The drain at Long Brook to the railway/A40 bridge MAI1

Summary management approach

Carry out maintenance to reduce impact of flooding to people, property and infrastructure as long as the economic benefits outweigh the costs. Adaptation with time scales determined by actual sea level rise.

Generic approach assigned to this unit

Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.

Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.

0 to 20 years (2005 to 2025)

MR6Managed realignmentLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


20 to 50 years (2025 to 2055)

HL1Hold the lineMaintain/replace

Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.


50 to 100 years (2055 to 2105)

HL1Hold the lineMaintain/replace

Where protection is currently provided by coastal defence structures or managed beaches, and the intention is to retain a defence along approximately the current alignment. This will involve replacing defences when needed. Defence type, method and standard of protection may be modified over time.


Neighbouring units

The following units are within 1km of this one:

Protected sites

This area of coastline is not in or near a special protection area.

Data last updated: 2024-04-17

View Special Protection Area on the Data Services Platform

This area of coastline is in or near an area of outstanding natural beauty.

Data last updated: 2024-06-29

View Area of Outstanding Natural Beauty on the Data Services Platform

This area of coastline is not in or near a special conservation area.

Data last updated: 2024-04-17

View Special Area of Conservation on the Data Services Platform

This area of coastline is not in or near a ramsar wetland area.

Data last updated: 2024-04-03

View Ramsar Site on the Data Services Platform

There are 2 scheduled monuments near this area of coastline.

Data last updated: 2024-04-03

View Scheduled Monument on the Data Services Platform

This area of coastline is in or near 2 local nature reserves.

Data last updated: 2024-06-29

View Local Nature Reserve on the Data Services Platform

There are no sites of special scientific interest near this area of coastline.

Data last updated: 2024-06-29

View Site of Special Scientific Interest on the Data Services Platform

This area of coastline is not in or near a national nature reserve.

Data last updated: 2024-06-29

View National Nature Reserve on the Data Services Platform

There are no marine conservation zones near this area of coastline.

Data last updated: 2024-04-03

View Marine Conservation Zone on the Data Services Platform

Actions for this unit

All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.

Reference NumberAction DescriptionAction Lead OrganisationAction Progress StatusPriority
HCR28Identify management triggers and thresholds for policy transition. The necessary monitoring must be implemented to inform assessments within an adaptation pathway approach and to update baseline erosion rates to take account of more recent storms.Defence ownerNot yet startedMedium-high
HCR28.1Using outcomes of the management triggers and thresholds work, any further studies into managed realignment options, agricultural land values (where agriculture is the primary land use) and implications for the Habitat Compensation and Restoration Programme, develop an adaptation strategy and identify potential funding streams.Defence ownerNot yet startedMedium-high
HCR28.2On completion of HCR action HCR28.1, revisit SMP management approach to ensure it reflects current management activity and future intent, update the SMP Tracker and SMP-Explorer and file for a Major Policy Change if required.Defence ownerNot yet startedMedium-high
10.01Identify where new MR defences will be, when they will be built and how they should be constructedEnvironment Agency (Severn Estuary Flood Risk Management Strategy)Complete
10.06Undertake a study into opportunities to remove flood embankmentsEnvironment Agency (Catchment Flood Management Plan)Complete
10.08Review the economic value of agricultural land at flood/erosion riskDefraComplete
10.09Undertake a study into opportunities to remove flood embankmentsEnvironment Agency (Catchment Flood Management Plan)Complete

Download table as spreadsheet (CSV)

Download SMP documents

The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.

The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.

Data on this page

Main report

Appendices

Planning leaflets