Skip to main content

Change your cookie settings

We cannot change your cookie settings at the moment because JavaScript is not running in your browser. To fix this, try:

  1. turning on JavaScript in your browser settings
  2. reloading this page
View cookies

Change your cookie settings

We cannot change your cookie settings at the moment because JavaScript is not running in your browser. To fix this, try:

  1. turning on JavaScript in your browser settings
  2. reloading this page
View cookies
  1. Home
  2. Search
  3. WFD (Water Framework Directive) Cycle 1 and Cycle 2 water body change log

WFD (Water Framework Directive) Cycle 1 and Cycle 2 water body change log

Summary

This spreadsheet contains information regarding changes made to water bodies (and their spatial representations) reported in the two WFD (Water Framework Directive) cycle RBMP (River Basin Management Plans). Please note that the Environment Agency no longer provide classification data for water bodies in Wales - this is now available from Natural Resources Wales. However, this data DOES include Wales since EA did report welsh data in Cycle 1.

Categories

Use limitation statement

There are no public access constraints to this data. Use of this data is subject to the licence identified.

Attribution statement

© Environment Agency copyright and/or database right 2016. All rights reserved.

Technical information

Update frequency

asNeeded

Lineage

Post Cycle 1 the river water bodies were mapped from the 1:50k CEH river centreline to the Detailed River Network, the Agency’s high quality river network. As part of this process, a QA of the water bodies (used in the first River Basin Management Plans) was carried out to ensure that they were sensible and fit for purpose. This review was carried out by our Area staff, and tried to address known issues raised by external parties, as well as their own concerns. The review included all the water body categories. All defined water bodies comply with the guidance for the definition of water bodies taken from the WFD, the implementation guidance, and further instruction from defra. In the majority of cases there was little or no change from the water body reported in the first cycle River Basin Management Plan (RBMP). In others, due to extensive merging or splitting of water bodies, there was a significant change. This process resulted in the creation of some new water bodies, eg by splitting a large water body into 2 small new ones, as well as the removal of many small water bodies which were below the size thresholds set out in the WFD guidance.

Spatial information

Coordinate reference system

N/A

Geographic extent

  • Latitude from: 49.943 to 55.816
  • Longitude from: -6.236 to 2.072
Metadata information

Language

English

Metadata identifier

a8ffc88a-a242-4edb-a368-d17b134f29f2


Published by

Environment Agency

Contact publisher

Defra Data Services Forum

Dataset reference dates

Creation date

29 July 2016

Revision date

08 December 2017

Publication date

N/A

Period

  • From: 31 December 2009
  • To: 31 December 2015

Search

Data and Supporting Information
Data services and download by area of interestLinkAction
Full downloads and supporting documentationFormatAction
WFD_Cycle_1_and_Cycle_2_water_body_change_log.xlsxXLSXDownload