Pentewan Beach 8.3
Summary management approach
Allow beach to respond naturally to sea level rise. Avoid constraining and reducing beach and dune width. Guide land use planning towards a roll back policy through a managed realignment approach, with consideration of implications for sustainable highway links in the area and ongoing local activity to manage the shoreline where required. The management approach at this location will be further informed by Cornwall Council's 'Making Space For Sand' project, which is being undertaken during the period 2021 - 2027, funded by the Environment Agency's Flood and Coastal Resilience and Innovation Programme.
Generic approach assigned to this unit
Management approaches depend on funding and relevant approvals and permissions. Adaptation to coastal change may be needed. If defences are present, some risk from flooding, erosion or ground instability may remain.
Time periods (short (0 to 20 years), medium (20 to 50 years) and long (50 to 100)) are approximate and do not signify precise dates of management transitions.
0 to 20 years (2005 to 2025)
NI4No active interventionLocal activity only
Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.
20 to 50 years (2025 to 2055)
MR4Managed realignmentNatural features
Where the intention is to maintain the flood or erosion risk management performance of a natural feature such as dune system, spit, or shingle barrier. This does not always mean fixing its position. The approach might involve active management of the feature or its surroundings to increase its width, length, height, or resilience. It does not involve building structures on or behind the natural feature.
50 to 100 years (2055 to 2105)
NI4No active interventionLocal activity only
Where the overall intention is for a natural shoreline, not to encourage new defences. In some areas, where specified in the Shoreline Management Plan, works to repair or construct short stretches of defence to provide localised protection (such as to a slipway, access point or isolated properties) may be considered by the Local Planning Authority. All works require relevant permissions.
Neighbouring units
The following units are within 1km of this one:
Protected sites
This area of coastline is in or near a special protection area.
Data last updated: 2024-04-17
View Special Protection Area on the Data Services PlatformThis area of coastline is in or near an area of outstanding natural beauty.
Data last updated: 2024-06-29
View Area of Outstanding Natural Beauty on the Data Services PlatformThis area of coastline is in or near a special conservation area.
Data last updated: 2024-04-17
View Special Area of Conservation on the Data Services PlatformThis area of coastline is not in or near a ramsar wetland area.
Data last updated: 2024-04-03
View Ramsar Site on the Data Services PlatformThere are no scheduled monuments near this area of coastline.
Data last updated: 2024-04-03
View Scheduled Monument on the Data Services PlatformThis area of coastline is not in or near a local nature reserve.
Data last updated: 2024-06-29
View Local Nature Reserve on the Data Services PlatformThere are no sites of special scientific interest near this area of coastline.
Data last updated: 2024-07-26
View Site of Special Scientific Interest on the Data Services PlatformThis area of coastline is not in or near a national nature reserve.
Data last updated: 2024-06-29
View National Nature Reserve on the Data Services PlatformThere are no marine conservation zones near this area of coastline.
Data last updated: 2024-04-03
View Marine Conservation Zone on the Data Services PlatformActions for this unit
All actions are subject to funding and approval, often by other parties than the Lead Organisation shown.
Reference Number | Action Description | Action Lead Organisation | Action Progress Status | Priority |
---|---|---|---|---|
17.026 | Develop a Beach and Dune Management Plan to establish viability of dune enhancement programme and improve understanding of processes, behaviour and sediment availability. Monitor key habitat types and areas, and enhance dune ecology and integrity while adapting caravan park. | Pending agreement | Not yet started | Medium |
17.028 | Deliver Pentewan Coastal and Flood Risk Management Scheme (Cornwall Council) to improve flood risk management and community resilience. | Cornwall Council | Progressing | Medium |
17.027 | Deliver actions for Making Space for Sand (MS4S) study site funded by the Flood & Coastal Resilience Innovation Programme (FCRIP) | Cornwall Council | Progressing | Medium-low |
17.032 | Develop an adaptation plan (supported by the Sustainable Coastal Communities project for the wider area). Ensure that the future flood risk implications to the community of not restoring the dunes as a more sustainable defence line, and the impact of the caravan park private defences on beach amenity, is communicated clearly as part of the ongoing engagement with the caravan park and wider community. | Pending agreement | Not yet started | Medium-low |
Download SMP documents
The information on this website represents the current SMP management approaches adopted by the local authorities within its area, and current actions needed to deliver them. These management approaches have been approved by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management and are considered to be local policy.
The documents below provide the full SMP adopted locally and approved by the Environment Agency at the time of publication. Some of the information has changed in response to new government policy, new evidence or new work identified.
Data on this page
Main report
- Chapter 1 - Introduction
- Chapter 2 - Environmental Assessment
- Chapter 3 - Basis for the Plan
Chapter 4 - Management Units:
- Introduction to the management units
- PDZ1 - Pencarrow Head to Gribbin Head - Introduction
- MA1 - Rame Head to Downderry
- MA2 - Downderry and Seaton
- MA3 - Seaton to Pencarrow Head
- PDZ2 - Pencarrow Head to Gribbin Head - Introduction
- MA4 - Pencarrow Head to Gribbin Head
- MA5 - Fowey Estuary (above Mixtow) inc tributaries
- PDZ3 - Gribbin Head to Black Head - Introduction
- MA6 - Gribbin Head to Par Docks
- MA7 - Par Docks to Black Head
- PDZ4 - Black Head to Zone Point - Introduction
- MA8 - Black Head to Dodman Point
- MA9 - Veryan Bay
- MA10 - Gerrans Bay
- PDZ5 - Zone Point to Nare Point - Introduction
- MA11 - Lower Fal
- MA12 - Upper Fal
- MA13 - Pendennis Point to Rosemullion Head
- MA14 - Helford
- PDZ6 - Lizard (Nare Point to Baulk Head - Gunwalloe) - Introduction
- MA15 - Lizard East (Nare Point to Lizard Point)
- MA16 - Lizard West (Lizard Point to Baulk Head)
- PDZ7 - Mounts Bay East (Baulk Head (Gunwalloe) to Marazion) - Introduction
- MA17 - Baulk Head to Trewavas Head
- MA18 - Trewavas Head to The Greeb
- PDZ8 - Mounts Bay West (The Greeb to Point Spaniard (Inc Marazion and St Michael’s Mount - Introduction
- MA19 - Marazion to Longrock
- MA20 - Longrock to Penzance
- MA21 - Penzance and Newlyn (Albert Pier to Sandy Cove)
- MA22 - Mousehole (Sandy Cove breakwater - Point Spaniard)
- PDZ9 - Penwith Peninsula (Point Spaniard to Clodgy Point) - Introduction
- MA23 - Point Spaniard to Land’s End
- MA24 - Land’s End to Clodgy Point (St Ives)
- PDZ10 - Clodgy Point to Godrevy Point - Introduction
- MA25 - Clodgy Point to Porthminster Point
- MA26 - Porthminster Point to Hayle Estuary
- MA27 - Hayle Estuary
- MA28 - Black Cliff to Godrevy Point
- PDZ11 - North Cliffs (Godrevy Point - Pentire Point West) Introduction
- MA29 - Godrevy Point to St Agnes Head
- MA30 - St Agnes Head to Pentire Point West
- PDZ12 - Newquay (Pentire Point West - Trevelgue Head) Introduction
- MA31 - Fistral Bay and Crantock
- MA32 - Newquay Bay
- PDZ13 - Trevelgue Head to Stepper Point - Introduction
- MA33 - Trevelgue Head to Trevose Head
- MA34 - Trevose Head to Stepper Point
- PDZ14 - Camel Estuary (Stepper Point to Pentire Point) - Introduction
- MA35 - Camel Estuary (Stepper Point to Trebetherick Point)
- MA36 - Trebetherick Point to Pentire Point
- PDZ15 - Pentire Point to Wanson Mouth - Introduction
- MA37 - Pentire Point to Boscastle
- MA38 - Boscastle to Wanson Mouth
- PDZ16 - Widemouth & Bude (Wanson Mouth to Lower Sharpnose Point) - Introduction
- MA39 - Wanson Mouth to Higher Longbeak
- MA40 - Higher Longbeak to Lower Sharpnose Point
- PDZ17 - Lower Sharpnose Point to Hartland Point - Introduction
- MA41 - Lower Sharpnose Point to Hartland Point
- PDZ18 - Isles of Scilly - Introduction
- MA42 - St Mary’s
- MA43 - St Martin’s
- MA44 - Tresco
- MA45 - Bryher
- MA46 - St Agnes and Gugh
Chapter 5 – Summary of Preferred Plan Introduction:
- Chapter 6 - Action plan
- Glossary
- Acknowledgements
Appendices
- Appendix A – SMP Development
- Appendix B – Stakeholder Engagement
- Appendix C - Baseline
- Appendix D – Theme Review Final Report
- Appendix E – Issues and Objectives
Appendix F - SEA:
- Appendix G – Scenario Testing
Appendix H - Economic Appraisal:
Appendix I - HRA:
- Appendix A Cornwall And Ios Smp2 Appropriate Assessment 1
- Appendix B Sssi Condition Tables
- Appendix D Hr01
- Appendix E Hr02
- Hra Appendix C1 Pdz10 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz11 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz12 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz13 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz14 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz16 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz18 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz1 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz2 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz3 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz4 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz5 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz6 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz7 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz8 Assessment Tablesv2 Submitted
- Hra Appendix C1 Pdz9 Assessment Tablesv2 Submitted
- Appendix J - Water framework Assessment
- Appendix K - GIS Data
- Appendix L - Adoption