Uphill to Weston-super_x0002_Mare (south) 7E05
Summary management approach
Allow natural coastal evolution to continue as far as possible, undertaking dune monitoring and management if required. If monitoring identifies that the dunes are at risk of breaching, then construct a secondary defence embankment
Generic approach assigned to this unit
Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.
Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.
0 to 20 years (2005 to 2025)
MR4Managed realignmentNatural features
Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.
20 to 50 years (2025 to 2055)
MR4Managed realignmentNatural features
Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.
50 to 100 years (2055 to 2105)
MR4Managed realignmentNatural features
Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.
Neighbouring units
The following units are within 1km of this one:
- Axe Estuary left (west) bank (mouth to near Diamond Farm) 7E02
- Axe Estuary right (east) bank (near Diamond Farm to mouth) 7E03
- Axe Estuary mouth to Uphill 7E04
- Weston-super Mare 7E06
Protected sites
This area of coastline is in or near a special protection area.
Data last updated: 2024-04-17
View Special Protection Area on the Data Services PlatformThis area of coastline is not in or near an area of outstanding natural beauty.
Data last updated: 2024-06-29
View Area of Outstanding Natural Beauty on the Data Services PlatformThis area of coastline is in or near a special conservation area.
Data last updated: 2024-04-17
View Special Area of Conservation on the Data Services PlatformThis area of coastline is in or near a ramsar wetland area.
Data last updated: 2024-04-03
View Ramsar Site on the Data Services PlatformThere are no scheduled monuments near this area of coastline.
Data last updated: 2024-04-03
View Scheduled Monument on the Data Services PlatformThis area of coastline is not in or near a local nature reserve.
Data last updated: 2024-06-29
View Local Nature Reserve on the Data Services PlatformThere are 3 sites of special scientific interest near this area of coastline.
Data last updated: 2024-07-26
View Site of Special Scientific Interest on the Data Services PlatformThis area of coastline is not in or near a national nature reserve.
Data last updated: 2024-06-29
View National Nature Reserve on the Data Services PlatformThere are no marine conservation zones near this area of coastline.
Data last updated: 2024-04-03
View Marine Conservation Zone on the Data Services PlatformActions for this unit
All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.
Reference Number | Action Description | Action Lead Organisation | Action Progress Status | Priority |
---|
Download SMP documents
The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.
The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.
Data on this page
Main report
Appendices
- Appendix A - SMP Development
- Appendix B - Stakeholder Engagement
- Appendix C - Baseline Processes
- Appendix D - SEA Environmental Baseline Report (Theme Review)
- Appendix E - Issues Objectives
- Appendix F - Initial Policy Appraisal
- Appendix G - Preferred Policies Summary
- Appendix H - Economic Sensitivity
- Appendix I - SEA
- Appendix J - Appropriate Assessment
- Appendix K - WFD
- Appendix L - Metadata Bibliography
- Appendix M - Action Plan Tables