2nd cycle measures not linked to 2021 element outcomes v2
Summary
This dataset contains measures not linked to 2021 element outcomes, produced to support the cycle 2 river basin management plans. It contains English river basin districts and the cross border Severn. The spreadsheet contains a summary of measures that will achieve additional environmental outcomes for 2021. The additional environmental outcomes from these measures are described in section 2.8 of Part 1 of the river basin management plan.
The measures listed here are not linked to element outcomes in specific water bodies because there is not enough confidence (in location or scale of improvement or both) to predict specific outcomes.
Categories
Keywords
Use limitation statement
There are no public access constraints to this data. Use of this data is subject to the licence identified.
Licence
Open Government LicenceAttribution statement
© Environment Agency copyright and/or database right 2015. All rights reserved.
Technical information
Update frequency
notPlanned
Lineage
Data was extracted from the Environment Agency database NASS on 26 November 2015
Spatial information
Coordinate reference system
http://www.opengis.net/def/crs/EPSG/0/27700Geographic extent
- Latitude from: 49.943 to 55.816
- Longitude from: -6.236 to 2.072
Metadata information
Language
English
Metadata identifier
a2a9667b-fc1d-4115-b806-8b785689d430
Published by
Environment Agency
Contact publisher
Defra Data Services ForumDataset reference dates
Creation date
14 August 2015
Revision date
N/A
Publication date
N/A
Period
- From: 26 November 2015
- To: 22 December 2021
Related datasets
Search
Data and Supporting Information
Data services and download by area of interest | Link | Action |
---|---|---|
2nd cycle measures not linked to 2021 element outcomes v2 Download | Open link |