Pentewan Harbour & village 8.2

Summary management approach

With consideration of local objectives for flood risk management and regeneration, investigate realignment options that would allow transition of the beach to a more sustainable position that could be maintained to at least the lifetime of the SMP. A scheme is currently under development to manage flood risk to the village from wave run at the northen end of the beach. This comprises a set-back reinforced beach bund, which will provide a 1 in 40 year standard of protection. The scheme is due to be built in 2024.

Generic approach assigned to this unit

Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.

Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.

0 to 20 years (2005 to 2025)

MR4Managed realignmentNatural features

Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.


20 to 50 years (2025 to 2055)

MR4Managed realignmentNatural features

Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.


50 to 100 years (2055 to 2105)

HL5Hold the lineNatural features

Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.


Neighbouring units

The following units are within 1km of this one:

Protected sites

This area of coastline is in or near a special protection area.

Data last updated: 2024-04-17

View Special Protection Area on the Data Services Platform

This area of coastline is in or near an area of outstanding natural beauty.

Data last updated: 2024-06-29

View Area of Outstanding Natural Beauty on the Data Services Platform

This area of coastline is in or near a special conservation area.

Data last updated: 2024-04-17

View Special Area of Conservation on the Data Services Platform

This area of coastline is not in or near a ramsar wetland area.

Data last updated: 2024-04-03

View Ramsar Site on the Data Services Platform

There are no scheduled monuments near this area of coastline.

Data last updated: 2024-04-03

View Scheduled Monument on the Data Services Platform

This area of coastline is not in or near a local nature reserve.

Data last updated: 2024-06-29

View Local Nature Reserve on the Data Services Platform

There are no sites of special scientific interest near this area of coastline.

Data last updated: 2024-06-29

View Site of Special Scientific Interest on the Data Services Platform

This area of coastline is not in or near a national nature reserve.

Data last updated: 2024-06-29

View National Nature Reserve on the Data Services Platform

There are no marine conservation zones near this area of coastline.

Data last updated: 2024-04-03

View Marine Conservation Zone on the Data Services Platform

Actions for this unit

All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.

Reference NumberAction DescriptionAction Lead OrganisationAction Progress StatusPriority
17.025Develop a community adaptation strategy to climate change to improve community resilience to flooding. Adaptation strategy included in Neighbourhood Planning.Pending agreementNot yet startedMedium

Download table as spreadsheet (CSV)

Download SMP documents

The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.

The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.

Data on this page

Main report

Appendices

Summaries

Supporting documents