depots SE EA Ops-THM-FCRM OPS Lower-Field Loddon & Jubilee EA Ops-THM-FCRM OPS Lower-Field MEICA EA Ops-THM-FCRM OPS Lower-Field Surrey Berks EA Ops-THM-FCRM OPS Lower-Field Wey EA Ops-THM-FCRM OPS Lower-Mgt EA Ops-THM-FCRM OPS Upper-Asset Perf Oxon EA Ops-THM-FCRM OPS Upper-Asset Perf W Thames EA Ops-THM-FCRM OPS Upper-Field Cher Thame Wye EA Ops-THM-FCRM OPS Upper-Field Cotswold & Vale EA Ops-THM-FCRM OPS Upper-Field Kenn & Mid Thames EA Ops-THM-FCRM OPS Upper-Field Thames Oxon EA Ops-THM-FCRM OPS Upper-Mgt EA Ops-WMD-FCRM OPS East-Asset Perf North EA Ops-WMD-FCRM OPS East-Asset Perf South EA Ops-WMD-FCRM OPS East-Field Bham and BC EA Ops-WMD-FCRM OPS East-Field Staffs EA Ops-WMD-FCRM OPS East-Field Warks EA Ops-WMD-FCRM OPS East-Mgt EA Ops-WMD-FCRM OPS West-Asset Perf North EA Ops-WMD-FCRM OPS West-Asset Perf South EA Ops-WMD-FCRM OPS West-Field Glouc EA Ops-WMD-FCRM OPS West-Field ShrWest & Hereford EA Ops-WMD-FCRM OPS West-Field Worcs EA Ops-WMD-FCRM OPS West-Mgt EA Ops-WSX-FCRM OPS E-Asset Perf Bristol EA Ops-WSX-FCRM OPS E-Asset Perf South EA Ops-WSX-FCRM OPS E-Field Avon & Stour EA Ops-WSX-FCRM OPS E-Field Bristol EA Ops-WSX-FCRM OPS E-Field Frome & SW Dorset EA Ops-WSX-FCRM OPS E-Field Upper Avon EA Ops-WSX-FCRM OPS E-Mgt EA Ops-WSX-FCRM OPS W-Asset Perf N Somerset EA Ops-WSX-FCRM OPS W-Asset Perf S Somerset EA Ops-WSX-FCRM OPS W-Field Axe & N Somerset EA Ops-WSX-FCRM OPS W-Field Bawdrip EA Ops-WSX-FCRM OPS W-Field Brue EA Ops-WSX-FCRM OPS W-Field Parrett EA Ops-WSX-FCRM OPS W-Field Tone & W Somerset EA Ops-WSX-FCRM OPS W-Mgt EA Ops-WSX-FCRM OPS W-Supra Area MEICA EA Ops-YOR-FCRM OPS N&EY-Asset Perf D&E EA Ops-YOR-FCRM OPS N&EY-Asset Perf H&H EA Ops-YOR-FCRM OPS N&EY-Asset Perf SUNOW EA Ops-YOR-FCRM OPS N&EY-Field Derwent & Esk EA Ops-YOR-FCRM OPS N&EY-Field LH&H EA Ops-YOR-FCRM OPS N&EY-Field Ouse & Wharfe EA Ops-YOR-FCRM OPS N&EY-Field Swale Ure & Nidd EA Ops-YOR-FCRM OPS N&EY-Field Upper Hull EA Ops-YOR-FCRM OPS N&EY-Mgt EA Ops-YOR-FCRM OPS W&SY-Asset Perf LA&LD EA Ops-YOR-FCRM OPS W&SY-Asset Perf UA&CAL EA Ops-YOR-FCRM OPS W&SY-Asset Perf UD&RO EA Ops-YOR-FCRM OPS W&SY-Field Lower Aire EA Ops-YOR-FCRM OPS W&SY-Field Lower Don EA Ops-YOR-FCRM OPS W&SY-Field UA&C EA Ops-YOR-FCRM OPS W&SY-Field UD&R EA Ops-YOR-FCRM OPS W&SY-Mgt EA Ops-YOR-FCRM OPS-Supra Area MEICA GMMYCH - AP North KSL & HNL Midlands North East North West South West SSD & WT WTHMS - AP Lower Tribs WTHMS - AP Upper Tribs YORKS - AP catchment assets team (N&E) YORKS - AP catchment assets team (S&W) | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultFieldTeam | 16-01-2024 View history Request changes |
Default Field Team Email Address The email address of the default Field team. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 500 | Auto | P15 Inspection | No | Feature.Attribute.Name.DefaultFieldTeamEmailAddress | 16-01-2024 View history Request changes |
Default Geo Type The default geographic feature type of the asset in AIMS OM | Picklist Point | EA2 | P09 Operations | Yes | Feature.Attribute.Name.DefaultGeoType | 02-12-2022 View history Request changes |
Delivery Date The date that the asset was delivered | Date | EA4 | P09 Operations | No | Feature.Attribute.Name.DeliveryDate | 27-04-2021 View history Request changes |
Description A brief description of the asset and/or its construction type | Text Max Length: 400 | EA2 | P09 Operations | No | Feature.Attribute.Name.Description | 27-04-2021 View history Request changes |
Down Time Cost How much will it cost per day if the asset is not available? | Number Max: 100,000.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P08 Impacts | No | Feature.Attribute.Name.DownTimeCost | 27-04-2021 View history Request changes |
EA Water Management Area The Area the Asset is located in | Picklist Cumbria and Lancashire Devon Cornwall and the Isles of Scilly East Anglia East Midlands Greater Manchester Merseyside and Cheshire Hertfordshire and North London Kent South London and East Sussex Lincolnshire and Northamptonshire North East Solent and South Downs Thames Wessex West Midlands Yorkshire | EA7 | P09 Operations | Yes | Feature.Attribute.Name.EAWaterManagementArea | 27-04-2021 View history Request changes |
Easting The easting of the asset's geographic location (British National Grid) | Number Max: 700,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.Easting | 27-04-2021 View history Request changes |
End of Life Liabilities How much an asset will eventually cost to decommission (e.g. how much it will cost to demolish or make safe, how much we would need to pay to get out of a signed maintenance agreement, etc) | Number Max: 9,999,999,999.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA7 | P09 Operations | No | Feature.Attribute.Name.EndofLifeLiabilities | 27-04-2021 View history Request changes |
Exclude from External Publication Should the asset be excluded from being shared publicly? E.g. if the values recorded are sensitive information, personal information or contact details. | Boolean | EA7 | P06 Security | Yes | Feature.Attribute.Name.ExcludefromExternalPublication | 17-07-2023 View history Request changes |
Factored Availability The Factored Availability is defined as the Asset Availability multiplied by the Asset Element Class value of each active Asset Element on the asset raised to the power of the number of active assets on the asset. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P09 Operations | No | Feature.Attribute.Name.FactoredAvailability | 27-04-2021 View history Request changes |
FCRM Asset Target Condition The FCRM target condition of the Asset. Only applicable where the element is maintained by Flood and Coastal Risk Management (FCRM) | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P09 Operations | No | Feature.Attribute.Name.FCRMAssetTargetCondition | 28-08-2024 View history Request changes |
FCRM Strategically Important Asset (SIA) Is the Asset an FCRM Strategically Important Asset? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.FCRMStrategicallyImportantAssetSIA | 27-04-2021 View history Request changes |
FCRM Strategically Important Asset (SIA) Band The banding of the SIA. Mandatory where FCRM Strategically Important Asset (SIA) = True | Picklist A B C | EA7 | P09 Operations | No | Feature.Attribute.Name.FCRMStrategicallyImportantAssetSIABand | 27-04-2021 View history Request changes |
Final Asset Condition The final recorded condition of the asset after inspection and any manual override. | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | No | Feature.Attribute.Name.FinalAssetCondition | 27-04-2021 View history Request changes |
FRMS The name and code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMS | 16-01-2024 View history Request changes |
FRMS Code The code of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 10 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMSCode | 16-01-2024 View history Request changes |
FRMS Consequence A measure of the vulnerability of the FRMS to failures of assets, considering the time lag between failure and flooding occuring, and critical infrastructure that may be affected as well as houses. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist HIGHC01 HIGHC02 HIGHC03 HIGHC04 HIGHC08 MEDC06 MEDC07 MEDC12 LOWC05 LOWC09 LOWC10 LOWC11 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMSConsequence | 16-01-2024 View history Request changes |
FRMS Name The name of the Flood Risk Management System covering the asset. Only applicable when one of the asset's purposes is Flood Risk Management. | Text Max Length: 37 | Auto | P09 Operations | No | Feature.Attribute.Name.FRMSName | 16-01-2024 View history Request changes |
FWM Act Designated Is the asset designated under the Floods and Water Management Act 2020? | Picklist Yes No | EA7 | P02 Compliance | No | Feature.Attribute.Name.FWMActDesignated | 27-04-2021 View history Request changes |
House Equivalent A measure of the number of residential properties at increased risk of flooding if the asset is below target condition, which is calculated by default as 10% of the '100 year houses at risk' value from the FRMS. Only applicable when MEICA Elements Present = True | Number Max: 999,999.00 Min: 0.00 Number of decimal places: 2 | EA7 | P09 Operations | No | Feature.Attribute.Name.HouseEquivalent | 27-04-2021 View history Request changes |
Insp Freq EIC Inspection The required frequency of inspection to be conducted by the Engineering Inspection Coordinator. Only applicable when MEICA Elements Present = True | Number Max: 999,999,999 Min: 0 Number of decimal places: 0 Units: months | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspFreqEICInspection | 26-02-2024 View history Request changes |
Insp Freq PUWER The required frequency of Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. | Number Max: 999,999,999 Min: 0 Number of decimal places: 0 Units: months | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspFreqPUWER | 17-10-2023 View history Request changes |
Insp Freq Visual The required frequency of visual inspection. | Number Max: 999,999,999 Min: 0 Number of decimal places: 0 Units: months | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspFreqVisual | 17-10-2023 View history Request changes |
Inspection Comments Any specific comments related to the inspection or assessment that are worth noting | Text Max Length: 600 | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.InspectionComments | 27-04-2021 View history Request changes |
Inspection ID The identification number for the individual instance of inspection. | Text Max Length: 50 | EA7 | P15 Inspection | Yes | Feature.Attribute.Name.InspectionID | 27-04-2021 View history Request changes |
Inspection Type The type of inspection to be conducted. | Picklist Ad Hoc Culvert Internal Inspection Ad Hoc EIC Inspection Ad Hoc PSRA Land Water Ad Hoc PSRA Tree Ad Hoc Visual Asset Inspection Culvert Internal Inspection EIC Inspection MEICA site safety and operation inspection MRM Inspection PSRA Assessment PSRA Land Water PSRA Tree PSRA Tree Assessment PUWER Inspection Section 10 Reservoir Inspection Section 12 Reservoir Inspection Site Inspection - 6 month Transition Inspection Visual Asset Inspection | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionType | 27-04-2021 View history Request changes |
Inspection Unit (EIC) The inspection unit of inspection to be conducted by the Engineering Inspection Coordinator. Populated via a picklist in AIMS OM. Only applicable when MEICA Elements Present = True | Text Max Length: 100 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionUnitEIC | 26-02-2024 View history Request changes |
Inspection Unit (PUWER) The inspecton unit reference number for Provisions of Use and Work Equipment Regulations (PUWER) inspection. Only applicable when MEICA Elements Present = True. Populated via a picklist in AIMS OM. | Text Max Length: 100 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionUnitPUWER | 27-04-2021 View history Request changes |
Inspection Unit (Visual) The inspecton unit reference for visual inspection. Populated via a picklist in AIMS OM. | Text Max Length: 100 | EA7 | P15 Inspection | No | Feature.Attribute.Name.InspectionUnitVisual | 27-04-2021 View history Request changes |
Inspector The name of the Asset Inspector who is conductng the inspection. This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA7 | P15 Inspection | No | Feature.Attribute.Name.Inspector | 19-06-2024 View history Request changes |
Interested Party The details for any parties that have a particular interest in the asset. Set of linked fields for each interested party: Party Type (Individial, Organisation), Party, Preferred Contact Method (Email, In Person, Mail, Phone, Text), Address, Post Code, Phone Number 1, Phone Number 2, Fax Number, E-Mail, Consent Obtained, Landowner? | Link | EA7 | P02 Compliance | No | Feature.Attribute.Name.InterestedParty | 27-04-2021 View history Request changes |
Internal Drainage Board (IDB) The Internal Drainage Board within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 100 | Auto | P02 Compliance | No | Feature.Attribute.Name.InternalDrainageBoardIDB | 27-04-2021 View history Request changes |
Key / Access Card Details Details of the key or access card that is required to gain entry. Applicable where Key / Access Card Required = Yes | Text Max Length: 100 | EA7 | P02 Compliance | No | Feature.Attribute.Name.KeyAccessCardDetails | 27-04-2021 View history Request changes |
Key / Access Card Required? Is a key or access card required to gain entry? | Picklist Yes No | EA7 | P02 Compliance | No | Feature.Attribute.Name.KeyAccessCardRequired | 27-04-2021 View history Request changes |
KPI881 - Inspections - FCRM 2.3 Is the asset included in the KPI881 (Inspections) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI881Inspections | 27-04-2021 View history Request changes |
KPI885 - Public Safety Sites Is the asset included in the KPI885 (Public safety sites) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI885PublicSafetySites | 27-04-2021 View history Request changes |
KPI962 - Maintaining above required condition - FCRM 1.3 Is the asset included in the KPI962 (Maintaining above required condition) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI962Maintainingaboverequiredcondition | 27-04-2021 View history Request changes |
KPI965 - Conveyance - FCRM 2.8 Is the asset included in the KPI965 (Conveyance) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI965Conveyance | 27-04-2021 View history Request changes |
KPI965 - Households at risk - FCRM 2.5 Is the asset included in the KPI965 (Households at risk) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI965Householdsatrisk | 27-04-2021 View history Request changes |
KPI970 - Performance vs Engineering deadline - FCRM 2.6 Is the asset included in the KPI970 (Performance vs engineering deadline) report? | Boolean | EA7 | P02 Compliance | Yes | Feature.Attribute.Name.KPI970PerformancevsEngineeringdeadline | 27-04-2021 View history Request changes |
Landowner Contact Required Is contact with the landowner needed in order to gain entry? | Picklist Yes No | EA7 | P02 Compliance | No | Feature.Attribute.Name.LandownerContactRequired | 27-04-2021 View history Request changes |
Last Routine Inspection The AIMS OM reference (GUID) of the last recorded routine inspection. | Text Max Length: 32 | EA7 | P15 Inspection | No | Feature.Attribute.Name.LastRoutineInspection | 27-04-2021 View history Request changes |
Last Visual Inspection The AIMS OM reference (GUID) of the last recorded visual inspection. | Text Max Length: 32 | EA7 | P15 Inspection | No | Feature.Attribute.Name.LastVisualInspection | 27-04-2021 View history Request changes |
Last Visual Inspection Comments Comments on the last visual inspection | Text Max Length: 500 | EA7 | P15 Inspection | No | Feature.Attribute.Name.LastVisualInspectionComments | 27-04-2021 View history Request changes |
Latitude The latitude of the asset's geographic location | Number Max: 56.000000 Min: 49.000000 Number of decimal places: 6 Units: degrees | Auto | P09 Operations | Yes | Feature.Attribute.Name.Latitude | 27-04-2021 View history Request changes |
Legacy CMMS ID The element's ID from the legacy CMMS system. Applicable where asset has MEICA maintained elements. | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.LegacyCMMSID | 27-04-2021 View history Request changes |
Legacy MEICA Site / Asset Name The element's legacy MEICA site or asset name. Applicable where asset has MEICA maintained elements. | Text Max Length: 100 | Auto | P09 Operations | No | Feature.Attribute.Name.LegacyMEICASiteAssetName | 27-04-2021 View history Request changes |
Likelihood of Failure What is the likelihood of failure of the asset? | Picklist Failure imminent - 50% chance within 12 months Likely - 20% chance within 24 months Possible - 5% chance within 24 months Unlikely - 0.5% chance within 60 months | EA7 | P09 Operations | No | Feature.Attribute.Name.LikelihoodOfFailure | 27-04-2021 View history Request changes |
LineString Type The type of the Control LineString | Picklist Axial Crest Invert | EA2 | P08 Impacts | No | Feature.Attribute.Name.LineStringType | 27-04-2021 View history Request changes |
Local Authority The local authority within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 300 | Auto | P09 Operations | No | Feature.Attribute.Name.LocalAuthority | 27-04-2021 View history Request changes |
Location The location of the asset, for example: nearest town and/or distance downstream of named bridge | Text Max Length: 400 | EA2 | P09 Operations | No | Feature.Attribute.Name.Location | 27-04-2021 View history Request changes |
Longitude The longitude of the asset's geographic location | Number Max: 2.000000 Min: -7.000000 Number of decimal places: 6 Units: degrees | Auto | P09 Operations | Yes | Feature.Attribute.Name.Longitude | 27-04-2021 View history Request changes |
Maintainer The organisation or private individual recognised to be the maintainer of the asset. The maintainer is the organisation or person who manages, and provides for, the maintenance of the asset but they may instruct others to carry out works on their behalf. EA owned and maintained are categorised as EA maintained assets. Assets the EA do not own but maintain using its permissive powers, in accordance with Section 185 of the Water Resources Act 1991, are categorised as EA maintained assets. Note: Local Acts Of Parliament, covering the Rivers Thames and Hull, provide special powers to enforce a statutory duty on riparian owners regarding defence standards. This information is not mandatory if the asset is not maintained. This is a mandatory field where Not Maintained = No | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | No | Feature.Attribute.Name.Maintainer | 28-08-2024 View history Request changes |
Maintainer Date Change The date the Maintainer was changed. | Date | EA6 | P09 Operations | Yes | Feature.Attribute.Name.MaintainerDateChange | 18-12-2023 View history Request changes |
Maintainer Function Department within Maintaining Organisation | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA7 | P09 Operations | No | Feature.Attribute.Name.MaintainerFunction | 27-04-2021 View history Request changes |
Maintainer Reason for Change The reason the Maintainer was changed. | Picklist Abandonment Handover Incorrectly Recorded New Asset Record | EA6 | P09 Operations | Yes | Feature.Attribute.Name.MaintainerReasonForChange | 18-12-2023 View history Request changes |
Manufacturer The manufacturer of the asset | Text Max Length: 50 | EA4 | P09 Operations | No | Feature.Attribute.Name.Manufacturer | 27-04-2021 View history Request changes |
MEICA Condition Target A target value for the Factored Availability of an asset, based upon the FRMS Consequence. Only applicable when MEICA Elements Present = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P09 Operations | No | Feature.Attribute.Name.MEICAConditionTarget | 27-04-2021 View history Request changes |
MEICA Element Failed Applicable where MEICA Elements Present = True. Have any of the MEICA elements failed? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.MEICAElementFailed | 27-04-2021 View history Request changes |
MEICA Elements Present Are MEICA elements present on the asset? Attribute automatically populated based on whether the asset has any elements which are set as MEICA Maintained Elements. | Boolean | Auto | P09 Operations | Yes | Feature.Attribute.Name.MEICAElementsPresent | 05-09-2022 View history Request changes |
MEICA Supra-Area The MEICA Supra-Area covering the asset | Picklist Anglian KSL & HNL Midlands North East North West South West SSD & WT | EA7 | P09 Operations | No | Feature.Attribute.Name.MEICASupraArea | 27-04-2021 View history Request changes |
MEICA Team Email Address The email address of the MEICA team covering the asset | Text Max Length: 80 | EA7 | P09 Operations | No | Feature.Attribute.Name.MEICATeamEmailAddress | 27-04-2021 View history Request changes |
MP Constituency The parliamentary constituency within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 300 | Auto | P09 Operations | No | Feature.Attribute.Name.MPConstituency | 27-04-2021 View history Request changes |
Navigation Asset Target Condition The Navigation target condition of the Asset. Only applicable where the element is maintained by Navigation | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P09 Operations | No | Feature.Attribute.Name.NavigationAssetTargetCondition | 28-08-2024 View history Request changes |
NGR National Grid Reference. Will be populated by a spatial lookup | Text Max Length: 12 | Auto | P09 Operations | No | Feature.Attribute.Name.NGR | 27-04-2021 View history Request changes |
Northing The northing of the asset's geographic location (British National Grid) | Number Max: 700,000.00 Min: 0.00 Number of decimal places: 2 Units: metres | EA7 | P09 Operations | Yes | Feature.Attribute.Name.Northing | 27-04-2021 View history Request changes |
Operational Area The asset's Operational Area. Only applicable when one of the asset's purposes is Flood Risk Management. | Picklist NE - CMBLNC - FCRM OPS North NE - CMBLNC - FCRM OPS South NE - DBNTLS - FCRM OPS North NE - DBNTLS - FCRM OPS South NE - LCNNTH - FCRM OPS Lincs NE - LCNNTH - FCRM OPS W&N NE - NHUDUT - FCRM OPS NE - YORKS - FCRM OPS N&EY NE - YORKS - FCRM OPS W&SY SE - CAMBED - FCRM OPS SE - ESNFSF - FCRM OPS Essex SE - ESNFSF - FCRM OPS N&S SE - HTSNLN - FCRM OPS East SE - HTSNLN - FCRM OPS West SE - KNTSLN - FCRM OPS East Kent SE - KNTSLN - FCRM OPS SLN & WK SE - KNTSLN - FCRM TTD SE - SLTSDN - FCRM OPS East SE - SLTSDN - FCRM OPS West SE - WTHMS - FCRM OPS Lower SE - WTHMS - FCRM OPS Upper W - DVNCWL - FCRM OPS Devon & Cornwall - FCRM Ops W - GMMYCH - FCRM OPS W - SHHRWG - FCRM OPS W - STWKWM - FCRM OPS W - WESSEX - FCRM OPS E W - WESSEX - FCRM OPS W | Auto | P09 Operations | No | Feature.Attribute.Name.OperationalArea | 16-01-2024 View history Request changes |
Operator The organisation or private individual recognised to be the operator of the asset | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | Yes | Feature.Attribute.Name.Operator | 27-04-2021 Picklist edited 05-09-2022 View history Request changes |
Operator Date Change The date the Operator was changed. | Date | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OperatorDateChange | 18-12-2023 View history Request changes |
Operator Function Department of Operator | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA7 | P09 Operations | No | Feature.Attribute.Name.OperatorFunction | 27-04-2021 View history Request changes |
Operator Reason for Change The reason the Operator was changed. | Picklist Abandonment Handover Incorrectly Recorded New Asset Record | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OperatorReasonForChange | 18-12-2023 View history Request changes |
Overridden Equivalent A manually entered value for House Equivalent. Only applicable when MEICA Elements Present = True and Override = True | Number Max: 999,999.00 Min: 0.00 Number of decimal places: 2 | EA7 | P09 Operations | No | Feature.Attribute.Name.OverriddenEquivalent | 27-04-2021 View history Request changes |
Overridden Equivalent Asset Availability A manually entered value for Asset Factored Availability, to be used instead of the default calculation. Only applicable when MEICA Elements Present = True and Asset Availability Override = True | Number Max: 1.0000 Min: 0.0000 Number of decimal places: 4 | EA7 | P09 Operations | No | Feature.Attribute.Name.OverriddenEquivalentAssetAvailability | 27-04-2021 View history Request changes |
Override An indication of the use of a manually entered value for House Equivalent, instead of the value calculated by default from the FRMS. Only applicable when MEICA Elements Present = True | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.Override | 27-04-2021 View history Request changes |
Override Condition New condition of the asset after the override. Only applies when Override Calculated Condition = True | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | No | Feature.Attribute.Name.OverrideCondition | 27-04-2021 View history Request changes |
Owner The organisation or private individual known to be the owner of the asset | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | Yes | Feature.Attribute.Name.Owner | 27-04-2021 Picklist edited 05-09-2022 View history Request changes |
Owner Date Change The date the Owner was changed. | Date | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OwnerDateChange | 18-12-2023 View history Request changes |
Owner Function The Department within the Organisation with Owner responsibility | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA6 | P09 Operations | No | Feature.Attribute.Name.OwnerFunction | 27-04-2021 View history Request changes |
Owner Reason for Change The reason the Owner was changed. | Picklist Incorrectly Recorded New Asset Record Sale | EA6 | P09 Operations | Yes | Feature.Attribute.Name.OwnerReasonForChange | 18-12-2023 View history Request changes |
Parish Council The parish council within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 200 | Auto | P09 Operations | No | Feature.Attribute.Name.ParishCouncil | 27-04-2021 View history Request changes |
Permit to Work Required Is a permit to work required to work on the asset? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.PermitToWorkRequired | 27-04-2021 View history Request changes |
Photo A photograph or image related to the asset. | Photo | EA4 | P09 Operations | No | Feature.Attribute.Name.Photo | 17-07-2023 View history Request changes |
Post Code The postcode within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 15 | Auto | P09 Operations | No | Feature.Attribute.Name.PostCode | 27-04-2021 View history Request changes |
Previous Condition The previous condition of the Asset | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P15 Inspection | No | Feature.Attribute.Name.PreviousCondition | 27-04-2021 View history Request changes |
Primary Purpose The main purpose of the asset, i.e. the reason it was constructed (a natural asset may have an asset management purpose) | Picklist Business Support Conservation Environment Management Erosion Protection Fisheries Flood Risk Management Groundwater Investigation Site Groundwater Quality Groundwater Quantity Health and Safety Highways Legal / Statutory Leisure and Amenity Navigation Pollution Control Water Level Management Water Resources | EA2 | P09 Operations | Yes | Feature.Attribute.Name.PrimaryPurpose | 27-04-2021 Picklist edited 11-07-2024 View history Request changes |
PSRA System ID The ID (GUID) of the PSRA System Asset that the Asset is related to | Text Max Length: 32 | EA6 | P03 Risk management | No | Feature.Attribute.Name.PSRASystemID | 27-04-2021 View history Request changes |
PUWER? Do any of the elements of this asset require PUWER inspections? Only applicable when MEICA Elements Present = True | Boolean | EA7 | P03 Risk management | Yes | Feature.Attribute.Name.PUWER | 27-04-2021 View history Request changes |
Raw Condition The Granular Weighted Asset Condition | Number Max: 99,999.00 Min: 0.00 Number of decimal places: 2 | EA7 | P15 Inspection | No | Feature.Attribute.Name.RawCondition | 27-04-2021 View history Request changes |
Reason for Asset Discontinued The reason the asset has been marked as Discontinued. Only applicable when Asset Status = Discontinued. | Picklist Asset replaced Demolition Other Withholding repair following failure | EA7 | P09 Operations | No | Feature.Attribute.Name.ReasonForAssetDiscontinued | 26-02-2024 View history Request changes |
Reason for Candidate for Decommissioning The reason why the asset has been selected for Decommissioning. Applicable where Candidate for Decommissioning = True. | Text Max Length: 500 | EA7 | P09 Operations | No | Feature.Attribute.Name.ReasonforCandidateforDecommissioning | 22-08-2024 View history Request changes |
Regional Flood & Coastal Committee (RFCC) The Regional Flood & Coastal Committee within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.RegionalFloodCoastalCommitteeRFCC | 27-04-2021 View history Request changes |
Related Event Reference The reference of the event related to the inspection. This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA7 | P09 Operations | No | Feature.Attribute.Name.RelatedEventReference | 27-04-2021 View history Request changes |
Replacement Cost How much would the Asset cost to completely replace? | Number Max: 9,999,999,999.00 Min: 0.00 Number of decimal places: 2 Units: pounds | EA6 | P08 Impacts | No | Feature.Attribute.Name.ReplacementCost | 27-04-2021 View history Request changes |
Replacement Cost Assessment Date The date the replacement cost of the asset was assessed | Date | EA6 | P08 Impacts | No | Feature.Attribute.Name.ReplacementCostDate | 27-04-2021 View history Request changes |
Requirements Are there any further requirements of the asset? Can select multiple options | Picklist Abstraction FCRM Critical Hydropower Operational Water Resources | EA6 | P09 Operations | No | Feature.Attribute.Name.Requirements | 27-04-2021 View history Request changes |
Requirements Notes Notes about the further requirements | Text Max Length: 500 | EA7 | P09 Operations | No | Feature.Attribute.Name.RequirementsNotes | 27-04-2021 View history Request changes |
Residual Life The estimated residual life of the asset | Number Max: 100 Min: 0 Number of decimal places: 0 Units: years | EA6 | P09 Operations | No | Feature.Attribute.Name.ResidualLife | 27-04-2021 View history Request changes |
Residual Life Date The date the residual life was assessed | Date | EA6 | P09 Operations | No | Feature.Attribute.Name.ResidualLifeDate | 27-04-2021 View history Request changes |
Responsibility Split - Organisation An organisation that has shared responsibility for the asset. Multiple options can be made | Picklist Environment Agency Local Authority Internal Drainage Board Water Company Transport Authority Other Public Body Private Individual, Company or Charity Unknown | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibilitySplitOrganisation | 27-04-2021 Picklist edited 05-09-2022 View history Request changes |
Responsibility Split - Organisation Function The department within the organisation with shared responsibility | Picklist Air Quality Analysis & Reporting Corporate Assets Environment Management FCRM Fisheries, Biodiversity and Geomorphology (FBG) Ground Water & Contaminated Land Hydrometry and Telemetry Navigation Water Quality Water Resources | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibilitySplitOrganisationFunction | 27-04-2021 View history Request changes |
Responsibility Split - Percentage Split The percentage of the organisation's responsibility for the asset. All values must total 100% | Number Max: 99 Min: 0 Number of decimal places: 0 Units: % | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibilitySplitPercentageSplit | 27-04-2021 View history Request changes |
Responsible Officer Who is the Responsible Officer of the Asset? This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.ResponsibleOfficer | 27-04-2021 View history Request changes |
Schedule Date The scheduled date of the inspection or assessment. | Date | EA6 | P15 Inspection | Yes | Feature.Attribute.Name.ScheduleDate | 27-04-2021 View history Request changes |
Serial Number The serial number of the asset | Text Max Length: 50 | EA4 | P09 Operations | No | Feature.Attribute.Name.SerialNumber | 27-04-2021 View history Request changes |
SIA Contingency Document Link The link to the SIA contingency document. Applicable only where FCRM Strategically Important Asset (SIA) = True and SIA Contingency Plans in Place = True | Link | EA7 | P08 Impacts | No | Feature.Attribute.Name.SIAContingencyDocumentLink | 27-04-2021 View history Request changes |
SIA Contingency Plans in Place Are SIA contingency plans in place? Applicable only where FCRM Strategically Important Asset (SIA) = True | Boolean | EA7 | P08 Impacts | Yes | Feature.Attribute.Name.SIAContingencyPlansInPlace | 19-06-2024 View history Request changes |
SIA Reason for Submission The reason for the SIA submission. Mandatory where FCRM Strategically Important Asset (SIA) = True | Text Max Length: 2000 | EA7 | P08 Impacts | No | Feature.Attribute.Name.SIAReasonforSubmission | 27-04-2021 View history Request changes |
Site Liaison Officer Who is the Site Liaison Officer of the Asset? This is populated via a picklist in AIMS OM. | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.SiteLiaisonOfficer | 27-04-2021 View history Request changes |
Site Priority The priority of the Asset. Only applicable when MEICA Elements Present = True | Picklist High Medium Low | EA6 | P09 Operations | No | Feature.Attribute.Name.SitePriority | 27-04-2021 View history Request changes |
Spatial Quality The data quality flag for the spatial position of the asset | Picklist 1 - Good 2 - Adequate 3 - Suspect 4 - Poor 5 - Missing 6 - Unchecked | EA7 | P09 Operations | No | Feature.Attribute.Name.SpatialQuality | 27-04-2021 View history Request changes |
Supplier The supplier of the asset | Text Max Length: 50 | EA4 | P09 Operations | No | Feature.Attribute.Name.Supplier | 27-04-2021 View history Request changes |
Unknown or Not Maintained Is the asset not maintained? | Boolean | EA7 | P09 Operations | Yes | Feature.Attribute.Name.UnknownorNotMaintained | 27-04-2021 View history Request changes |
Warranty What is the span of the warranty of the asset? | Number Max: 3,000 Min: 0 Number of decimal places: 0 Units: months | EA4 | P09 Operations | No | Feature.Attribute.Name.Warranty | 27-04-2021 View history Request changes |
Warranty Expiry Date When will the warranty of the asset expire? Automatically calculated in AIMS OM as Delivery Date + Warranty. | Date | Auto | P09 Operations | No | Feature.Attribute.Name.WarrantyExpiryDate | 19-06-2024 View history Request changes |
Watercourse Alt Name An alternative name of the Watercourse where the Asset is located. Automatically populated in AIMS OM based on a geographic lookup. | Text Max Length: 200 | Auto | P09 Operations | No | Feature.Attribute.Name.WatercourseAltName | 19-06-2024 View history Request changes |
Watercourse Details Set By User Were the Watercourse details set by the user? | Boolean | EA6 | P15 Inspection | Yes | Feature.Attribute.Name.WatercourseDetailsSetByUser | 11-07-2024 View history Request changes |
Watercourse GML ID The GML ID of the Watercourse where the Asset is located | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.WatercourseGMLID | 11-07-2024 View history Request changes |
Watercourse Name The name of the Watercourse where the Asset is located. Automatically populated in AIMS OM based on a geographic lookup. | Text Max Length: 200 | Auto | P09 Operations | No | Feature.Attribute.Name.WatercourseName | 19-06-2024 View history Request changes |
Watercourse Valid From The date that the watercourse was recorded, established, constructed or classified as main river | Text Max Length: 50 | EA6 | P09 Operations | No | Feature.Attribute.Name.WatercourseValidFrom | 11-07-2024 View history Request changes |
WFD Waterbody ID The ID of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.WFDWaterbodyID | 27-04-2021 View history Request changes |
WFD Waterbody Name The name of the Water Framework Directive waterbody within which the asset falls. System generated based on Spatial Lookup | Text Max Length: 50 | Auto | P09 Operations | No | Feature.Attribute.Name.WFDWaterbodyName | 27-04-2021 View history Request changes |
WLB Asset Target Condition The WLB target condition of the Asset. Only applicable where the element is maintained by Water, Land and Biodiversity (WLB) | Picklist 0 - Unchecked 1 - Very Good 2 - Good 3 - Fair 4 - Poor 5 - Very Poor | EA7 | P09 Operations | No | Feature.Attribute.Name.WLBAssetTargetCondition | 28-08-2024 View history Request changes |
Work Type The type of work that is required. | Picklist Ad Hoc Inspection Capital Defence Capital Recondition Capital Maintenance Post Incident Inspection Post Remedial Work Inspection Scheduled Inspection Scheduled Maintenance - Frequent Scheduled Maintenance - Intermittent Unscheduled Maintenance - Reactive | EA7 | P15 Inspection | No | Feature.Attribute.Name.WorkType | 27-04-2021 View history Request changes |
Year Last Refurbished The year the asset was last refurbished | Number Max: 2,999 Min: 1,900 Number of decimal places: 0 | EA6 | P09 Operations | No | Feature.Attribute.Name.YearLastRefurbished | 27-04-2021 View history Request changes |
Year of Manufacture The year that the asset was manufactured | Number Max: 2,099 Min: 1,800 Number of decimal places: 0 | EA4 | P09 Operations | No | Feature.Attribute.Name.YearOfManufacture | 27-04-2021 View history Request changes |