Unit

Lulworth Cove (defended length) 5G07

Summary management approach

Allow existing structures to be maintained for as long as technically and economically possible, subject to the availability of alternative funds. Ongoing monitoring is recommended to inform if/when to realign defences in the future.

Generic approach assigned to this unit

Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.

Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.

0 to 20 years (2005 to 2025)

NI4No active interventionLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


20 to 50 years (2025 to 2055)

NI4No active interventionLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


50 to 100 years (2055 to 2105)

NI4No active interventionLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


Neighbouring units

The following units are within 1km of this one:

Protected sites

This area of coastline is not in or near a special protection area.

Data last updated: 2024-04-17

View Special Protection Area on the Data Services Platform

This area of coastline is in or near an area of outstanding natural beauty.

Data last updated: 2024-06-29

View Area of Outstanding Natural Beauty on the Data Services Platform

This area of coastline is in or near 2 special conservation areas.

Data last updated: 2024-04-17

View Special Area of Conservation on the Data Services Platform

This area of coastline is not in or near a ramsar wetland area.

Data last updated: 2024-04-03

View Ramsar Site on the Data Services Platform

There are no scheduled monuments near this area of coastline.

Data last updated: 2024-04-03

View Scheduled Monument on the Data Services Platform

This area of coastline is not in or near a local nature reserve.

Data last updated: 2024-06-29

View Local Nature Reserve on the Data Services Platform

There is a site of special scientific interest near this area of coastline.

Data last updated: 2024-06-29

View Site of Special Scientific Interest on the Data Services Platform

This area of coastline is not in or near a national nature reserve.

Data last updated: 2024-06-29

View National Nature Reserve on the Data Services Platform

There is a marine conservation zone near this area of coastline.

Data last updated: 2024-04-03

View Marine Conservation Zone on the Data Services Platform

Actions for this unit

All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.

Reference NumberAction DescriptionAction Lead OrganisationAction Progress StatusPriority
16.029Ensure SMP management approaches and their delivery supports the Management Objectives of the Dorset & East Devon's United Nations Educational, Scientific and Cultural Organization (UNESCO) World Heritage Site, as set out in the Jurassic Coast Partnership Plan. Engage with the Jurassic Coast Trust and follow UNESCO best practice for considering the potential impacts of activities on the Site's Outstanding Universal Value (OUV). This will include undertaking impact assessments specific to the World Heritage Site, supported by stakeholder consultation and consideration of mitigation/compensation.Pending agreementProgressingMedium-low
16.035.01Work with relevant organisations, landowners, private defence owners and local communities along this section of coast to develop a plan for long-term sustainable coastal resilience and adaptation to climate change.This will require significant ongoing engagement with key stakeholders and the local community, working with private defence owners to ensure they are undertaking adequate maintenance in the immediate future, and investigation of longer-term management and funding options.Environment Agency / Dorset CouncilNot yet startedMedium-low
16.030Update the 2012 SCOPAC Sediment Transport Study (STS) to include new Channel Coastal Observatory baseline data captured in 2022/23.Standing Conference on Problems Associated with the CoastlineNot yet startedMedium-low
16.035Engage and work with private defence owners to appraise the condition of their defences and ensure that ongoing maintenance is being undertaken in the immediate term to ensure the existing defences continue to provide protection.Environment Agency / Dorset CouncilNot yet startedLow

Download table as spreadsheet (CSV)

Download SMP documents

The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.

The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.