Dart Estuary - Halftide Rock to Blackstone Point 6B70

Summary management approach

Where no defences exist, allow natural coastal evolution through No Active Intervention but continue to maintain sections where there are existing defences.

Generic approach assigned to this unit

Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.

Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.

0 to 20 years (2005 to 2025)

NI4No active interventionLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


20 to 50 years (2025 to 2055)

NI4No active interventionLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


50 to 100 years (2055 to 2105)

NI4No active interventionLocal activity only

Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.


Neighbouring units

The following units are within 1km of this one:

Protected sites

This area of coastline is not in or near a special protection area.

Data last updated: 2024-04-17

View Special Protection Area on the Data Services Platform

This area of coastline is in or near an area of outstanding natural beauty.

Data last updated: 2024-06-29

View Area of Outstanding Natural Beauty on the Data Services Platform

This area of coastline is in or near a special conservation area.

Data last updated: 2024-04-17

View Special Area of Conservation on the Data Services Platform

This area of coastline is not in or near a ramsar wetland area.

Data last updated: 2024-04-03

View Ramsar Site on the Data Services Platform

There are 2 scheduled monuments near this area of coastline.

Data last updated: 2024-04-03

View Scheduled Monument on the Data Services Platform

This area of coastline is not in or near a local nature reserve.

Data last updated: 2024-06-29

View Local Nature Reserve on the Data Services Platform

There are no sites of special scientific interest near this area of coastline.

Data last updated: 2024-07-26

View Site of Special Scientific Interest on the Data Services Platform

This area of coastline is not in or near a national nature reserve.

Data last updated: 2024-06-29

View National Nature Reserve on the Data Services Platform

There are no marine conservation zones near this area of coastline.

Data last updated: 2024-04-03

View Marine Conservation Zone on the Data Services Platform

Actions for this unit

All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.

Reference NumberAction DescriptionAction Lead OrganisationAction Progress StatusPriority
16.156Develop an Asset Management Plan to guide maintenance of defences and develop a programme of works in the Dart Estuary to ensure that they continue to provide adequate defence against the risk of flooding. This should include investigation of the risks posed by flooding to the Waterhead Creek disused landfill site and future management requirements to manage this risk.Environment Agency/South Hams District CouncilNot yet startedMedium-low
16.030Update the 2012 SCOPAC Sediment Transport Study (STS) to include new Channel Coastal Observatory baseline data captured in 2022/23.Standing Conference on Problems Associated with the CoastlineNot yet startedMedium-low
16.157Quantify habitat losses and gains, and identify and secure sites for replacement habitat.Environment Agency/South Hams District CouncilNot yet startedLow

Download table as spreadsheet (CSV)

Download SMP documents

The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.

The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.

Data on this page

Main report

Appendices

Supporting Documents