Summary management approach
Continue monitoring and maintenance of existing defences to protect the wider community and the A48.
Generic approach assigned to this unit
Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.
Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.
0 to 20 years (2005 to 2025)
HL1Hold the lineMaintain/replace
Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.
20 to 50 years (2025 to 2055)
HL1Hold the lineMaintain/replace
Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.
50 to 100 years (2055 to 2105)
HL1Hold the lineMaintain/replace
Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.
Neighbouring units
The following units are within 1km of this one:
- Northington Farm to Newnham Church GLO3
- The farm to the north of Broadoak to Hill Farm, Rodley GLO5
- Overton Lane to Hock Cliff SHAR4
Protected sites
This area of coastline is not in or near a special protection area.
Data last updated: 2024-04-17
View Special Protection Area on the Data Services PlatformThis area of coastline is in or near an area of outstanding natural beauty.
Data last updated: 2024-06-29
View Area of Outstanding Natural Beauty on the Data Services PlatformThis area of coastline is not in or near a special conservation area.
Data last updated: 2024-04-17
View Special Area of Conservation on the Data Services PlatformThis area of coastline is not in or near a ramsar wetland area.
Data last updated: 2024-04-03
View Ramsar Site on the Data Services PlatformThere are no scheduled monuments near this area of coastline.
Data last updated: 2024-04-03
View Scheduled Monument on the Data Services PlatformThis area of coastline is not in or near a local nature reserve.
Data last updated: 2024-06-29
View Local Nature Reserve on the Data Services PlatformThere are no sites of special scientific interest near this area of coastline.
Data last updated: 2024-06-29
View Site of Special Scientific Interest on the Data Services PlatformThis area of coastline is not in or near a national nature reserve.
Data last updated: 2024-06-29
View National Nature Reserve on the Data Services PlatformThere are no marine conservation zones near this area of coastline.
Data last updated: 2024-04-03
View Marine Conservation Zone on the Data Services PlatformActions for this unit
All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.
Reference Number | Action Description | Action Lead Organisation | Action Progress Status | Priority |
---|---|---|---|---|
9.2 | Encourage Network Rail to undertake an assessment of the current and future risks and resilience to flooding of the railway line. Develop a flood resilience and adaptation plan as appropriate. | Environment Agency | Progressing | Medium |
Download SMP documents
The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.
The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.
Data on this page
Appendices
- Appendix A - Development of the SMP
- Appendix B - Stakeholder engagement and consultation
- Appendix C - Baseline understanding
- Appendix D - Theme review
- Appendix E - Issues and features
- Appendix F - Policy development and appraisal
- Appendix G - Preferred management approach testing
- Appendix H - Economics
- Appendix I – Section A – SEA
- Appendix I – Section B – HRA
- Appendix I – Section Annexes – Policy and Plan Review
- Appendix J - WFD assessment
- Appendix K - Metadata and bibliographic database