WFD RBMP2 Economic analysis 2015_Scenario 3 and 4_v1.10
Summary
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. The Scenario 3 dataset considers all technically feasible improvements of water bodies towards good status regardless of cost. The baseline option is created from scenario 2 plus scenario 3. The Scenario 4 dataset considers all technically feasible improvements of water bodies only where benefits exceed costs. The proposed option is created from scenario 2 plus scenario 4. It contains data for all water bodies in England.
Categories
Use limitation statement
There are no public access constraints to this data. Use of this data is subject to the licence identified.
Licence
Open Government LicenceAttribution statement
© Environment Agency copyright and/or database right 2016. All rights reserved.
Technical information
Update frequency
notPlanned
Lineage
Data was collated by the Environment Agency and extracted from the NASS database on 14 Aug 2015
Spatial information
Coordinate reference system
http://www.opengis.net/def/crs/EPSG/0/27700Geographic extent
- Latitude from: 49.943 to 55.816
- Longitude from: -6.236 to 2.072
Metadata information
Language
English
Metadata identifier
80deb65c-2302-4dbf-9ad0-d34270ad1b5a
Published by
Environment Agency
Contact publisher
Defra Data Services ForumDataset reference dates
Creation date
17 August 2016
Revision date
N/A
Publication date
N/A
Period
- From: 31 December 2015
- To: 31 December 2021
Search
Data and Supporting Information
Data services and download by area of interest | Link | Action |
---|---|---|
WFD RBMP2 Economic analysis 2015_Scenario 3 and 4_v1.10 Download | Open link |