Walton Channel B5B

Summary management approach

Approach to managed realignment requires discussion and further investigation regarding design and funding, to manage outcomes for navigation and estuary dynamics and ensure a holistic approach to the management of Hamford Water, including it's internationally important protected wildlife. A partnership approach will be needed to enable managed realignment options to be carried out, with the intention to continue to protect properties and infrastructure.

Map unavailable

Geographic data is unavailable for this area.

Generic approach assigned to this unit

Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.

Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.

0 to 20 years (2005 to 2025)

HL1Hold the lineMaintain/replace

Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.


20 to 50 years (2025 to 2055)

HL1Hold the lineMaintain/replace

Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.


50 to 100 years (2055 to 2105)

MR6Managed realignmentLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


Neighbouring units

The following units are within 1km of this one:

    Protected sites


    Actions for this unit

    All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.

    Reference NumberAction DescriptionAction Lead OrganisationAction Progress StatusPriority
    6Investigate options for delivery of potential managed realignment at Walton Channel, informed by outcomes of regeneration initiatives at Walton.Environment Agency and Tendring District CouncilProgressingMedium-low

    Download table as spreadsheet (CSV)

    Download SMP documents

    The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.

    The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.

    Data on this page

    Main report

    Appendices

    Changes and addendums

    Non-technical summary

    Supporting documents