sampling point
Cut At Buck Bridge, Binfield
Description | CUT AT BUCK BRIDGE, BINFIELD |
---|---|
Sampling point ID | TH-PTHR0125 |
Type | Freshwater – Rivers |
Status | open |
Location |
easting northing: 485610 174580 lat lon: 51.463723, -0.76903 |
Area | West Thames |
Sub-Area | L&W South Wt |
Summary | 242 samples taken between 2024 and 2000 |
Determinands
Determinands identify a property which can be measured on a sample or the sampling environment, together with the units in which the result of that measurement will be expressed.
40 determinands have been measured at this site
- Action taken
- Alky pH 4.5
- Ammonia(N)
- AmoniaTotYSI
- BOD ATU
- C - Org Filt
- Ca Filtered
- Calcium - Ca
- Chloride Ion
- Cr Hex Filt
- Cr Hexavalnt
- Cr- Filtered
- Cu BLM Bio
- Cu Filtered
- Fe- Filt
- Hardness
- Magnesium-Mg
- Mg Filtered
- Mn BLM Bio
- Mn- Filtered
- N Oxidised
- NH3 un-ion
- Ni BLM Bio
- Ni- Filtered
- Nitrate-N
- Nitrite-N
- O Diss %sat
- Orthophospht
- Oxygen Diss
- Pb BLM Bio
- Pb Filtered
- SI-EC-F
- SI-GQA
- Sld Sus@105C
- Temp Water
- Type of Flow
- Zinc - as Zn
- Zn- Filtered
- pH
- pH in-situ
Sampling results
Displaying the twenty most recent samples. You can see all 242 sample results (note that in some cases this may take a considerable time, and use significant data bandwidth).